Compact Tubular Unit Heaters
!
"
%.
%#
/ -
%
#"
"#!
%
"
Installation, Commissioning,
%0
#"
!
",
Operation & Service Manual
Models CTCU 7
CTCU 11
ページ2に含まれる内容の要旨
ページ3に含まれる内容の要旨
TABLE OF CONTENTS SECTION 1: Heater Safety......................................................2 SECTION 13: Conversion Between Gases ..........................21 SECTION 2: Installer Responsibility .....................................2 13.1 General ....................................................................21 2.1 Clearances to Combustibles ........................................2 13.2 Burner Conversion ...................................................21 2.2 Corrosive Chemicals....
ページ4に含まれる内容の要旨
ページ5に含まれる内容の要旨
TABLE OF FIGURES Figure 1: Installation Clearances and Clearances to Combustibles..............................................................4 Figure 2: Suspension Methods .................................................7 Figure 3: Shelf Mounting and Hanging Suspension..................8 Figure 4: Vertical Louvres (Optional) ........................................8 Figure 5: Flue and Roof Detail ..................................................9 Figure 6: Vertical and Horizontal Flue Termi
ページ6に含まれる内容の要旨
ページ7に含まれる内容の要旨
® COMBAT Compact Tubular Unit Heaters are high efficiency heaters and are listed on the Enhanced Capital Allowance Scheme ’Energy Technology Product List’. The ETL symbol is a UK registered certification mark of The Carbon Trust. Product Approval
!
"#
$
%&!'
%
(
#
ページ8に含まれる内容の要旨
® COMBAT CTCU UNIT HEATER INSTALLATION OPERATION AND SERVICE MANUAL SECTION 1: HEATER SAFETY Your Safety is Important to Us! clearances to combustibles. Affix the tag on a wall This symbol is used throughout the near the heater. manual to notify you of possible fire, electrical or burn hazards. Please pay 2.2 Corrosive Chemicals special attention when reading and following the warnings in these sections. #$%& Installation, service and annual inspection of heater '
ページ9に含まれる内容の要旨
SECTION 3: CRITICAL CONSIDERATIONS SECTION 3: CRITICAL CONSIDERATIONS 3.1 Basic Information 3.8 Flue CTCU heaters have automatic ignition burners for Choose heater siting to allow for the proper location ON/OFF operation only. of the flue. Each heater must be fitted with an individual and correctly sized sealed flue system (See Page 9, Section 6). 3.2 Location and Suspension No other appliance may be connected to the flue. All models: For room sealed installation, the air intake must be •
ページ10に含まれる内容の要旨
® COMBAT CTCU UNIT HEATER INSTALLATION OPERATION AND SERVICE MANUAL +,
-
.
!
! !
" Figure 1: Installation Clearances and Clearances to Combustibles
ページ11に含まれる内容の要旨
SECTION 4: SPECIFICATIONS SECTION 4: SPECIFICATIONS 4.1 CTCUA (All Models) 6 ,/ //) 0 /6', %
4 &! 234
5 / /7 .% , 234
5 '% 1
,(, " 6 6 /6', %
4 &! 0,/ //) .% ' ,(, , * + &! - "" '% " 1
"!%
*%# /0 )0 () * 140 for 27 - 32 Dimension Data - CTCUA (All Models) Model CTCU-7 CTCU-11 CTCU-15 CTCU-2
ページ12に含まれる内容の要旨
® COMBAT CTCU UNIT HEATER INSTALLATION OPERATION AND SERVICE MANUAL 4.2 General Technical Data Table (All Models) Model CTCU-7 CTCU-11 CTCU-15 CTCU-22 CTCU-27 / 32 CTCUA, Axial Fans Total Electrical Load W 260 274 336 384 345 Run Current A 1.1 1.2 1.5 1.7 1.5 Start Current A 1.7 1.8 2.5 2.9 2.6 3 Air Flow m /h 1120 1220 2710 2750 4474 [NR] [31] [35] [39] [42] [42] Sound Pressure Level at 3 m dB(A) 37 41 45 48 48 Flue and AIr Intake Flue and Air Intake Size mm Ø 80 80 80 80 100 *Maximum
ページ13に含まれる内容の要旨
SECTION 5: HEATER INSTALLATION SECTION 5: HEATER INSTALLATION 5.1 General 5.3 Wall Mounting Heaters are designed for installation above 1.8 m. For typical suspension, See Page 8, Figure 3. Heaters blowing parallel to the wall can only be These heaters must be installed within the heated installed with the service door away from the wall. space. Duct delivery systems are not permitted with axial fans. When handling or supporting the heater The wall mounting brackets must be attached to a fr
ページ14に含まれる内容の要旨
® COMBAT CTCU UNIT HEATER INSTALLATION OPERATION AND SERVICE MANUAL Figure 3: Shelf Mounting and Hanging Suspension * '% 1 * ',.
