ページ1に含まれる内容の要旨
I
I
I
ページ2に含まれる内容の要旨
CHANGING DOOR LOWER LOWER WOOD mm) mm) mm) mm) - A maker. WOOD CALIBRATIONS maker SHIPBOARD OPERATION maker maker 2 dealer. ice local your from parts necessary the Order area. bin storage the into spilling from evaporator the over flowing water the keeps It grid. cutter the and evaporator the of edge lower the between hangs deflector This deflector. water a install and purchase to necessary be will it ship, a aboard installed is cube ice this When thermostat. each on label
ページ3に含まれる内容の要旨
UNPACK LOCATE F 66 A 1 6 make LEVEL 1 make mm) 3 valve. shut-off a and tubing copper soft OD (6 114” of inlet water cold A 1 require: will but unique is installation Each CODES LOCAL OBSERVE recommended. is sealer silicone-type A standards. those with dance accor- in floor the to it seal you product this stalling in- when that recommend we Therefore, vermin. ELECTRICITY of entrance the or spills from contamination prevent to order in rail bottom the at floor the to sealed be
ページ4に含まれる内容の要旨
THE . TO WATER . local 1 1 mm) maker u I . local 1 mm 5 I n n 1,v ,” V.Y. 4 - FITTING VALVE WATER TO CONNECT TO LINE WATER SUPPLIED FIELD BEND FIELD FOR HOLE MINIMUM) mm (32 MINIMUM l-1/4” DRAIN OPEN TO COMPRESSION RUN TUBE DRAIN RUBBER I.D. LINE WATER 11,111, m-1 IC 4,“” IE B> VIEW END RlGHT VIEW ACK inlet. drain to up HOLE THIS THROIIGH thoroughly line drain insulate to desirable be may It 3 standpipe. the of location proper the for 5 Figure to Refer tube. dra
ページ5に含まれる内容の要旨
- THE - POWER POWER 5 6. Figure See electrician. qualified a by installed your (consult permit codes local where and impossible is receptacle wall 3-prong grounded properly a have to receptacle wall the grounding properly and changing If customer the of obligation and responsibility personal PRONG. GROUND CORD SUPPLY THE the is it available, not is receptacle wall mating a If REMOVE CIRCUMSTANCES, ANY UNDER NOT, DO ordinances. and codes governing all with accordance in grounded re
ページ6に含まれる内容の要旨
WORKS Water WHEN FOLLOWING Water Water \ l WIRE 1 WHEN 0 6 7 FIGURE CORD SUPPLY POWER on remains grid Cutter 0 RECEPTACLE .L WAL f u OPENS. THERMOSTAT BIN FILLED, PS BIN STORAGE THE ..a PLUG 0 GROUNDING 3-PRONG BEGINS. PROCESS I il SCREW CUTTING THE AND EVAPORATOR =2 EYELET FROM RELEASED IS SLAB AFTER _ GROUNDING FREEZING RESUMES MACHINE (6’4 GROUND seconds. 120 to 60 takes cycle harvest Normal NOTE: etc.) PAINT, (REMOVE PIPE WATER PIPE.’ ON GROUNDEDCOLD
ページ7に含まれる内容の要旨
WIRING TO 115 1 Water adjustments. thermostat for 2 page see altitude, feet 2,000 above installed If control. thickness the set to trying before hours 24 for and ice expecting before hours 3 for run to unit Allow IMPORTANT: position. “ON” the to switch Turn 0 on. turned is water the certain Make 0 thoroughly. Rinse water). warm of quart a to soda tablespoons (2 solution Soda Baking a with cabinet of interior out wash starting, Before 0 I r---- Guide. Care and ------------------
ページ8に含まれる内容の要旨
make Water mm) mm). l-114” x l-114” (32 mm x 32 mm) 3A7 L5N Ont. Mississauga, U.S.A. in Printed Inc. Canada, KitchenAid 759080-T No. Part Licensee Inc. Canada, KitchenAid U.S.A. Inc. KitchenAid, of trademark registered a is ‘KitchenAid Grid Cube grill. Replace b (16 518” to (12 l/2” at thickness ice with obtained be will GRID CUTTER CUBE yield ice Maximum necessary. if adjust hours 24 after and thickness cube desired for Check operation. proper for level be must Unit plate. fre