ページ1に含まれる内容の要旨
INSTALLATION &
OPERATION MANUAL
GAS INFRARED CHEESE MELTERS
MODEL
ICM24 ML-52470, 52476
ICM36 ML-52471, 52477
ICM48 ML-52472, 52478
ICM60 ML-52473, 52479
ICM72 ML-52474, 52480
MODEL ICM48
VULCAN-HART COMPANY, P.O. BOX 696, LOUISVILLE, KY 40201-0696, TEL. (502) 778-2791
FORM 30908 (11-94)
ページ2に含まれる内容の要旨
IMPORTANT FOR YOUR SAFETY THIS MANUAL HAS BEEN PREPARED FOR PERSONNEL QUALIFIED TO INSTALL GAS EQUIPMENT, WHO SHOULD PERFORM THE INITIAL FIELD START-UP AND ADJUSTMENTS OF THE EQUIPMENT COVERED BY THIS MANUAL. POST IN A PROMINENT LOCATION THE INSTRUCTIONS TO BE FOLLOWED IN THE EVENT THE SMELL OF GAS IS DETECTED. THIS INFORMATION CAN BE OBTAINED FROM THE LOCAL GAS SUPPLIER. IMPORTANT IN THE EVENT A GAS ODOR IS DETECTED, SHUT DOWN UNITS AT MAIN SHUTOFF VALVE AND CONTACT THE LOCAL GAS COMPANY OR GA
ページ3に含まれる内容の要旨
Installation, Operation, and Care of MODELS ICM24, ICM36, ICM48, ICM60 & ICM72 GAS INFRARED CHEESE MELTERS KEEP THIS MANUAL FOR FUTURE USE GENERAL The Vulcan Gas Infrared Cheese Melters use efficient gas heat and are available in 24, 36, 48, 60, or 72 inch widths. Each model has one or two burners; each burner has its own pilot light and control knob. GAS RATINGS Model ICM24 ICM36 ICM48 ICM60 ICM72 BTU Rating 20,000 BTU/hr 30,000 BTU/hr 40,000 BTU/hr 50,000 BTU/hr 60,000 BTU/hr INSTALLATION UNP
ページ4に含まれる内容の要旨
ASSEMBLY — Legs (optional) If using legs, four legs are required on 24, 36, and 48" models; six legs are required on 60 and 72" models. Assemble legs to the bottom of the unit through threaded holes in the four corners of the unit; on 60 and 72" models, the extra two legs mount at the middle of the front and back rails. ASSEMBLY — Wall Mounting Brackets (optional) If mounting the Cheese Melter on a wall: Attach the wall mounting bracket(s) to the wall with suitable fasteners (not supplied with
ページ5に含まれる内容の要旨
GAS CONNECTION Caution: The pipe thread compound used when installing pipes must be a type that is resistant to the action of liquified petroleum or propane gases. Codes require that a manual gas valve be installed in the gas supply line ahead of the appliance. Make sure the pipes are clean and free of obstructions, dirt, and piping compound. A pressure regulator is supplied loose with the Cheese Melter for installation in the gas supply line. The Natural gas regulator requires a pressure of
ページ6に含まれる内容の要旨
OPERATION WARNING: THE CHEESE MELTER AND ITS PARTS ARE HOT. USE CARE WHEN OPERATING, CLEANING, AND SERVICING THE CHEESE MELTER. CONTROLS (Fig. 4) Burner Valve — Turn fully ON or OFF by rotating the control knob 1/4 turn. Pilot Adjustment Screw Burner Valve OFF ON Fig. 4 The Cheese Melter rack can be positioned in one of the three operating levels. Complete Shut Down For complete shut-down: Turn the Burner Valve(s) off. Shut the manual gas valve off and the pilot tubes will go out. CLEANING Ch
ページ7に含まれる内容の要旨
– 7 –
ページ8に含まれる内容の要旨
– 8 – FORM 30908 (11-94) PRINTED IN U.S.A.