'% +"!
2.
8'% +"! 5 8'% +"! $ ')+ 2> 5 8
"!8
')"!% <;% /0$2/ 5 8'% +"! : 8'% +"! ? " Description Part Number Qty. Wall Suspension Mounting Bracket Kit 11111511K 1 Wall Mounting Bracket Arm Left 111WALL1L
ページ15に含まれる内容の要旨
SECTION 6: FLUE INSTALLATION SECTION 6: FLUE INSTALLATION 6.1 Changing Flue and Air Intake Orientation Figure 5: Flue and Roof Detail The heater is sold with horizontal flue and fresh air connections as standard. If vertical flue and fresh air connections are required, follow the instructions on 0 Page 29, Section 15.4.
6.2 Flue Installation
0
+,
-
.
ページ16に含まれる内容の要旨
® COMBAT CTCU UNIT HEATER INSTALLATION OPERATION AND SERVICE MANUAL Figure 6: Vertical and Horizontal Flue Termination - Type B Appliance 22 < $ '
.% 6#" '
.% 12" 8 < $ Figure 7: Vertical and Horizontal Flue Termination - Type C C & C Appliances 12 32 62 < $ 4
"% '
' &! 6#" .% $ & 12" 8 8 '
4 .% &! 8 ' $ &
ページ17に含まれる内容の要旨
SECTION 7: AIR SUPPLY SECTION 7: AIR SUPPLY 7.1 Room Sealed Installation When installed as a room sealed heater, the air for combustion is drawn in from outside the building. It is important to ensure that there is adequate ventilation to provide air for the distribution fan. 7.2 Open Flued Installation It is important to ensure that there is adequate air supply at all times for both combustion and heating requirements in accordance with local and national codes. 7.2.1 Heaters Installed W
ページ18に含まれる内容の要旨
® COMBAT CTCU UNIT HEATER INSTALLATION OPERATION AND SERVICE MANUAL SECTION 8: GAS PIPING 8.1 Connections Connect the heater to the gas supply ensuring that the final connections are as follows: • Gas supply pipe work is run in medium or heavy gauge tubing in compliance with local and national codes. • The gas supply pipe is adequately sized to carry the total volume of gas for the complete installation. 1"2" • An isolating valve and union connection should 7# " %
ページ19に含まれる内容の要旨
SECTION 9: WIRING AND ELECTRICAL INFORMATION SECTION 9: WIRING AND ELECTRICAL INFORMATION 9.1 Electrical Supply 9.2.3 Remote Frost Thermostat All heater models need a constant 230 V 50 Hz 1 Ø When required, connect to L and T parallel to the 1 2 supply connected to terminals L , N & Earth. room thermostat. Locate within the heated space 1 adjacent to the most vulnerable equipment that Polarity "L & N" must be correct. The voltage requires protection. See Page 14, Section 9.3. between neutral
ページ20に含まれる内容の要旨
+A &&<&3 &&<&33<3 +A *-*- , ,, , B ) (/ 0 7 , &&<&33<3 +38 &'&< <1-'3*<< /0 - , 3A39< -*-<8&<1 &:&<3 - &1< +9- * 39:<&'&< +9- ??- <1-'3*<< +38 --D@-38 -: +A +/ *7 < <, , +/ *7 < <, , &- 39: -9< -'3<-.3 <1-'3*<< -'3<-3A39<&:&<&3 -'3<-3A39<-*-< ® COMBAT CTCU UNIT HEATER INSTALLATION OPERATION AND SERVICE MANUAL 9.3 CTCUA Wiring Diagram Models 7 - 32 *&<