ページ1に含まれる内容の要旨
!
Serious Steel
894104 PEC DEC OPTION
Illl
I
ASSEMBLY INSTRUCTIONS
I
Revision:4/26/99
1
Part # 6820101
ページ2に含まれる内容の要旨
[ IMPORTANT NOTES’[ WELCOME TO THE WORLD OF SeriOUS ~e~!lt Please no~e: * Thank you for purchasing the Parabody 894104 PEC DEC OPTION. Please read these instructions thoroughly and keep them for future reference. This product r~m,,;t be assembl~l on a fiat, level surface to assure its proper function. * We recommend cleaning your product (pads and frame) on a regular brads, using warm soapy water. Touch-up paint can be purchased from your Parabody customer serape representative at (800) 328-9714
ページ3に含まれる内容の要旨
PARTS LIST DES ’,RIPTION QTY KE~ PART# DESCRIPTION QTY KEY PART # 2 1 X 1" GUIDE 1 12 61407O1 BEARING HOUSING 1 6818103 4 CABLE Pd~TAINING CLIP 13 6533501 1 6818403 PEC DEC ARM LEFT 2 5 3/8. 2" BOLT 3102933 1 14 3 6818503 PEC DEC ARM RIGHT 2 3/8 X 2-3/4" BOLT 15 3102922 1 6818303 CENTER PULLEY BRACKET 4 2 1/2 X 3-1/4" BOLT 16 3102918 1 6686802 PULLEY BRACKET 5 6 3/8- V~/ASHER 3102501 1 17 BACK PAD 6 6597402 5 " 3/8" LOCK NOT 18 3102801 2 7 6176201 4 X 12" ROLLER PAD 2 1/2’ RASHER 3102502 5 19 3-
ページ4に含まれる内容の要旨
FIGURE 2 STEP 2: ¯ Assemble t~vo 1 X 1" GLIDES (12) to the BEARING HOUSING (1) as sho~vn in FIGURE ¯ Insert t~vo 2" SQ. END CAPS (11) to the ends of the BEARING HOUSING (1) as shown in FIGURE 1/2 ~ 1/2 1/2 [ 1/2 [ 1/2 [ [ 1/2 5 6 I 4
ページ5に含まれる内容の要旨
FIGURE 3 STEP 3: ¯ Insert four 2" SQ. END CAPS (11) into the ends of the LEFT and RIGHT PEC DEC ARMS (2 & 3) as sho~vn in FIGURE ¯ Assemble two 4 X 12" ROLLER PADS (7) to the LEFT and RIGHT PEC DEC ARMS (2 & 3) as shown in FIGURE 3. (TI~P: Spray window cleaner on the inside of the roller pad to help ease assembly.)
ページ6に含まれる内容の要旨
3/.8 X 2" FIGURE 4 STEP 4: ¯ LOOSELY assemble two 3-1/2" PULLEYS (8) and two CABLE RETAINING CLIPS (13) to the CEN’IER PULLEY BRACKET (4) using two 3/8 X 2" BOLTS (14), two 3/8" WASHERS (17), and two 3/8" LOCKNUTS (18). See FIGURE /’FRAME UPRIGHT FIGURE 5 ~ STEP 5: SECURELY assemble the BEARING HOUSING (1) and the CENTER PULLEY BRACKET (4) to the UPRIGHT FRAME using two 1/2 X 3-1/4" BOLTS (16) and two 1/2" LOCKNUTS (20) as shown in FIGURE 1/2 [ 1/2 1/2 I 1/2 I I 1/2 [ 6 3 2 [ I I 0 [ I I I [ I
ページ7に含まれる内容の要旨
LOW HEIGHT FIGURE 6 STEP 6: Assemble the LEFT & RIGHT PEC DEC ARMS (2 & 3) to the BEARING HOUSING (1) using four 3/4" FLANGE BEARINGS (21), two 1/2" WASHERS (19), and m’o 1/2" LOW HEIGHT LOCK NUTS (22) as shown in FIGURE 6. (Tighten connection securely, then back nut off 1/8 turn or until arm rotates freely.)
ページ8に含まれる内容の要旨
UPRIGHT 3/8X2-3/4", FIGURE 7 STEP 7: SECURELY assembleBACKPAD (6) to theUPRIGHTFRAMEusingtwo 3/8X2-3/4"BOLTS (15) andtwo 3/8" WASHERS (17) as shown inFIGURE7. 1/2 [ 1/2 1/2 [ [ 1/2 [ 1/2 [ 1/2 6 1 I 1 I 1 8
ページ9に含まれる内容の要旨
STEP 8 Wrap the 94-1/2" CABLE (9) around one 3-1/2" PULLEY (8) and SECURELY assemble the PULLEY to the PULLEY BRACKET (5) using one 3/8 X 2" BOLT (14) and one LOCKNUT (18) as shown in FIGURE FIGURE 8 FIGURE 9 STEP 9: ¯ Insert each end of the 94-1/2" CABLE (9) into the bushings on the cams of the LEFT (2) & RIGHT (3) PEC ARMS, then the CABLE over the PULLEYS assembled to the CENTEt~ PULLEY BRACKET (4) as shown in FIGtYRE ¯ After CABLE (9) has been routed over the PULLEYS on the CENTEK PULLEY
ページ10に含まれる内容の要旨
BLOCK ~ "’~~3/8X2" 4-1/2" PULLEY,~ ~UPRIGHTFRAME 3/8X2-3/4" FIGURE 10 STEP 10: ¯ Route the end of the 134-3/4" CABLE (10) through the slot of the UPRIGHT FRAME then SECURELY assemble one previ- ously removed 4-1/2" PULLEY to the UPRIGHT FRAME using two previously removed 3/8 X 2-3/4" BOLTS, two 3/8" FLANGE SPACERS, two 3/8" WASHERS, and two 3/8" LOCK NUTS. (NOTE: The CABLE (10) s]aould be routed between the pulley and the retaining bolt as shown in FIGURE 10.) ¯ Wrap the CABLE (10) aorund one 3-
ページ11に含まれる内容の要旨
FIGURE 11 STEP 11: ¯ Wrap the CABLE (10) around one 3-1/2" PULLEY (8) and SECURELY assemble the PULLEY to the plate on the UPRIGHT FRAME using one 3/8 X 2" BOLT (14), one CABLE RETAINING CLIP (13), one 3/8" WASHER (17), and 3/8"LOCK NUT (18) as shown in FIGURE 11. (NOTE: Before tightening PULLEY, make sure RETAINING CLIP is positioned shown in FIGURE 11.) ¯ SECURELY thread the end of the CABLE (10) 3/4 of the way into into the threaded housing on the PULLEY BRACKET (5) SECURELY tighten jam nut