ページ1に含まれる内容の要旨
5L10
Congratulations and thank you for purchasing a Rubbermaid storage building.
BEFORE YOU BEGIN – BUILDING CODES
Be sure to check your local building codes, ordinances and restrictions, and applicable neighborhood governances.
BEFORE YOU BEGIN – SURFACE PREPARATION
To ensure proper assembly and performance your shed needs to be built on a solid, level surface.
A concrete or patio surface, or a treated-wood platform is recommended.
BEFORE YOU BEGIN – LOCATION
When choosing a location in yo
ページ2に含まれる内容の要旨
J RB D F G H L K Safety Glasses Gloves Qx5 A X T Utility Knife Rubber Mallet Description Part Number Assembly Letter Quantity Required Tools Phillips Screwdriver Front Floor 5L01 A 1 5L10 Safety Glasses Phillips Bit Drill Left Back 5L04 D 1 1/8" Drill Bit Gloves Right Back 5L05 F 1 Liquid Front Left Side 5L02 G 1 Soap Front Right Side 5L03 H 1 Utility Knife Q Wall Connector 5H75 5 Left Door 5L06 / 5L41 L 1 Rubber Mallet K Right Door 5L07 / 5L42 1 76 ¾" (2) Step Stools/ Steplad
ページ3に含まれる内容の要旨
CAUTIONS CARE & USE • Shed can be cleaned with water and mild detergent as CAUTION: Always use gloves when using a utility knife. necessary. DO NOT USE ABRASIVE DETERGENTS, CAUTION: Always use eye protection/safety glasses MATERIALS OR CLEANING TOOLS. during assembly. • To maximize your shed’s performance, remove CAUTION: When installing screws, do not overtighten. excessive snow and/or leaf accumulation from the roof. CAUTION: Drill only through initial panel wall, unless • In the event
ページ4に含まれる内容の要旨
2.0 Floor Installation Using a rubber mallet and screwdriver, knock out the Using a utility knife, cut the long side of each wall slot b. a. tabs for the door hinge, 2 places on Front Floor (A). tab and then use a rubber mallet and screwdriver to knock it out 8 places on Front Floor (A). 1. 2. A A Drill pilot hole through top surface of floor, 2 places on Front Floor (A). c. CAUTION: Drill through top surface of floor only! A
ページ5に含まれる内容の要旨
3.0 Wall Panel G Installation Using a screwdriver, punch out the screw holes on the a. top of Front Left Side (G) 2 places. Screw Holes G G A Drill a pilot hole (using 1/8" drill bit) in front lower corner Snap Front Left Side (G) into Front Floor (A). b. c. at location indicated by screw target. Hold Front Left Side (G) upright to prevent it from Note: This pilot hole is to be drilled through both walls. falling (until Left Back (D) is installed). G G click ALIGN ALIGN A
ページ6に含まれる内容の要旨
3.1 Wall Panel D Installation Using a screwdriver, punch out the screw holes on the a. top of Left Back (D) 4 places. Screw Holes D D Connect Left Back (D) into dovetails of Front Left Side (G). Engage snaps on bottom of Left Back (D) into b. c. Front Floor (A). HELPFUL HINT: Lubricate dovetails with liquid soap. D D 1 D G C DETAIL 3-3_E 2 OVERHEAD VIEW SCALE 1/1 1 DETAIL 3-1_B click G DETAIL 3-3_B SCALE 1/1 SCALE 1/1 2 A ALIGN ALIGN DETAIL 3-4_B AND 3-5_B DETAIL 3-6_B AND 3-7_B SCAL
ページ7に含まれる内容の要旨
3.2 Wall Panel H Installation Using a screwdriver, punch out the screw holes on the a. top of Front Right Side (H) 2 places. Screw Holes H H Drill a pilot hole (using 1/8" drill bit) in front lower corner Snap Front Right Side (H) into Front Floor (A). b. c. Hold Front Right Side (H) upright to prevent it from at location indicated by screw target. falling (until Right Back (F) is installed). Note: This pilot hole is to be drilled through both walls. H H click ALIGN ALIGN A
ページ8に含まれる内容の要旨
3.3 Wall Panel F Installation Using a screwdriver, punch out the screw holes on the a. top of Right Back (F) 4 places. Screw Holes F F Engage snaps on bottom of Right Back (F) into Connect Right Back (F) onto dovetails of Front Right c. b. Side (H). Front Floor (A). Align the lap joint between Left Back (D) and Right Back (F). HELPFUL HINT: Lubricate dovetails with liquid soap. F F 1 D F Align Lap Joints H 2 OVERHEAD VIEWS DETAIL 3-3_E DETAIL 3-3_E F SCALE 1/1 SCALE 1/1 DETAIL 3-1_B DE
ページ9に含まれる内容の要旨
Install Wall Connector (Q) 5 places, connecting Left Back and Right Back Panels (D and F). d. Position connectors in slots and slide down to snap in place. D F D F Install Wall Connectors OVERHEAD VIEW Q 2 click 4.0 Roof Panel J & Door Installation Install Front Roof (J) onto side sections. Align tongues on top of side walls into grooves in roof. a. J RB 1 1
ページ10に含まれる内容の要旨
Slightly raise front edge of roof enough to allow positioning of Roof Brace (RB) onto the side walls as shown. b. Lower the roof onto the walls and align Roof Brace (RB) into pocket in Front Roof (J). J RB Ensure Front Roof (J) is positioned against the back wall tongues. AA (8) c. From outside the shed, install one Screw (AA) at each corner. Hold the edge of the roof down firmly at the corners while installing each screw. Install remaining screws into remaining locations of back walls. Helpf
ページ11に含まれる内容の要旨
From inside the shed, install four Screws (AA) into the roof, Install Left Door (L) and Right Door (K) into hinge openings e. d. two on each side wall. of Front Floor (A) and hinge sockets in Front Roof (J). Note: The screws also have to go through the Roof Brace Note: Only raise front edge of roof enough to install the (RB) at each end to properly secure the roof! door hinge pins. A second person on the outside of the shed should hold down the edge of the roof firmly at each screw locat
ページ12に含まれる内容の要旨
5.1 Door Finishing Installation Install Lock Hasp (X) into opening on Right Door (K). Install Door Handle (T) onto Left Door (L) using four a. b. Screws (AA). AA (4) T K click L MAINTENANCE & SAFETY • Periodically check shed to assure it remains stable and the site remains level. • In areas of high winds it is recommended to anchor shed to platform or ground by holes in floor at designated location and secure with the proper fasteners (not included). • Wash shed with garden hose or a