ページ1に含まれる内容の要旨
W4 5-0536 / C / 09.06.06
W4 5-0536 / C / 09.06.06
ページ2に含まれる内容の要旨
WARNINGS & SAFETY PRECAUTIONS Installation and service must be Do not store gasoline or other performed by a qualified installer, flammable vapours and liquids in the service agency or the gas supplier. vicinity of this or any other appliance. 4. 1. Follow the installation directions. 2. 5. 6. 3. WHAT TO DO IF YOU SMELL GAS Do not use any phone in your building. Immediately call your gas supplier Do not try to light any appliance. from a neighbor's phone. Follow the gas supplier's instructions
ページ3に含まれる内容の要旨
3 TABLE of CONTENTS PG2-6 INTRODUCTION 18 B LOWER REPLACEMENT Warnings and Safety Precautions Night Light Replacement Warranty Dimensions 19 DECORATIv E BRICK PANEL General Instructions INST ALLATION General Information Care of Glass & Plated Parts 20 AFK / WI FACE KIT 6-10 v ENTING INSTALLATION Vent lengths V enting Specifications 21 REMO TE AND v ALv E ACCESS Air Terminal Locations Burner Assembly Rem
ページ4に含まれる内容の要旨
4 napoleon products are manufactured under the strict Standard of the world recog- nized ISO 9001 : 2000 Quality Assurance Certificate. napoleon products are designed with superior components and materials, assembled by trained craftsmen who take great pride in their work. The burner and valve assembly are leak and test-fired at a quality test station. The complete fireplace is thoroughly inspected by a qualified technician before packaging to ensure that you, the customer, receives the qual
ページ5に含まれる内容の要旨
5 figure 1 58" 46" 3 17 /4" 5 37 /8" 4" DIA. 7" DIA. 1 22 /8" 21" 5" 7 13 /8" 2" 7 /8" 7 8 /8" 14" 24" 28" 28" Objects placed in front of the fireplace must be kept a GENERAL INSTRUCTIONS minimum of 48” from the front face of the unit. THIS g AS FIREPLACE SHOULD BE INSTALLED AND SER- Minimum clearance to combustible construction VICED BY A QUALIFIED INSTALLER to conform with local from fireplace and vent surfaces: codes. Installation practices vary from region to region and it fireplace f
ページ6に含まれる内容の要旨
6 CARE OF GLASS, AND PLATED PARTS Expansion / contraction nosies during heating up and cooling down cycles are normal and are to be expected. Change in flame appearance from “HI” to “L o ” is more evident in natural gas than in propane. Do not use abrasive cleaners to clean plated parts. Buff lightly with a clean dry cloth. The glass is 3/ 6” ceramic glass avail- able from your Napoleon / Wolf Steel Ltd. dealer. DO NOT SUBSTITUTE MATERIALS. Clean the glass after the firs
ページ7に含まれる内容の要旨
7 DEFINITIONS ELBOW v ENT LENGTH v ALUES for the following symbols used in the venting calculations feet inches and examples are: ° 0.03 0.5 > - greater than 5° 0.45 6.0 > - equal to or greater than 30° 0.9 .0 < - less than 45° .35 6.0 < - equal to or less than 90°* .7 3 .0 H - total of both horizontal vent lengths (H ) and offsets T R (H ) in feet O * the first 90° of fset has a zero value and is shown in the H - combined horizontal vent len
ページ8に含まれる内容の要旨
8 TOP EXIT / HORIz ONTAL TERMINATION v = v = 6 ft when (H ) > (v ) 1 T T T H = 3 ft 1 Simple venting configuration (only one 90° elbow) H = 5 ft 2 H = H + H = 3 + 5 = 8 ft R 1 2 H = .03(two 90° elbows - 90°) = .03( 80° - 90°) = .7 ft figure 6 O H = H + H = 8 + .7 = 0.7 ft T R O H + v = 0.7 + 6 = 6.7 T T See graph to determine the required verti- Formula : H < 4.2 v cal rise V for the required horizontal run T T T H . 4.2 v = 4. x 6 = 5. ft T T 0.7 < 5.
