ページ1に含まれる内容の要旨
Logic Hotbox & Convector Fire
With upgradable control valve
Instructions for Use,
Installation and Servicing
For use in GB, IE (Great Britain and Eire)
This appliance has been certified for use in countries other than those stated. To install this appliance in these countries, it is essential to obtain the translat-
ed instructions and in some cases the appliance will require modification. Contact Gazco for further information.
IMPORTANT
The chimney must be swept before installation. Do not atte
ページ2に含まれる内容の要旨
Covering the following models Hotbox Convector 8306PBUC 8308PBUC P80306PBUC P8308PBUC 8306MCUC 8308MCUC P8306MCUC P8308MCUC CONTENTS PAGE APPLIANCE COMMISSIONING CHECKLIST 3 USER INSTRUCTIONS 4 INSTALLATION INSTRUCTIONS 8 Technical Specifications 8 Site Requirements 10 Installation 11 Commisioning 17 SERVICING INSTRUCTIONS 18 Servicing Requirements 18 Fault Finding 19 How to replace parts 21 Basic spare parts list 23 2
ページ3に含まれる内容の要旨
APPLIANCE COMMISSIONING CHECKLIST IMPORTANT NOTICE Explain the operation of the appliance to the end user, hand the completed instructions to them for safe keeping, as the information will be required when making any guaranteed claims. FLUE CHECK PASS FAIL 1. Flue is correct for appliance 2. Flue flow test 3. Spillage test GAS CHECK 1. Gas soundness & let by test 2. Standing pressure test mb 3. Appliance working pressure (on High Setting) mb NB All other gas appliances must be operating on full
ページ4に含まれる内容の要旨
USER INSTRUCTIONS knob anticlockwise increase the flame height and clockwise to 1. GENERAL decrease the flame height. 1.1 Installation and servicing must only be carried out by a THE YELLOW FLAMES WILL APPEAR WHEN THE FIRE HAS competent person. GAINED SUFFICIENT HEAT - TYPICALLY 10 TO 20 MINUTES. 1.2 In all correspondence, please quote the appliance type and serial number, which can be found on the databadge 3. TURNING THE FIRE OFF adjacent to the control knob. 3.1 To turn the fire off, loc
ページ5に含まれる内容の要旨
USER INSTRUCTIONS 7.3 Place the rear panel against the rear of the box and slide 6. CLEANING THE FIRE the side panels on either side of the flame baffle. Ensure they locate in the brackets at the top of the firebox. DO NOT 6.1 Remove the ceramic coals or pebblesand place on a dry, SLIDE THEM ALL THE WAY BACK. See diagram 5. clean surface. Remove the fuelbed and the burner cover gasket. 5 6.2 Clean the burner and tray assembly using a vacuum cleaner with soft brush attachment, ensure all deb
ページ6に含まれる内容の要旨
USER INSTRUCTIONS COAL LAYOUT C) COAL LAYOUT CONTINUED FROM FRONT ROW NOTE: THERE ARE TWO LARGE COALS IN A BAG INSIDE 7.7 Place four large coals behind the first row and one small THE MAIN BAG. THESE ARE ONLY TO BE USED WHEN A coal either end resting up against the side panels. CURVED FRONT SUCH AS THE HOLYROOD AND See diagram 10 RICHMOND ARE USED. DO NOT USE THE TWO LARGE COALS WHEN USING A FLAT FRONTED FRAME. 10 A) FRONT ROW COAL LAYOUT USING FLAT FIRE FRONTS 7.6 The front row is the
ページ7に含まれる内容の要旨
USER INSTRUCTIONS PEBBLE LAYOUT - CURVED AND FLAT FRONTS 16 7.12 ALL THE PEBBLES HAVE AN IDENTIFICATION ON THE UNDERSIDE. ENSURE THE PEBBLES ARE PLACED ONLY IN THEIR CORRECT POSITIONS. 7.13 Place the first row of pebbles on top of the front coal resting against the frame front. All the identifications are placed face down so they cannot be seen. See diagram 13. 13 6 5 4 5 2 AR1174 8. OXYGEN DEPLETION SENSOR 8.1 The appliance is fitted with an oxygen sensitive pilot sys
ページ8に含まれる内容の要旨
INSTALLATION INSTRUCTIONS TECHNICAL SPECIFICATION Covering the following models Hotbox Convector 8306PBUC 8308PBUC P80306PBUC P8308PBUC 8306MCUC 8308MCUC P8306MCUC P8308MCUC GAS CATEGORY 1 1 2h 3+ Natural Butane Propane Gas Type G20 G30 G31 Working Pressure 20 mb 29 mb 37 mb Gross Input kW High 6.7 6.7 6.7 Low 3.0 3.0 3.0 3 Gas Rate m /hr High 0.64 0.192 0.252 Low 0.29 0.086 0.113 Nox Class 1 1 Injector size 400 180 6x5 Rear Aeration Size 6x15 23x15 Front Min flue size 5” diameter 2 Min Flue si
ページ9に含まれる内容の要旨
INSTALLATION INSTRUCTIONS TECHNICAL SPECIFICATION 1 OVERALL EXTERNAL DIMENSIONS SIDE VIEW 2 MINIMUM DEBRIS COLLECTION SPACE REQUIREMENTS- (EXISTING MASONRY CHIMNEYS ONLY) 3 OVERALL EXTERNAL DIMENSIONS PLAN VIEW 9
ページ10に含まれる内容の要旨
INSTALLATION INSTRUCTIONS SITE REQUIREMENTS When fitting the Logic Convector fire and a Stovax Cast Iron Convector fireplace to a pre-cast letterbox flue with a 1. FLUE AND CHIMNEY REQUIREMENTS standard starter block, the 8315 spacer kit will be required, together with an extra deep 142mm rebate surround. 1.1 The chimney or flue system must comply with the rules in force, and must be a minimum of 125mm (5”) in diameter. The Combination Convector breast. Fireplace requires a Pre cast flue
ページ11に含まれる内容の要旨
