ページ1に含まれる内容の要旨
L
L
E
E
N
N
T
T
N
N
R
R
A
A
U
U
F
F
M
M
DUAL / GPR-DBC
®
WITH SMART FUNNEL
S
S
INSTALLATION & OPERATING GUIDE
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
To ensure you have the latest revision of the manual or to obtain the illustrated parts catalog, please visit
the Bunn-O-Matic website, at www.bunn.com. This is absolutely FREE, and the quickest way to obtain
the latest catalog and manual updates. Contact Bunn-O-M
ページ2に含まれる内容の要旨
BUNN-O-MATIC COMMERCIAL PRODUCT WARRANTY Bunn-O-Matic Corp. (“BUNN”) warrants equipment manufactured by it as follows: 1) All equipment other than as specified below: 2 years parts and 1 year labor. 2) Electronic circuit and/or control boards: parts and labor for 3 years. 3) Compressors on refrigeration equipment: 5 years parts and 1 year labor. 4) Grinding burrs on coffee grinding equipment to grind coffee to meet original factory screen sieve analysis: parts and labor for 3 years or 30,000 po
ページ3に含まれる内容の要旨
USER NOTICES The notices on this brewer should be kept in good condition. Replace unreadable or damaged labels. WARNING • DO NOT OVERLOAD CIRCUIT. • ALWAYS ELECTRICALLY GROUND THE CHASSIS. • DO NOT DEFORM PLUG OR CORD. • FOLLOW NATIONAL AND LOCAL ELECTRICAL CODES. • KEEP COMBUSTIBLES AWAY. FAILURE TO COMPLY RISKS EQUIPMENT DAMAGE, FIRE OR SHOCK HAZARD. READ THE ENTIRE OPERATING MANUAL BEFORE USING THIS PRODUCT 00986.0000F 10/07 ©1994 Bunn-O-Matic Corporation 00986.0000 00658.0000 As dir
ページ4に含まれる内容の要旨
ELECTRICAL REQUIREMENTS WARNING - The brewer must be disconnected from the power source until specified in Initial Set-Up. Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements. Requirements for brewers without an attached cord set are as follows: L2 WHITE/VIOLET 120 V.A.C. WHITE 208 OR 240 V A.C. NEUTRAL 120 V.A.C. L1 BLACK P1841 120/208 & 120/240 volt ac models Note: This electrical service consists of 3 current carrying conductors (Neutral
ページ5に含まれる内容の要旨
PLUMBING REQUIREMENTS This brewer must be connected to a cold water system with operating pressure between 20 and 90 psi (138 1 and 620 kPa) from a ⁄ " or larger supply line. A shut-off valve should be installed in the line before the brewer. 2 Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 kPa). 3 The water inlet fitting is ⁄ " flare. 8 1 3 NOTE: Bunn-O-Matic recommends ⁄ " copper tubing for installations of less than 25 feet and
ページ6に含まれる内容の要旨
OPERATING CONTROLS g f j e b b a P3268.25 h d d h c c OPERATING CONTROLS (a) MAIN ON/OFF SWITCH This switch, located under the brewer behind the right front leg, turns power on and off to all components in the brewer. (b) BATCH SELECTOR SWITCHES Pressing the switch corresponding to the Small, Medium, or Large batch selects the amount of coffee to be brewed. Pressing a different switch after a brew cycle has been initiated does not change the brew batch in progress. Light indicates the sel
ページ7に含まれる内容の要旨
COFFEE BREWING 1. Select the desired batch size on the grinder. It is not necessary to select a size on the brewer. 2. Insert a BUNN filter into the funnel. 3. Pour the proper amount of fresh ground coffee into the filter and level the grounds by gently shaking. 4. Slide the funnel into the funnel rails. If the grounds are not obtained through a grinder compatible with a Smart Funnel, a batch size must be chosen on the brewer. 5. Place an empty server under the funnel. 6 The ENABLE BREW switch