ページ1に含まれる内容の要旨
GA9150A REMOTE-READY VALVE/PILOT kit
INSTRUCTION MANUAL
For All Single, Dual and Triple Burner
Natural and Propane/LP Gas Logs
WARNING: If the information in this manual is not
followed exactly, a fire or explosion may result causing
property damage, personal injury or loss of life.
Installation and service must be performed by a quali-
fied installer, service agency or the gas supplier.
WARNING: Improper installation, adjustment, al-
teration, service or maintenance can cause injury or
pr
ページ2に含まれる内容の要旨
INSTALLATION Btu/Hr Input Btu/Hr Input Minimum MODEL DESCRIPTION Natural Gas Propane Gas Vent Opening CVSR18 18" Single Burner 50,000 40,000 8" dia. CPVSR18 18" Single Burner 50,000 40,000 8" dia. CVSR24 24" Single Burner 60,000 50,000 8" dia. CPVSR24 24" Single Burner 60,000 50,000 8" dia. CVDR18 18" Dual Burner 55,000 45,000 8" dia. MD18 18" Dual Burner 55,000 45,000 8" dia. CVDR24 24" Dual Burner 65,000 55,000 8" dia. MD24 24" Dual Burner 65,000 55,000 8" dia. CVDR30 30" Dual Bur
ページ3に含まれる内容の要旨
Installation must include an equipment shutoff INSTALLATION valve, union and plugged 1/8" NPT tap. Locate Continued NPT tap within reach for test gauge hook up. Installation Items Needed NPT tap must be upstream from log set (see Before installing log set, make sure you have Figure 3, page 4). the items listed below. IMPORTANT: Install equipment shutoff valve • piping (check local codes) in an accessible location. The equipment • sealant (resistant to propane/LP gas) shutoff valve is for
ページ4に含まれる内容の要旨
PRESSURE TESTING GAS SUPPLY INSTALLATION PIPING SYSTEM Continued Test Pressures In Excess Of 1/2 PSIG Approved Flexible (3.5 kPa) Natural Gas Gas Hose (if allowed From Gas Meter 1. Disconnect log set and its individual by local codes) (5" W.C.** to 10.5" equipment shutoff valve from gas supply W.C. Pressure) piping system. Propane/LP 2. Cap off open end of gas pipe where equip- From External ment shutoff valve was connected. Regulator CSA Design-Certifie
ページ5に含まれる内容の要旨
L I 6. Install the inlet fitting into the inlet opening INSTALLATION of the gas control valve (see Figure 9). Use Continued thread sealant on the male pipe threads. Equipment 7. Place the burner pan assembly in the Shutoff Valve center of the fireplace floor. Make sure the front of pan faces forward. Gas Meter Gas Control Valve Figure 5 - Checking Gas Joints Burner Pan Assembly Equipment Propane/LP Shutoff Valve Supply Tank Burner Inlet Fitting (containing orifice) Control Knob Figure
ページ6に含まれる内容の要旨
L I PROPANE/LP GAS CONVERSION INSTALLATION To convert to propane/LP gas, the regulator pres- Continued sure must be reset also the burner inlet fitting 8. Thread the gas supply adaptor to the and pilot orifice must be replaced. The propane/ fireplace gas supply pipe. Adjust to most LP burner inlet fitting is supplied with the orifice convenient position. installed for a 24" log set. If you have an 18" or 30" 9. Install the gas connector tube to the gas set, you must change this orifice al
ページ7に含まれる内容の要旨
L O O L L I I I P P P F F O F F F F O O Mounting INSTALLATION Screws Continued GAS CONTROL VALVE CONVERSION Convert the gas control valve by changing out the valve regulator portion of the gas valve. 1. Using a TORX T20 or slotted screwdriver, re- move and discard the three mounting screws, pressure regulator tower and diaphragm/ spring components (see Figure 13). 2. Insure that the rubber gasket is properly positioned on the new pressure regulator Rubber assembly. Install the
ページ8に含まれる内容の要旨
INSTALLATION OPERATION Continued FOR yOUR SAFETy REMOTE CONTROL OPTION REAd BEFORE LIGHTING HRC100 WARNING: If you do not fol- If you are using the HRC100 remote control option, you must first connect the leads of low these instructions exactly, the receiver to the terminal block on the gas a fire or explosion may result control (see Figure 16). causing property damage, per- 1. Connect the leads to the male fast-on sonal injury or loss of life. terminals marked TH and TPTH. 2. Install a
ページ9に含まれる内容の要旨
L I P F F O OPERATION Ignitor Continued Button 4. Press in and turn control knob clockwise Control to the OFF position. Knob 5. Wait five (5) minutes to clear out any gas. Then smell for gas, including near the floor. If you smell gas, STOP! Follow “B” in the safety information. If you don’t smell gas, go to the next step. Figure 17 - Control Knob and Ignitor 6. Press in and turn control knob counter- Button Location (Shown as Supplied, No clockwise to the PILOT position. Contr
ページ10に含まれる内容の要旨
OPERATION Continued OPTIONAL REMOTE OPERATION Note: All remote control accessories must be purchased separately. Follow instructions included with the remote control. NOTICE: you must light the pilot before using the hand-held re- mote control unit. See Lighting Instructions, page 8. After lighting, let pilot flame burn for about one minute. Turn control knob to ON position. Slide the selector switch to the REMOTE position. Note: The burner may light if hand-held remote was on when sele
ページ11に含まれる内容の要旨
NOTES _____________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________
ページ12に含まれる内容の要旨
WARRANTY KEEP THIS WARRANTY Model (located on product or identification tag) _____________________________ Serial No. (located on product or identification tag) __________________________ Date Purchased __________________________ Keep receipt for warranty verification. DESA HEATING, LLC LIMITED WARRANTIES New Products Standard Warranty: DESA Heating, LLC warrants this new product and any parts thereof to be free from defects in material and workmanship for a period of one (1) year from the dat