ページ1に含まれる内容の要旨
Cisco ASR 9001 and Cisco ASR 9001-S
Routers Hardware Installation Guide
May 2013
Americas Headquarters
Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA
http://www.cisco.com
Tel: 408 526-4000
800 553-NETS (6387)
Fax: 408 527-0883
Text Part Number: OL-26701-02
ページ2に含まれる内容の要旨
THE SPECIFICATIONS AND INFORMATION REGARDING THE PRODUCTS IN THIS MANUAL ARE SUBJECT TO CHANGE WITHOUT NOTICE. ALL STATEMENTS, INFORMATION, AND RECOMMENDATIONS IN THIS MANUAL ARE BELIEVED TO BE ACCURATE BUT ARE PRESENTED WITHOUT WARRANTY OF ANY KIND, EXPRESS OR IMPLIED. USERS MUST TAKE FULL RESPONSIBILITY FOR THEIR APPLICATION OF ANY PRODUCTS. THE SOFTWARE LICENSE AND LIMITED WARRANTY FOR THE ACCOMPANYING PRODUCT ARE SET FORTH IN THE INFORMATION PACKET THAT SHIPPED WITH THE PRODUCT AND ARE IN
ページ3に含まれる内容の要旨
CONTENTS Preface vii CHAPTER 1 Preparing for Installation 1-1 Cisco ASR 9001 Router 1 Cisco ASR 9001-S Router 1 Safety Guidelines 1-2 General Safety Guidelines 1-2 Compliance and Safety Information 1-3 Laser Safety 1-3 Energy Hazard 1-3 Preventing Electrostatic Discharge Damage 1-4 Lifting Guidelines 1-4 Site Requirement Guidelines 1-5 Site Layout and Equipment Dimensions 1-5 Site Wiring Guidelines 1-7 Chassis Air Flow Guidelines 1-7 Rack-Mounting and Air Flow Clearance Guidelines 1-8 Telco 2-
ページ4に含まれる内容の要旨
Contents SYNC Port LED Indicators 1-26 RP External USB Port 1-27 CHAPTER 2 Unpacking and Installing the Chassis 2-1 Pre-Installation Considerations and Requirements 2-1 Installation Overview 2-1 Required Tools and Equipment 2-2 Unpacking the Cisco ASR 9001 Router 2-2 Positioning the Router 2-3 Rack-Mounting the Router Chassis 2-4 Verifying Rack Dimensions 2-4 Installing the Chassis in a 2-Post Rack 2-4 Installing the Chassis in a 4-post Rack 2-7 Supplemental Bonding and Grounding Connections 2
ページ5に含まれる内容の要旨
Contents Cable Management Bracket 3-14 Installing a Cable Management Bracket 3-14 Removing a Cable-Management Bracket 3-15 Connecting Route Processor Cables 3-16 Connecting to the RP Console Port 3-17 Connecting to the RP Auxiliary Port 3-17 Connecting to the RP Ethernet Management Ports 3-17 Connecting Power to the Router 3-18 Connecting Power to an AC-Powered Router 3-18 Connecting Power to a DC-Powered Router 3-20 Powering on the Router 3-21 CHAPTER 4 Troubleshooting the Installation 4-1 Tr
ページ6に含まれる内容の要旨
Contents Verifying the Transceiver Modules 4-15 Advanced Line Card Troubleshooting 4-17 Troubleshooting the Cooling Subsystem 4-18 Fan Tray Operation 4-18 Power Module Fans 4-18 Over-temperature Conditions 4-19 Isolating Cooling Subsystem Problems 4-19 CHAPTER 5 Replacing Cisco ASR 9001 Router Components 5-1 Prerequisites and Preparation 5-1 Field Replaceable Units 5-1 Online Insertion and Removal 5-2 Powering Off the Router 5-2 Removing and Replacing the Fan Tray 5-2 Removing and Replacing AC
ページ7に含まれる内容の要旨
Preface This Cisco ASR 9001 and Cisco ASR 9001-S Routers Hardware Installation Guide preface contains these sections: • Changes to This Document, page vii � Audience, page vii � Purpose, page vii � Document Organization, page viii � Document Conventions, page viii � Obtaining Documentation and Submitting a Service Request, page ix Changes to This Document Table 1 lists the technical changes made to this document since it was first developed. Table 1 Changes to This Document Revision Date Chan
ページ8に含まれる内容の要旨
Preface Document Organization This installation guide is organized into these chapters and appendixes: � Chapter 1, “Preparing for Installation,” describes safety considerations, required tools and equipment, an overview of the installation, and procedures to perform before installation. � Chapter 2, “Unpacking and Installing the Chassis,” provides instructions for installing the chassis into a rack. � Chapter 3, “Installing Modules and Cables in the Chassis,” provides instructions for install
ページ9に含まれる内容の要旨
Preface Timesaver Means the described action saves time. You can save time by performing the action described in the paragraph. Warning This warning symbol means danger. You are in a situation that could cause bodily injury. Before you work on any equipment, be aware of the hazards involved with electrical circuitry and be familiar with standard practices for preventing accidents. To see translations of the warnings that appear in this publication, see the Regulatory Compliance and Safety In
ページ10に含まれる内容の要旨
Preface Cisco ASR 9001 and Cisco ASR 9001-S Routers Hardware Installation Guide x OL-26701-02
ページ11に含まれる内容の要旨
CH A P T E R 1 Preparing for Installation Cisco ASR 9001 Router The Cisco ASR 9001 Router is a compact high-capacity provider edge (PE) router that delivers 120 Gbps of non-blocking, full-duplex fabric capacity in a two-rack-unit (2RU) form factor. Similar to other routers in the Cisco ASR 9000 Series, running Cisco IOS XR software images, the Cisco ASR 9001 Router delivers the features and services found on the ASR 9000 Series platforms, allowing customers to standardize on the same Cisco
