ページ1に含まれる内容の要旨
Models:
Installers Guide
PIER-HVB-CE
ST-HVB-CE
LCOR-HVB-CE
RCOR-HVB-CE
0087
READ THIS MANUAL BEFORE INSTALLING OR
OPERATING THIS APPLIANCE. THIS INSTALLERS
WARNING: IF THE INFORMATION
GUIDE MUST BE LEFT WITH APPLIANCE FOR
FUTURE REFERENCE.
IN THESE INSTRUCTIONS IS NOT
FOLLOWED EXACTLY, A FIRE OR
EXPLOSION MAY RESULT CAUS-
WARNING: IMPROPER INSTALLATION,
ING PROPERTY DAMAGE, PER- ADJUSTMENT, ALTERATION, SERVICE
SONAL INJURY, OR DEATH. OR MAINTENANCE CAN CAUSE INJURY
OR PROPERTY DAMAGE. REFER TO
T
ページ2に含まれる内容の要旨
Safety and Warning Information These units MUST use one of the flue systems READ and UNDERSTAND all instructions carefully described in the Installing the Fireplace section of ! ! before starting the installation. FAILURE TO the Installers Guide. NO OTHER flue systems or FOLLOW these installation instructions may result components MAY BE USED. in a possible fire hazard and will void the warranty. This gas fireplace and flue assembly MUST flue Prior to the first firing of the fireplace, READ the
ページ3に含まれる内容の要旨
Table of Contents Safety and Warning Information .................................................. 2 Service Parts List ......................................................................... 4 Section 1: Approvals and Regulations .................................... 13 Appliance Certification ................................................................................. 13 Installation Regulations ................................................................................ 13 Section
ページ4に含まれる内容の要旨
Service Parts List PIER-HVB-CE Beginning Manufacturing Date: 6-04 Service Parts Diagram Ending Manufacturing Date: ______ 9 6 4 3 2 1 8 7 5 Log Assembly Part number list on following page. * 4 Heat & Glo • PIER/ST/L&RCOR-HVB-CE • 2068-900 Rev. H • 6/07
ページ5に含まれる内容の要旨
(NG, LP) Exploded Parts Diagram PIER-HVB-CE IMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealers VIP site. When ordering, supply serial and model numbers to ensure correct service parts. ITEM COMMON PART SERIAL # PART NUMBER Burner Orifice NG (#33DMS) 582-833 Burner Orifice LP (#51DMS) 582-851 Burner Orifice Butane (#53DMS) 582-853 1 End Glass Assembly GLA-MS 2 Glass Door Assembly GLA-6TROC 3 Burner Assembly (NG) 2068-011 3 Burner Assembly (LP & Butane)
ページ6に含まれる内容の要旨
Service Parts ST-HVB-CE Beginning Manufacturing Date: 6-04 Service Parts Diagram Ending Manufacturing Date: ______ 7 3 5 2 6 1 4 Log Assembly Part number list on following page. * 6 Heat & Glo • PIER/ST/L&RCOR-HVB-CE • 2068-900 Rev. H • 6/07
ページ7に含まれる内容の要旨
(NG, LP) Exploded Parts Diagram ST-HVB-CE IMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealers VIP site. When ordering, supply serial and model numbers to ensure correct service parts. ITEM COMMON PART SERIAL # PART NUMBER Burner Orifice NG (#33DMS) 582-833 Burner Orifice LP (#51DMS) 582-851 Burner Orifice Butane (#53DMS) 582-853 1 Glass Door Assembly GLA-6TROC 2 Burner Assembly (NG) 2068-011 2 Burner Assembly (LP & Butane) 2068-013 3Log Grate 2068-020 4
ページ8に含まれる内容の要旨
