ページ1に含まれる内容の要旨
®
Turn to the Expertg
Installation
Guide
This Installation Guide is intended to be
used in conjunction with the Owner's
Manual.
The Owner's Manual must first be read
thoroughly prior to installation of the Home
Standby generator.
A_ intended for outdoor installation only.
A_ Not intended for life support
applications.
c_0s
LISTED
ページ2に含まれる内容の要旨
ELECTRICAL INTERCONNECTION DRAWING ® Turn to the Expertg \ \ \ / N1 N2 23 194 I GENERATOR GROUND \ / \ (LOCATED ON THE REAR OF UNIT) / \ / GENERATOR OUTPUT CIRCUmT BREAKER 2 POLE / \ / \EARTH \ SPIKE "_ \ \ \ \
ページ3に含まれる内容の要旨
TO HOUSE BRANCH CiRCUiTS SPLICED USING WiRE NUTS EMERGENCY CiRCUiTS IllU 40A OR 70A 2-POLE CIRCUIT BREAKER i BAR SERVICE UL LISTED PANEL BOARD (8,10,12 OR 16 CIRCUIT TRANSFER SWITCH) CONNECTION BOX EXTERNAL CUSTOMER CONNECTION OF GENERATOR TO EXTERNAL CONNECTION PANEL 4 PmN L 1 CONNECTOR = N 0 I
ページ4に含まれる内容の要旨
The product contains or emits chemicals known to the state of California to cause cancer, birth defects or other reproductive harm. Study these SAFETY RULEScarefully before installing, operating or servicing this equipment. Becomefamiliar with this Installation Guide and the Instaflation & Owner'sManualincluded with the unit. The generatorcan Thank you for purchasing this model of the CARRIERproduct line. This operate safely, efficiently and reliably only if it is properly installed, model is a
ページ5に含まれる内容の要旨
Never use thegenerator orany ofitsparts asastep. Stepping on theunit /_ EXPLOSION HAZARDS/_ canstress andbreak parts, andmay result indangerous operating Do not smokearoundthe generator.Wipe up any fuel or oil spills conditions from leaking exhaust gases, fuelleakage, oilleakage, etc. immediately. Ensurethat no combustiblematerialsare left in the generatorcompartment,or on or near the generator,as FIRE or EXPLOSION mayresult.Keep the areasurrounding the generator clean ELECTRICAL HAZARD andfreef
ページ6に含まれる内容の要旨
It will be necessary to paya visit to your local municipaloffices to applyfor a buildingpermit. Buildingpermitsarenecessary to ensure proper installation, safety and adherenceto all local building code specifications.The location and phonenumber can befoundin the government sectionof yourlocal phonebook. Plan the locationof your generator.NOTE:Donot place the generatordirectlyundera window.Selectan area outsideof your homenearestyour incominggas service. Arrangefor installation of rigid gas pipi
ページ7に含まれる内容の要旨
lOa. Determinewherethe flexibleconduit will passthrough the housefrom inside to outside. Whenyouarecertainyouhaveclearanceoneachsideandwithin the wall, drill a small pilot holethrough the wall to markthe location. lOb. Usinga holesaw,drill a 1-3/4 inch diameterhole in the house'swall to allow the conduit to fit through. ID lla. Fromthe inside of the house,feed the endof the 30-foot conduit(which is pre-wiredfrom transfer switch)throughthe wall to outside. llb. Remove the threadedlocknut fromthe
ページ8に含まれる内容の要旨
- continuedfrompage7 WARNING If theutilitypowersupply isnotturnedoff,sparking can Wire nut the blackwire to the matching occurat thebatterypostsandcausean explosion. circuit lead wire from the emergency NOTE: Dielectricgreaseshouldbe usedonbatterypoststo aidin circuit breakerfrom load centerin the the prevention of corrosion. transferswitch.(Allcircuit wiresarecolor NOTE: In areas wheretemperaturesregularlyfall below10° F coded and labeled for easy (-12° O) it is recommended that a padtype batte