ページ12に含まれる内容の要旨
Chapter 1 Preparing for Installation Safety Guidelines Figure 1-2 Front Panel of the Cisco ASR 9001-S Router In order to achieve the full bandwidth of 120 Gbps and to enable the disabled ports, a Cisco license can be obtained. Once the license is obtained and installed, the Cisco ASR 9001-S Router must be reloaded to bring up the full 120 Gbps capacity. For information on configuring the Cisco license for Cisco ASR 9001-S Router, refer to the Cisco ASR 9001-S 120G Upgrade License Configu
ページ13に含まれる内容の要旨
Chapter 1 Preparing for Installation Safety Guidelines � Always disconnect the power source and unplug all power cables before lifting, moving, or working on the router. � Keep the work area clear and dust free during and after installation. � Keep tools and router components away from walkways and equipment rack aisles. � Do not wear loose clothing, jewelry (including rings and chains), or other items that could get caught in the router. � Fasten your tie or scarf and sleeves. � Operate
ページ14に含まれる内容の要旨
Chapter 1 Preparing for Installation Safety Guidelines Preventing Electrostatic Discharge Damage Many router components can be damaged by static electricity. Not exercising the proper electrostatic discharge (ESD) precautions can result in intermittent or complete component failures. To minimize the potential for ESD damage, always use an ESD-preventive antistatic wrist strap (or ankle strap) and ensure that it makes good skin contact. Note Check the resistance value of the ESD-preventiv
ページ15に含まれる内容の要旨
Chapter 1 Preparing for Installation Site Requirement Guidelines � Do not lift equipment alone; have another person help you to lift the equipment. � Ensure that your footing is solid; balance the weight of the object between your feet. � Lift the equipment slowly; never move suddenly or twist your body as you lift. � Keep your back straight and lift with your legs, not your back. When bending down to lift equipment, bend at the knees (not at the waist), to reduce the strain on your lower
ページ16に含まれる内容の要旨
Chapter 1 Preparing for Installation Site Requirement Guidelines – Frame is bolted to the floor and is secured to the building structure using either wall brackets or overhead brackets. � When mounting the router in a telco-style rack or 4-post rack, be sure to use all the screws provided to secure the chassis to the rack posts. � Install the cable-management brackets included with the router to keep cables organized. Be sure to use appropriate strain-relief methods to protect cables and
ページ17に含まれる内容の要旨
Chapter 1 Preparing for Installation Site Requirement Guidelines Site Wiring Guidelines When planning the location of the router, consider distance limitations for signaling, electromagnetic interference (EMI), and connector compatibility. If the wiring is run for any significant distance in an electromagnetic field, interference can occur between the field and the signals on the wires. Poor wiring can cause: � Radio interference emanating from the wires. � Strong EMI, especially when ca
ページ18に含まれる内容の要旨
Chapter 1 Preparing for Installation Site Requirement Guidelines Figure 1-5 Air Flow Path through the Cisco ASR 9001 Router Air exhaust Room air When selecting a site to install the router, observe these guidelines: � Dust free area—Site should be as dust free as possible. Dusty environments can clog the power supply intake vents, reducing the cooling air flow through the router. Clogged filters and vents can cause an over-temperature condition in the router. � Unrestricted air flow—Allow
ページ19に含まれる内容の要旨
Chapter 1 Preparing for Installation Site Requirement Guidelines Figure 1-6 Equipment Rack Types a b c a Telco-style rack b Free-standing, 4-post open c Free-standing enclosed rack rack with two mounting with perforated sides and posts in the front, two two mounting posts in the mounting posts in the back front or along each side Telco 2-Post Rack Item a in Figure 1-6 shows a telco-style rack. The telco-style rack is an open frame consisting of two posts tied together by a cross-bar at
ページ20に含まれる内容の要旨
Chapter 1 Preparing for Installation Site Requirement Guidelines Figure 1-7 Cisco ASR 9001 Router Mounted in a 2-Post Rack Open 4-Post Rack Item b in Figure 1-6 shows a free-standing, 4-post open rack with two mounting posts in the front and two mounting posts in the back or along the side. The mounting posts in this type of rack are often adjustable so that you can position the rack-mounted unit within the depth of the rack rather than flush-mount it with the front of the rack. Two rear