LCOR-HVB-CE Service Parts Beginning Manufacturing Date: 6-04 Service Parts Diagram Ending Manufacturing Date: ______ 9 1 8 2 6 4 3 7 5 Log Assembly Part number list on following page. * 8 Heat & Glo • PIER/ST/L&RCOR-HVB-CE • 2068-900 Rev. H • 6/07
ページ9に含まれる内容の要旨
(NG, LP) Exploded Parts Diagram LCOR-HVB-CE IMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealers VIP site. When ordering, supply serial and model numbers to ensure correct service parts. ITEM COMMON PART SERIAL # PART NUMBER Burner Orifice NG (#33DMS) 582-833 Burner Orifice LP (#51DMS) 582-851 Burner Orifice Butane (#53DMS) 582-853 1 End Glass Assembly GLA-MS 2 Glass Door Assembly GLA-6TROC 3 Burner Assembly (NG) 2068-011 3 Burner Assembly (LP & Butane)
ページ10に含まれる内容の要旨
RCOR-HVB-CE Service Parts Beginning Manufacturing Date: 6-04 Service Parts Diagram Ending Manufacturing Date: ______ 11 12 10 9 4 6 3 1 8 2 7 5 Log Assembly Part number list on following page. * 10 Heat & Glo • PIER/ST/L&RCOR-HVB-CE • 2068-900 Rev. H • 6/07
ページ11に含まれる内容の要旨
(NG, LP) Exploded Parts Diagram RCOR-HVB-CE IMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealers VIP site. When ordering, supply serial and model numbers to ensure correct service parts. ITEM COMMON PART SERIAL # PART NUMBER Burner Orifice NG (#33DMS) 582-833 Burner Orifice LP (#51DMS) 582-851 Burner Orifice Butane (#53DMS) 582-853 1 End Glass Assembly GLA-MS 2 Glass Door Assembly GLA-6TROC 3 Burner Assembly (NG) 2068-011 3 Burner Assembly (LP & Butane)
ページ12に含まれる内容の要旨
PIER-HVB-CE, ST-HVB-CE Service Parts L&RCOR-HVB-CE Beginning Manufacturing Date: 6-04 Valve Assembly Ending Manufacturing Date: ______ Standing Pilot 8 Valve Assembly 9 4 5 13 12 6 11 10 8 1 2 3 ITEM DESCRIPTION SERIAL # PART NUMBER 1 Shut Off Valve Assembly 302-330A 2 ON/OFF Wire Assembly 060-521A 3SIT Valve NG 060-524 3SIT Valve NG 060-526 4 Elbow Flex Assembly 530-302A 5 Burner Neck Gasket 438-407 6 Valve Plate Gasket 2005-140 7Piezo Ignitor 219-513 8Pilot Assembly NG 529-540A 8Pilot Assem
ページ13に含まれる内容の要旨
Approvals and Regulations 1 Appliance Certification Installation Regulations Before installation check that local distribution conditions, The Heat & Glo fireplace models discussed in this Installers nature of gas and pressure, and adjustment of the appliance Guide have been tested to certification standards and listed are compatible. by the applicable laboratories. This appliance must be installed with the rules in force, and used only in a sufficiently ventilated space. Consult Certification i
ページ14に含まれる内容の要旨
5-14 1/2 (133mm) (13mm) (2) 12 (306mm) Ø8 (204mm) 12 17-3/4 (305mm) Ø8 (451mm) 42-5/8 (204mm) (1082mm) ELECTRICAL ACCESS 42 17-3/4 17-15/16 (1067mm) 34-3/4 GAS LINE (451mm) (456mm) (882mm) ACCESS 9-5/8 (245mm) 9-11/16 24 2-5/16 32-1/8 4-1/16 (245mm) (610mm) (58mm) (816mm) (102mm) 37-7/16 4-1/2 4-3/4 (121mm) (950mm) (114mm) TOP FLUE COLLARS TOP STANDOFFS REAR FLUE COLLARS GAS CONTROLS & LABELS GAS LINE ACCESS ELECTRICAL Figure 1. Diagram of the PIER-HVB-CE ACCESS 14 Heat & Glo • PIER/ST/L&RCOR-
ページ15に含まれる内容の要旨
