ページ1に含まれる内容の要旨
QUICK START GUIDE
™
Spectra III Series
™
Spectra III SE Series
Dome Drive
®
C2472M-A (12/05)
ページ2に含まれる内容の要旨
WELCOME ™ ™ Thank you for purchasing Pelco’s Spectra III SE/Spectra III Series dome system. This manual provides the information required to set up and install the dome drive. Please thoroughly familiarize yourself with the information in this manual before attempting installation. NOTE: This manual does not contain instructions for installing a complete Spectra III SE/Spectra III Series system. For complete instructions refer to the installation packet shipped with the back box. SETUP FOR COAX
ページ3に含まれる内容の要旨
SW2–Termination Setting When connecting more than one Spectra dome to a single controller, terminate the unit farthest from the controller. Termination is only required for the last dome in the series. The dome drive is shipped from the factory in the unterminated (OFF) position. To terminate the dome drive, set the SW2 switch to the ON position. NOTE: Coaxitron Control - Dome termination is not required. SW3–Baud Settings Pelco’s D-Type controllers are set for 2400 baud. The default setting fo
ページ4に含まれる内容の要旨
DOME DRIVE INSTALLATION Install the dome drive. Line up the blue (A) and red (B) tabs with the blue (A) and red (B) labels. Push the tabs in. Insert one side and then the other side. Continue push- ing on the ends of the tabs until both sides click into place. Refer to Figure 2. To use your dome system, refer to the Operation and Programming Manual supplied with the dome drive. Figure 2. Dome Drive Installation Table A. P Protocol Receiver Address SPECTRA SWITCH SETTING SPECTRA SWITCH SETTING
ページ5に含まれる内容の要旨
Table B. D Protocol Receiver Address SPECTRA SWITCH SETTING SPECTRA SWITCH SETTING ADDRESS SW1-1 SW1-2 SW1-3 SW1-4 SW1-5 SW1-6 SW1-7 SW1-8 ADDRESS SW1-1 SW1-2 SW1-3 SW1-4 SW1-5 SW1-6 SW1-7 SW1-8 1ON OFF OFF OFF OFF OFF OFF OFF 50 OFF ON OFF OFF ON ON OFF OFF 2 OFF ON OFF OFF OFF OFF OFF OFF 51ON ON OFF OFF ON ON OFF OFF 3ON ON OFF OFF OFF OFF OFF OFF 52 OFF OFF ON OFF ON ON OFF OFF 4 OFF OFF ON OFF OFF OFF OFF OFF 53ON OFF ON OFF ON ON OFF OFF 5ON OFF ON OFF OFF OFF OFF OFF 54 OFF ON ON OFF ON
ページ6に含まれる内容の要旨
Table B. D Protocol Receiver Address (Continued) SPECTRA SWITCH SETTING SPECTRA SWITCH SETTING ADDRESS SW1-1 SW1-2 SW1-3 SW1-4 SW1-5 SW1-6 SW1-7 SW1-8 ADDRESS SW1-1 SW1-2 SW1-3 SW1-4 SW1-5 SW1-6 SW1-7 SW1-8 99ON ON OFF OFF OFF ON ON OFF 148 OFF OFF ON OFF ON OFF OFF ON 100 OFF OFF ON OFF OFF ON ON OFF 149 ON OFF ON OFF ON OFF OFF ON 101 ON OFF ON OFF OFF ON ON OFF 150 OFF ON ON OFF ON OFF OFF ON 102 OFF ON ON OFF OFF ON ON OFF 151 ON ON ON OFF ON OFF OFF ON 152 OFF OFF OFF ON ON OFF OFF ON 103
ページ7に含まれる内容の要旨
Table B. D Protocol Receiver Address (Continued) SPECTRA SWITCH SETTING SPECTRA SWITCH SETTING ADDRESS SW1-1 SW1-2 SW1-3 SW1-4 SW1-5 SW1-6 SW1-7 SW1-8 ADDRESS SW1-1 SW1-2 SW1-3 SW1-4 SW1-5 SW1-6 SW1-7 SW1-8 197 ON OFF ON OFF OFF OFF ON ON 226 OFF ON OFF OFF OFF ON ON ON 198 OFF ON ON OFF OFF OFF ON ON 227 ON ON OFF OFF OFF ON ON ON 199 ON ON ON OFF OFF OFF ON ON 228 OFF OFF ON OFF OFF ON ON ON 200 OFF OFF OFF ON OFF OFF ON ON 229 ON OFF ON OFF OFF ON ON ON 201 ON OFF OFF ON OFF OFF ON ON 230 OF
ページ8に含まれる内容の要旨
Worldwide Headquarters 3500 Pelco Way Clovis, California 93612 USA USA & Canada Tel: 800/289-9100 Fax: 800/289-9150 International Tel: 1-559/292-1981 Fax: 1-559/348-1120 www.pelco.com ISO9001 United States Canada United Kingdom The Netherlands Singapore Spain Scandinavia France Middle East | | | | | | | |