INSTALLATION INSTRUCTIONS SITE REQUIREMENTS 2 4. VENTILATION It is important to ensure that any national ventilation requirements are taken into account during the installation of this appliance. 4.1 This appliance has a norminal input not exceeding 7.0kw and therefore does not normally require ant additional permanent ventilation. If, however, spillage is detected when commissioning the appliance, there may be insufficient natural ventilation and 215 additional ventilation may be requi
ページ12に含まれる内容の要旨
INSTALLATION INSTRUCTIONS INSTALLATION 4.2 Ensure that the gas supply is capable of delivering the required amount of gas, and is in accordance with the rules 1. UNPACKING in force. Please refer to the technical specification for the correct working pressure for the gas used. 1.1 Remove the appliance from its packaging, and check that it is complete and undamaged. 4.3 Soft copper tubing and soft soldered joints can be used but must not be closer than 50mm (2”) to the underside of the 1.2
ページ13に含まれる内容の要旨
INSTALLATION INSTRUCTIONS INSTALLATION 3 5 5.4 Gas pipe entry must come through the right hand side of 6.4 Pass the cables vertically through the 2 sets of eyebolts and the box. The rubber seal must be cut using a sharp knife to thread the ends through the holes in the lower back of the allow the isolating elbow to pass through it. Ensure the firebox. Pass the gas supply pipe through the hole in the rubber is not damaged when doing this. rubber seal (refer to section 5.2) and push the app
ページ14に含まれる内容の要旨
INSTALLATION INSTRUCTIONS INSTALLATION B) SCREW FIXING METHOD 7. ARRANGEMENT OF FUEL BED 6.8 Alternatively, this appliance can be secured back to the COMPONENTS fireplace opening using the screws and rawlplugs provided. Place the firebox centrally in the opening and mark the NOTE: CERAMIC PARTS ARE FRAGILE. THE SIDE AND positions of the 4 fixing holes. Drill the holes and insert the 4 rawlplugs. See diagram 7. REAR PANELS ARE REVERSIBLE. ONE SIDE IS PLAIN, THE OTHER SIDE IS REEDED. ASK THE
ページ15に含まれる内容の要旨
INSTALLATION INSTRUCTIONS INSTALLATION COAL LAYOUT 7.3 Place the rear panel against the rear of the box and slide the side panels on either side of the flame baffle. Ensure they NOTE: THERE ARE TWO LARGE COALS IN A BAG INSIDE locate in the brackets at the top of the firebox. DO NOT THE MAIN BAG. THESE ARE ONLY TO BE USED WHEN A SLIDE THEM ALL THE WAY BACK. See diagram 11. CURVED FRONT SUCH AS THE HOLYROOD AND RICHMOND ARE USED. DO NOT USE THE TWO LARGE 11 COALS WHEN USING A FLAT FRONTED
ページ16に含まれる内容の要旨
INSTALLATION INSTRUCTIONS INSTALLATION 7.9 Place one small coal either side on top of the flame baffle in 7.14 Working from the outside of the appliance, place the second each rear corner. Then place two large coals in between the row of pebbles against the rear of the first row. Note the two small coals. These coals should touch the rear panel. orientation of each pebble, as this is important to the See diagram 17. performance of the fire. See diagram 20. 20 17 7.15 Place the rear
ページ17に含まれる内容の要旨
INSTALLATION INSTRUCTIONS INSTALLATION / COMMISSIONING 1. COMMISSIONING 11. LIGHTING THE FIRE 1.1 Close all windows and doors to the room, check all controls, 11.1 Locate the control valve on the appliance. There are two and allow fire to burn on maximum for 5 minutes. Test for control knobs on the valve, the right hand knob controls spillage of flue products using a smoke match. Pass the the pilot ignition and the left hand knob controls the main lighted smoke match along the top front
ページ18に含まれる内容の要旨
SERVICING INSTRUCTIONS SERVICING 1. SERVICING REQUIREMENTS This appliance must be serviced at least once a year by a competent person. All tests must be serviced by best practice as described by the current CORGI recommendations. 1.1 Before any tests are undertaken on the appliance, conduct a gas soundness test for the property to ensure that there are no gas leaks prior to starting work. 1.2 Before any tests are undertaken on the appliance it is also recommended to fully check the operation
ページ19に含まれる内容の要旨
SERVICING INSTRUCTIONS FAULT FINDING CHARTS 19 IGNITION FUNCTIONAL CHECK 1 IGNITION FUNCTIONAL CHECK 2 PILOT WILL NOT LIGHT NO SPARK Ensure there is no debris around the pilot assembly, e.g. coal, soot, etc Ensure there is no debris around the pilot assembly, e.g. coal, soot, etc which could short the spark, clean the area. Check for fluff in the pilot which could short the spark, clean the area. aeration hole. See diagram 7. Consult users Operate the valve. NO YES YES instructions, retry Does
ページ20に含まれる内容の要旨
SERVICING INSTRUCTIONS FAULT FINDING CHARTS FLAME FAILURE FUNCTIONAL CHECK PILOT WILL NOT STAY LIT OR FIRE GOES OUT If the appliance goes out in use continually, this may mean that the oxygen depletion sensor has been activated. The appliance should not be used untill the cause has been found and rectified. Ensure there is no debris arounfd the pilot assembly, e.g. coal, soot, etc. Check for fluff in the pilot aeration hole. See diagram 7. Light the pilot and keep the control knob pushed in a