5-14 1/2 (133mm) (13mm) (4) 12 (306mm) Ø8 (204mm) Ø8 12 46-5/8 (204mm) (305mm) (1183mm) 42 (1067mm) 32-5/16 ELECTRICAL (820mm) 34-3/4 ACCESS 4-1/2 21 (882mm) (114mm) (533mm) GAS LINE ACCESS 8-1/2 (216mm) 2-5/16 4-1/16 (58mm) 36-3/16 24 (102mm) (919mm) 2-9/16 (610mm) 4-1/2 4-3/4 (64mm) (114mm) (121mm) TOP FLUE COLLARS TOP STANDOFFS REAR FLUE COLLARS GAS CONTROLS & LABELS GAS LINE ACCESS ELECTRICAL ACCESS Figure 2. Diagram of the ST-HVB-CE Heat & Glo • PIER/ST/L&RCOR-HVB-CE • 2068-900 Rev. H
ページ16に含まれる内容の要旨
5-14 (133mm) 1/2 (13mm) (4) Ø8 (204mm) 12 (306mm) 12 42-5/8 17-3/4 (305mm) Ø8 (1082mm) (451mm) (204mm) ELECTRICAL ACCESS 42 GAS LINE (1067mm) ACCESS 17-15/16 17-15/16 34-3/4 2-9/16 (456mm) (456mm) (882mm) (64mm) 9-11/16 10 9-11/16 32-1/8 (245mm) (254mm) (245mm) (816mm) 24-1/8 2-5/16 7-1/4 (612mm) 37-7/16 (58mm) (184mm) (950mm) 29-1/4 4-3/4 (743mm) (121mm) TOP STANDOFFS TOP FLUE COLLARS REAR FLUE COLLARS GAS LINE ACCESS GAS CONTROLS ELECTRICAL & LABELS ACCESS Figure 3. Diagram of the LCOR-HVB-CE
ページ17に含まれる内容の要旨
Installing the Fireplace 3 Step 1. Locating the Fireplace Minimum Clearances The diagram below shows space and clearance require- from the Fireplace to Combustible Materials ments for locating a fireplace within a room. mm inches Glass Sides or Ends ......... 914..................... 36 Floor ................................... 0 ....................... 0 GLASS GLASS Rear Flue ........................... 13 ..................... 1/2 RCOR-HVB-CE Metal Sides or Ends .......... 13 ................
ページ18に含まれる内容の要旨
Shows center of 254mm x 305mm (10”x12”) flue framing holes for top and rear flueing. The center of the hole is 25.4mm (one inch) above the center of the horizontal flue pipe. E D Framing should be constructed of 51mm x 102mm (2” x 4”) lumber or heavier. ST-HVB-CE PIER-HVB-CE L & R-COR-HVB-CE B B B C A A A C C NOTE: DIMENSIONS SHOWN IN CENTIMETERS AND (INCHES). Model A B C D E PIER-HVB-CE 107 (42-1/8) 108 (42-1/2) 58 (23) 91 (35-3/4) 122 (48) ST-HVB-CE 121 (47-5/8) 108 (42-1/2) 58 (23) 91 (35-3/
ページ19に含まれる内容の要旨
0ST DVP9 102mm (4 in.) 152mm (6 in.) 305mm (12 in.) DVP4 DVP6 DVP12 362mm (14-1/4 in.) 310mm (12-3/16 in.) MAX. 610mm (24 in.) DVP12A 914mm 51mm (2 in.) (36 in.) MIN. 1219mm (48 in.) 251mm DVP24 O (9-7/8 in.) 45.0 261mm (10-1/4 in.) DVP45 DVP36 286mm (11-1/4 in.) 185mm (7-1/4 in.) 32mm (1-1/4 in.) TYP DVP48 218mm 18mm (8-9/16 in.) (1/2 in.) TYP 320mm (12-9/16 in.) NOTE: PIPES OVERLAP 32mm (1-1/4”) AT EACH JOINT. Figure 6. DVP-Series Direct Flue Component Specifications (127mm (5”) inner pip
ページ20に含まれる内容の要旨
Identifying Flue Components Step 3. Installing the Flue System The flue systems installed on this gas fireplace may in- A. Flue System Approvals clude one, two, or three 90° elbow assemblies. The rela- These models are approved to use DVP series direct flue tionships of vertical rise to horizontal run in flue configura- pipe components and terminations (see Figures 6 and 7). tions using 90° elbows MUST BE strictly adhered to. The Approved flue system components are labeled for identifi- rise