ページ1に含まれる内容の要旨
ページ2に含まれる内容の要旨
ページ3に含まれる内容の要旨
ページ4に含まれる内容の要旨
ページ5に含まれる内容の要旨
Installation Instructions R520 CENTRAL THERMOSTAT WITH VOLUME CONTROL Thank you for selecting American-Standard...the benchmark of fine quality for over 100 years. Certified to comply with ANSI A112.18.1M To ensure that your installation proceeds smoothly--please ASSE 1016 read these instructions carefully before you begin. M968255Rev.1.1 ROUGHING-IN DIMENSIONS CONNECTIONS ARE: 1/2" NPT 6-1/4 1/2" NPT SHOWER 3-15/16 7 3-5/8 1/2" NPT INLET 1/2" NPT 1/2" NPT INLET TUB 1-5/8 - 2-1/2 5-7/8 THERMOSTA
ページ6に含まれる内容の要旨
DO NOT SOLDER DIRECTLY TO THE VALVE BODY; THIS WILL DAMAGE WARNING ROUGHING-IN THE VALVE THE TEMPERATURE CONTROL ELEMENT AND CHECK STOP VALVES. 1 MIXED COLD Prepare water supplies per ROUGHING-IN DIMENSIONS. Make sure the finished wall is between the minimum and maximum rough dimension. Install VALVE at indicated height and depth. Make sure the "TOP" marking on the PLASTER GUARD is up. Connect the hot and cold water supplies. Assemble all connecting pipes. Flush lines to HOT remove any dirt. Conn
ページ7に含まれる内容の要旨
CENTRAL THERMOSTAT WITH VOLUME CONTROL MODEL NUMBER R520 953950-0070A CHECK STOP (COLD BLUE) 994053-0070A CARTRIDGE A918572-0070A CARTRIDGE SCREW 923348-0070A HANDLE ADAPTER 953963-0070A 953960-0070A HANDLE EXTENSION THERMOSTAT CARTRIDGE 953951-0070A 912647-0070A CHECK STOP (HOT RED) 953957-0070A O-RING TEMPERATURE CALIBRATION UNIT 963434-YYY0A DEEP ROUGH KIT (SOLD SEPARATELY) HOT LINE FOR HELP For toll-free information and answers to your questions, call: 1-800 442-1902 Weekdays 8:00 a.m. to 8
ページ8に含まれる内容の要旨
DO NOT SOLDER DIRECTLY TO THE VALVE BODY; THIS WILL DAMAGE MIXED WARNING ROUGHING-IN THE VALVE THE TEMPERATURE CONTROL ELEMENT AND CHECK STOP VALVES. Installation 1 Instructions COLD Prepare water supplies per ROUGHING-IN DIMENSIONS. Make sure the finished wall is between the minimum and maximum rough dimension. 3/4" CENTRAL THERMOSTAT R540 Install VALVE at indicated height and depth. Make sure the "TOP" marking on the PLASTER GUARD is up. WITH VOLUME CONTROL Connect the hot and cold water suppli
ページ9に含まれる内容の要旨
DO NOT SOLDER DIRECTLY TO THE VALVE BODY; THIS WILL DAMAGE MIXED WARNING ROUGHING-IN THE VALVE THE TEMPERATURE CONTROL ELEMENT AND CHECK STOP VALVES. Installation 1 Instructions COLD Prepare water supplies per ROUGHING-IN DIMENSIONS. Make sure the finished wall is between the minimum and maximum rough dimension. 3/4" CENTRAL THERMOSTAT R540 Install VALVE at indicated height and depth. Make sure the "TOP" marking on the PLASTER GUARD is up. WITH VOLUME CONTROL Connect the hot and cold water suppli
ページ10に含まれる内容の要旨
DO NOT SOLDER DIRECTLY TO THE VALVE BODY; THIS WILL DAMAGE MIXED WARNING ROUGHING-IN THE VALVE THE TEMPERATURE CONTROL ELEMENT AND CHECK STOP VALVES. Installation 1 Instructions COLD Prepare water supplies per ROUGHING-IN DIMENSIONS. Make sure the finished wall is between the minimum and maximum rough dimension. 3/4" CENTRAL THERMOSTAT R540 Install VALVE at indicated height and depth. Make sure the "TOP" marking on the PLASTER GUARD is up. WITH VOLUME CONTROL Connect the hot and cold water suppli