ページ1に含まれる内容の要旨
C
N
E
R
G
T
I
INSTALLER / CONSUMER
SAFETY INFORMATION
PLEASE READ THIS MANUAL
BEFORE INSTALLING AND USING
APPLIANCE.
Dutchwest
WARNING!
Natural Vent Gas
IF THE INFORMATION IN THIS
MANUAL IS NOT FOLLOWED
Heater
EXACTLY, A FIRE OR EXPLOSION
Models: 2467, 2468
MAY RESULT CAUSING PROP-
ERTY DAMAGE, PERSONAL IN-
JURY OR LOSS OF LIFE.
FOR YOUR SAFETY
Installation and service must be per-
formed by a qualified installer, service
agency or the gas suppler.
WHAT TO DO IF YOU SMELL GAS:
• Do not try to li
ページ2に含まれる内容の要旨
Dutchwest Natural Vent Gas Heater Table of Contents PLEASE READ THE INSTALLATION & OPERATING INSTRUCTIONS BEFORE USING APPLIANCE. Thank you and congratulations on your purchase of a Dutchwest stove. IMPORTANT: Read all instructions and warnings carefully before starting installation. Failure to follow these instructions may result in a possible fire hazard and will void the warranty. Installation & Operating Instructions ........................................................................
ページ3に含まれる内容の要旨
Dutchwest Natural Vent Gas Heater Installation & Operating Instructions The Dutchwest Natural Vent Room Heater, Model Nos. 2467 This appliance is approved for bedroom installations in the and 2468, is a vented gas appliance listed to the ANSI standard U.S. and Canada. Z21.88b-2001 and CSA-2.33b-2001 for Vented Room Heaters, This appliance may be installed in an aftermarket* manufac- and CSA 2.17-M91, Gas-Fired Appliances For Use at High Alti- tured (mobile) home, where not prohibited by stat
ページ4に含まれる内容の要旨
Dutchwest Natural Vent Gas Heater Dutchwest Natural Vent Gas Heater Dimensions See Page 5 for Flue Collar Centerline Dimensions. 6³⁄₄" (172mm) C L Valve Inlet 24¹⁄₂" (622mm) 28³⁄₈" (721mm) Valve C L 4³⁄₈" Inlet (111mm) 12¹⁄₂" 23" (318mm) (584mm) 17" (419mm) Fig. 1 Dutchwest dimensions. 44 30002008
ページ5に含まれる内容の要旨
Dutchwest Natural Vent Gas Heater Ceiling Clearances Clearance Requirements Minimum Clearances to Combustible Materials 45" (1140mm) Measure side clearances as shown in Figures 2 through 5 from the outer edge of the cast iron stove top. Measure rear clearances from the outermost 72" (1829mm) surface of the sheet metal rear skirt. The Dutchwest heater is approved for installation into an alcove constructed of combustible materials to the dimensions and clearances shown in Figure 5. The same clear
ページ6に含まれる内容の要旨
Dutchwest Natural Vent Gas Heater Gas Specifications Venting Requirements and Options Max. Min. The Dutchwest must be properly connected to a listed Input Input 4” (100mm) Type B venting system or to an approved Model Fuel Gas Control BTU/h BTU/h Class A masonry or factory-built chimney system. In Canada, a complete relining of Class A chimney 2467 Nat Millivolt 28,000 20,000 systems is required. 2468 Prop Millivolt 28,000 19,000 The Dutchwest Natural Vent stove will accept decora- Weight: Fully
ページ7に含まれる内容の要旨
Dutchwest Natural Vent Gas Heater Passing Through a Venting Requirements Combustible Wall or Ceiling 36 An approved pass-through device is always required 34 A when a vent passes through a combustible wall or 32 B ceiling. Check with the maker of the vent system for 30 the correct listed devices that are available. A listed 28 pass-through device is required whether or not the 26 installation includes decorative pipe around the Type B 24 venting system. NOTE: It is essential to seal between 22
ページ8に含まれる内容の要旨
Dutchwest Natural Vent Gas Heater 4. Disassemble the inner shroud from the outer shroud Install the Optional Fan by removing the four screws, two on each side. 1. The fan kit includes a blower assembly and a 5. Place the grommet provided in the manual bag rheostat assembly, connected by a cable. The assembly on the inner shroud. Run the snapstat blower assembly mounts to the bottom rear of the extension assembly leads through the grommet stove, and the rheostat mounts to the left side of the tow
ページ9に含まれる内容の要旨
Dutchwest Natural Vent Gas Heater Venting System Assembly Snapstat Left Air Duct The venting collar is on the sheet metal draft hood/heat exchanger assembly, over the firebox. Use a B-vent adapter, from the same maker as the rest of the B-vent components, to join the first section of venting to the draft hood. The stove includes a spill switch. Operating this stove ST671 when not connected to a properly installed and main- tained venting system, or tampering with or disconnect- Fig. 12 Install
ページ10に含まれる内容の要旨
Dutchwest Natural Vent Gas Heater Attach the first section of venting to the B-vent adapter. Connect the Gas Supply Line Depending on the length of the individual venting Check the Rating Plate attached by a steel cable to the sections and the lengths of the decorative pipe, you firebox, to confirm that you have the appropriate firebox may need to slip the decorative pipe over the venting for the type of fuel to be used. The Dutchwest may be sections before attaching upper sections to lower ones
ページ11に含まれる内容の要旨
