ページ1に含まれる内容の要旨
Serious
813102 VKR/CHIN/DIP
ASSEMBLY INSTRUCTIONS
Part# 6812201
Revision: 01/17/00
ページ2に含まれる内容の要旨
[IMPORTANT NOTES] WELCOME TO THE WORLD OF Please note: * Thank you for purchasing the Parabody 813102 VKRJCHIN/DIP. Please read these instructions thoroughly and keep them for future reference. This product must be assembled ¯ on a flat, level surface toassure its proper function.. * We recommendcleaning your product (pads and frame) oI~ a regular basis, using warm soapy water. Touch-up paint can be purchased from your Parabody customer service representative at (800) 328-9714. There is a risk a
ページ3に含まれる内容の要旨
PART# DESCRIPTION PART# DESCR1FHON 1 6102303 BASE CONNECTOR 2 9 3102802 3/8" LOCK NUT 14 2 6480003 " CHINBAR 1 10 3102904 3/8 X 3" BOLT 20 3 6480503 VKRSIDE : ...... 2 11 3103101 1-1/4X5" GRIP 2 4 6480903 UPPERBACK SUPPORT 12 3103103 1-1/4X7’ ChTdP 6 ¯ 5 6665902 - BACKPAD 1 "13 6236701 1-3/4" SQ. END CAP 1 6 6752702 ARM PAD 2 14 6405201 2" SQ. END CAP 4 7 310250 1 3/8" FLAT WASHER 34 15 6467001 2" SQ. COVER CAP 4 8 3102601 3/8" LOCK WASHER 6 FIGURE 1 STEP 1: ¯ Insert four 2" SQ. COVER CAPS (15)
ページ4に含まれる内容の要旨
.~3/8 X 3" ~3/8X3" FIGURE 2 STEP 2: ¯ LOOSELY assemble the UPPER BACK SUPPORT (4) to the VKR SIDES’, (3) using two 3/8 X 3" BOLTS (10), four 3/8" FLAT WASHERS (7), and two 3/8" LOCK NUTS (9) as shown in FIGURE ¯ LOOSELY assemble the two BASE CONNECTORS (1) to the VKR SIDE~g (3) using eight 3/8 X 3" BOLTS (10), sixteen 3/8" FLAT WASHERS (7), and eight 3/8" LOCK NUTS (9) as shown in FIGURE ¯ Insert one 2" SQ END CAP (14) into the the end of the UPPER BACK SU-PPORT (4) as shown in FIGURE I 1/2 [
ページ5に含まれる内容の要旨
FIGURE 3 STEP 3: ¯ LOOSELY assemble the CHIN BAR (2) to the VKR SIDES (3) using two 3/8 X 3" BOLTS (10), four 3/8" WASHERS (7), and two 3/8" LOCK NUTS. ¯ SECURELY tigten all connections made up to this point.
ページ6に含まれる内容の要旨
FIGURE 4 // STEP 4: SECURELY attach two ARM PADS (6) to the VKR SIDES (3) using four 3/8 X 3" BOLTS (10), four 3/8" WASHERS (8), and four 3/8" FLAT WASHERS (7) as shown in FIGURE 4. (NOTE: Place the high side of A1LM PAD toward the outside.) 1/2 1/2 I I 1/2 1/2 I 1/2 ] 1/2 I I 1 2 3 4 5 6
ページ7に含まれる内容の要旨
3/8 X 3" FIGURE 5 STEP 5: ¯ SECURELY assemble the BACK PAD (5) to the UPPER BACK SUPPOI~.T (4) using two 3/8 X 3" BOLTS (1 two 3/8" LOCK WASHEP~S (8), two 3/8" FLAT WASHERS (7) as shown in FIGUR~
ページ8に含まれる内容の要旨
FIGURE 6 STEP 6: ¯ Slide six 1-1/4 X 7" HANDLES (12) over the HANDLES of the VKR SIDES (4) and the CHIN BAR (2) as in FIGURE 6. ¯ Slide two 1-1/4 X 5" HANDLES (11) over the ARM PAD HANDLE S ofthe VKR S IDES (4) as shown FIGURE 6. (NOTE: Rubbing alcohol can be used on the inside of the grips to make them slide on easier.) Thank you for purchasing the Parabody 884101 SAFTEY RAIL ATTACI~IENT. If unsure ofproper use of equipment, call your local Parabody distributor or call the Parabody customer s