ページ1に含まれる内容の要旨
L
H
C
I
Q
®
BUNN
™
SINGLE
SINGLE
A
OPERATING & SERVICE MANUAL
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
10698.0000B 11/93 ©1993 Bunn-O-Matic Corporation
U
O
U
T
I
I
T
D
O
N
!
1⁄2 gal 1 gal 1 1⁄2 gal
BUNN
SPRINGFIELD, ILLINOIS, U.S.A. MANUFACTURED BY BUNN-O-MATIC CORPORATION
MODEL S/N
VOLTS A.C. AMP WATTS
PHASE WIRE
ページ2に含まれる内容の要旨
INTRODUCTION This equipment will brew a half-gallon, gallon, or gallon and a half batch of coffee into an awaiting server at the push of a button and includes a hot water faucet for allied beverage use. The brewer is specifically designed ® for use with a BUNN 1.5GPR server. It is only for indoor use on a sturdy counter or shelf. WARRANTY Bunn-O-Matic Corp. (“Bunn”) warrants the equipment manufactured by it to be commercially free from defects in material and workmanship existing at the time o
ページ3に含まれる内容の要旨
USER NOTICES (cont.) 00831.0000 00656.0000 ! CAUTION HOT WATER 20201.5600 ELECTRICAL REQUIREMENTS CAUTION - The brewer must be disconnected from the power source until specified in Initial Set-Up. WHITE L2 RED L2 RED NEUTRAL 200 OR 240V.A.C. 120V.A.C. 120V.A.C. L1 BLACK L1 BLACK WHITE 208 or 240V.A.C. NEUTRAL 120V.A.C. L1 BLACK Requires 2-wire, grounded ser- “A" & "B” models require 2-wire, grounded service rated 200 volts ac, vice rated 120 volts ac, 20 amp, Requires 3-wire, grounded ser- singl
ページ4に含まれる内容の要旨
Electrical Hook-Up CAUTION – Improper electrical installation will damage electronic components. 1. An electrician must provide electrical service as specified. 2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source. 3. Remove the front panel beneath the sprayhead. Models with electronic control assemblies: Place the tank heater switch at the top of the control assembly in the “OFF” position. Models with electromechanical thermostats: Rotate the contr
ページ5に含まれる内容の要旨
INITIAL SET-UP (cont.) 4. Wait approximately twenty minutes for the water in the tank to heat to the proper temperature. 5. Place an empty server beneath the brew station. Place the Selector switch in the one-gallon position, the On/ Warmer switch in the upper position and initiate a brew cycle. 6. Place the On/Warmer switch in the lower “OFF” position after water has stopped flowing from the funnel, and check the water volume in the server. It should be 128 ounces. 7. If not, disconnect the b
ページ6に含まれる内容の要旨
ページ7に含まれる内容の要旨
Page 7