TP TPTH TH PILOT ADJ Dutchwest Natural Vent Gas Heater Burner Information The appliance must only use the gas specified on the rating plate, unless converted using a CFM Specialty Home Products Fuel Conversion Kit. Refer to Page 23 for the correct Fuel Conversion Kit for your model. Conversion instructions are provided with each kit and beginning on Page 16 in this manual. ST228 THIS APPLIANCE SHOULD BE CON- Fig. 20 Attach switch wires to valve. NECTED TO THE GAS SUPPLY ONLY BY A QUALIFIED GAS
ページ12に含まれる内容の要旨
D DU UT TC CH HW WE ES ST T Est. 1974 Dutchwest Natural Vent Gas Heater Install the Stove Front Left Log Insert the handle stub into the hole in the front casting. Right Fasten in place with the 3/8” locking nut provided. (Fig. Log 23) The front attaches to the stove by four steel tabs that engage with corresponding cast ribs onto the sides and bottom of the stove body. Position the front about 3” down from stove top and lift the plate to engage the upper tabs behind the adjacent ribs on the sid
ページ13に含まれる内容の要旨
Dutchwest Natural Vent Gas Heater Operation Your First Fire Read these instructions carefully and familiarize yourself with the burner controls. Locate the pilot assembly, Figure 25. Follow the lighting instructions on Page 14 exactly. During the first fire, it is not unusual to smell some odor associated with new logs, paint and metal being heated. Odors should dissipate within an hour or so, however, you can open a window to provide fresh air CO105c to alleviate the condition. Fig. 26 Correct
ページ14に含まれる内容の要旨
O 3 2 ON 1 T O Dutchwest Natural Vent Gas Heater Lighting and Operating Instructions FOR YOUR SAFETY READ BEFORE LIGHTING WARNING:If you do not follow these instructions exactly, a fire or explosion may result causing property damage, personal injury or loss of life. A. This heater has a pilot which must be lit manu- instructions. ally. When lighting the pilot follow these instruc- • If you cannot reach your gas supplier, call the tions exactly. Fire Department B. BEFORE LIGHTING smell all aroun
ページ15に含まれる内容の要旨
Dutchwest Natural Vent Gas Heater Troubleshooting / Honeywell #8420 Gas Control System NOTE: Before troubleshooting the gas control system, be sure the external gas shutoff is in the “ON” position. WARNING: REMOVE THE GLASS PANEL BEFORE PERFORMING ANY GAS CONTROL SERVICE WORK. SYMPTOM POSSIBLE CAUSES CORRECTIVE ACTION A. Defective or misaligned Using a match, light [ilot. If pilot lights, turn off pilot and 1. Spark ignitor will electrode at the pilot push the ignitor button again. If pilot will
ページ16に含まれる内容の要旨
O L L L I I Dutchwest Natural Vent Gas Heater 5. Remove the rear log bracket by loosening the screw Fuel Conversion Instructions and sliding the bracket up. CAUTION: Do not remove the screw completely. It would be very WARNING! This conversion kit shall be installed difficult to replace it. (Fig. 29) by a qualified service agency in accordance with the manufacturer’s instructions and all applicable Loosen Screw Remove Screws codes and requirements of the authority having Rear Log Bracket jurisdi
ページ17に含まれる内容の要旨
Dutchwest Natural Vent Gas Heater • Remove pilot orifice with allen wrench. (Fig. 32) 1/8" Air Shutter (LP Position) • Install the conversion orifice. • Reinstall pilot hood. Be sure to align hood with index tab. 3/8" Pilot Hood Configuration for Stove with Serial #’s up to #5483 Air Shutter (LP Position) Pilot Configuration for Stoves with Bracket Serial #’s Starting at #5484 ST726 CO105a Fig. 31 Remove pilot hood. Fig. 34 LP air shutter settings. Index Tab Left Burner Leg Allen Wrench Injec
ページ18に含まれる内容の要旨
Dutchwest Natural Vent Gas Heater Table 2. Injector Orifice Size Matrix Conversion to Natural Gas Input (BTU/h) Air Shutter Kit # Front Part # Rear Part # Minimum Maximum Setting 000-5021 #54 / .055” 20000130 #44 / .086” 30000334 19,000 28,000 Fully Closed Conversion to LP Input (BTU/h) Air Shutter Kit # Front Part # Rear Part # Minimum Maximum Setting 000-5022 #69 / .029” 30000513 #54 / .055” 20000130 21,500 28,000 3/8” Open 1818 30002008
ページ19に含まれる内容の要旨
D DU UT TC CH HW WE ES ST T Est 1974 . Dutchwest Natural Vent Gas Heater Maintenance Your Dutchwest Gas Heater will provide years of CAUTION service with minimal upkeep. The following procedures will help ensure that your stove continues to function TURN THE PILOT OFF BEFORE PAINTING. properly. ALLOW THE HEATER TO COOL COMPLETELY BEFORE PAINTING. Annual System Inspection Have the entire heater and venting system inspected Cleaning the Glass annually by a qualified gas technician. Replace any wo
ページ20に含まれる内容の要旨
Dutchwest Natural Vent Gas Heater Inspect the Vent System Annually Have the vent system inspected annually by a quali- fied technician. Shut off the main gas supply before inspecting the system. Both the inner exhaust pipe and the outer combustion supply pipe must be checked to confirm that they are unblocked and in good condition. Check the Gas Flame Regularly To ensure that the stove is operating properly, check ST582 the flames periodically to confirm they match Figure 39. Fig. 37 Release t