ページ9に含まれる内容の要旨
9 TOP EXIT v ERTICAL TERMINATION required vertical when (H ) < (v ) T T rise in feet See graph to v determine the T required vertical rise horizal vent run P ont lus offset in v for the required T feet H T horizontal run H . T The shaded area within the lines represents ac- ceptable values for H and V . T T F o r v e n t c o n fi g u r a t i o n s r e q u i r i n g m o r e t h a n z e r o 90° elbow (top exit) or one 90° elbow (rear exit), the following formulas apply: Fo
ページ10に含まれる内容の要旨
0 figure 12 W4 5-0536 / C / 09.06.06
ページ11に含まれる内容の要旨
INSTALLATION WALL AND CEILING PROTECTION For optimum performance it is recommended that all horizontal runs have a minimum ¼ inch rise per foot using flexible venting. For safe and proper operation of the fireplace, follow the venting instructions exactly. Horizontal t ermination: A clearance to combustibles of 2" must be maintained during the first 24” of vent- ing when pentrating combustible walls. The firestop spacer (W500-0292) supplied with the unit should be used to maintain this
ページ12に含まれる内容の要旨
USING FLEXIBLE v ENT COMPONENTS Use only approved aluminum flexible liner kits For safe and proper operation of the fireplace, follow the marked: venting instructions exactly. All inner exhaust and outer intake vent pipe joists may be sealed using either r ed r Tv high temp silicone seal- ant or Black high temp mill Pac with the exception of the “Wolf Steel Approved venting” as fireplace exhaust flue collar which must be sealed using identified by the stamp only on the mill Pac (not su
ページ13に含まれる内容の要旨
3 FIREPLACE v ENT CONNECTION 1. I n s t a l l t h e 4 ” d i a m e t e r a l u m i n i u m fl e x i b l e l i n e r t o t h e fireplace. Secure with 3 screws and flat washers. Seal the joint and screw holes using the high temperature sealant figure 20 (W573-0007 not provided). 2. I n s t a l l t h e 7 ” d i a m e t e r a l u m i n i u m fl e x i b l e l i n e r t o t h e fireplace. Attach and seal the joints. USING RIGID v ENT COMPONENTS The
ページ14に含まれる内容の要旨
4 v ERTICAL v ENTING INSTALLATION GAS INSTALLATION 1. Move the fireplace into position. Proceed once the vent installation is complete. Note : All gas connections must be contained within 2. Fasten the roof support to the roof using the screws the fireplace when complete. provided. The roof support is optional. In this case the vent- 1. The fireplace is designed to accept a ½” gas supply line. ing is to be adequately supported using either an alternate T h e fi r
ページ15に含まれる内容の要旨
15 CLEARANCE TO COMBUSTIBLES FRAMING MAINTAIN THESE MINIMUM CLEARANCES TO COM- It is best to frame your fireplace after it is positioned and the BUSTIBLES: vent system is installed. Use 2x4’s and frame to local build- Fireplace framing - 0” to stand-offs (top, rear & sides) ing codes. Fireplace finishing - 4” to sides of fireplace opening. Note: In order to avoid the possibility of exposed insulation 3 - 21 /4” to top of fireplace opening. or vapour barrier comin
ページ16に含まれる内容の要旨
O GAS VALVE N COMBUSTIBLE MATERIAL 6 MANTLE CLEARANCES Combustible mantle clearance FIRESTOP can vary according to the man- tle depth. Use the graph to SPACER 2" help evaluate the clearance STUD 1" GAP FROM INSULATION SLEEVE needed. 2" GAP FROM VENTING INSULATION 2" 6" SLEEVE figure 32 5" 4" STAND OFF TOP OF 3" SPACER 13 2" UNIT MH 12 11" 9" AE 11 12" 10" 8" TOP OF N I 10 TG FIREPLACE 9 L H OPENING 8 E T 7 0 1 2 3 4 5 6 7 MANTLE WIDTH ELECTRICAL CONNECTION do NOT use the fireplace if any
ページ17に含まれる内容の要旨
7 FINISHING DOOR REMOv AL LOG SHIPPING BRACKET Before the glass door can be removed, the optional front must be removed. figure 35 The glass door is secured to the top front edge of the firebox. Pull the handles of the latches forward, then lift the hooks out from the slots in the door frame to release the top of the door. Next, pivot forward until the top edge of the door clears the front of the fireplace. Next gripping the sides of the door lift the door
ページ18に含まれる内容の要旨
8 BLOWER REPLACEMENT 3. Remove the glass door, logs, rear log supports, brick The Napoleon PARK AVENUE comes equipped with a heat panels, air deflector , burner assy , panel support, panel sup- circulating blower. The blower is pre-wired and is controlled by port bracket. the remote control supplied with the unit. For control details, see operation. Pg. . 4. The blower mounting plate can now be removed. Remove the four screws that secure the plate to the firebox base
ページ19に含まれる内容の要旨
9 DECORATIv E BRICK PANEL INSTALLATION . Carefully remove the glass door and all logs. (Refer to 5. Rest the bottom edge of the rear panel on top the installation manual) of the rear portion of the air deflector at the back of the firebox and push into place. The rear panel is . Remove the two screws holding the front portion of the held in place when both side panels are in position. rear air deflector. Remove the pilot shield by removing the two
ページ20に含まれる内容の要旨
0 AFK / WI FACE KIT INSTALLATION . Attach screw and spacer as illustrated in Fig. 46 to the bottom of both sides of the front housing. SCREW & SPACER figure 46 . Attach the face plate bracket provided to the top edge of the front housing using #8 - / ” truss head screws as illustrated in Fig. 47. figure 47 figure 48 3. Lift and hook the faceplate over the spacers. Then push the top of the faceplate back until it comes in contact with the face plate bracket, then secure on the