ページ1に含まれる内容の要旨
Self Cleaning Free-Standing
Installation
Electric Range
EER2000, EER3000 JBP24, JBP26, JBP30, JBP35, JBP48, JBP64, JBP65,
Instructions
JBP66, JBP67, JBP70, JBP78, JBP79, JBP85, JB940, JB960, JB965
"If you have questions, Call 800-GE-CARES orvisit our website at:
www.G EAppliances.com"
Skill Level: High ! _ Low
Completion Time: 1 to 3 Hours
Proper installation is the responsibility of the installer. Product failure due to improper installation
is not covered under the GE Appliance Warranty. See t
ページ2に含まれる内容の要旨
Installation Instructions IMPORTANT SAFETY INSTRUCTIONS For Your Safety WARNING: To reduce the risk of tipping, the appliance must be secured by properly installed anti-tip _ remove ARNING: house Forfuse personal or open safety circuit bracket packed with the appliance. breaker before beginning installation. Failure to do so could result in serious injury or even death. All rough-in and spacing dimensions must be met All ranges can tip for safe use of your range. Electricity to the range Injury
ページ3に含まれる内容の要旨
Installation Instructions Pre-Installation Checklist I_ Close the oven door to _' Preparing the Range the broil stop position. Remove packaging materials. Any packaging materials must be removed during installation. This will include adhesive tape, wire ties, cardboard and protective plastic. Failure to remove Place hands on both these materials could result in damage to sides of the door. As you the appliance once the appliance has close the door, lift up and been turned on and surfaces have aw
ページ4に含まれる内容の要旨
Installation Instructions Installation Required Clearances See Ilustrations below for all rough-in and spacing J dimensions. The range may be placed with 0" clearance (flush) at the back wall and side walls of the cabinet. 1 t J .................................................................................... MINIMUM DIMENSIONS BETWEEN *'15" MIN COOKTOP, WALLS, AND ABOVE THE COOKTOP. Make sure the wall covering, countertop and cabinets around the range can with- *0'_ stand the heat (up to 200
ページ5に含まれる内容の要旨
Installation Instructions Electrical Connections I-_ Making the Electrical Connection Electrical Requirements Remove the wire cover (on the back of the This appliance must be supplied with the proper range) by removing 5 screws using a 1/4" nut voltage and frequency, and connected to an driver. Do not discard these screws. individual properly grounded branch circuit; protected by a circuit breaker or fuse having amperage as specified on the rating plate. The 5 Screws to remove rating plate is lo
ページ6に含まれる内容の要旨
Installation Instructions Electrical Connections cont. Attach the green lead NEW CONSTRUCTION AND FOUR _-_ _r Ground below the junction WIRE CORD CONNECTION KIT block with the ground screw that was Complete 4 wire removed earlier. ew cord kit. Below are 3Screws| Gound step by step _ Screw and instructions on Connect the red Location how to install the and black leads to kit. the outside Relief Connection Clamp terminals and the Plate white lead to the Black White center terminal. (Green) Remove
ページ7に含まれる内容の要旨
Installation Instructions Electrical Connections oo°t. Connect the outer wires to the outside THREE-WIRE CORD CONNECTION KIT terminals and the center wire to the center terminal. Do not remove the Grounded ground strap 3 _>_._ _ Neutral Complete 3 Screws _]_ Terminal Grounded Neutral wire cord kit. l /_White) (White) by step sSt rraPw instructions on how to install Outer Wire the kit. Connection Relief ,..... Plate Clamp Wire Outer Wi re I-_ Remove the screws on the terminal block with a 1/4" nu
ページ8に含まれる内容の要旨
Installation Instructions Installing the Anti-Tip Bracket El Locating The Bracket [_ nstalling The Bracket in Wood or Concrete The anti-tip bracket, provided with your literature INSTALLATION-WOOD CONSTRUCTION and broiler pan, must be properly installed to prevent the range from tipping. Please refer to a. Locate the centers of the four holes identified the instructions provided with your anti-tip in Fig. 1 as Floor-Wood and Wall. bracket. b. Drill a 1/8" pilot hole through the pre-marked areas.
ページ9に含まれる内容の要旨
Installation Instructions Installing the Range Storage Drawer Removal CAUTION: The oven door is heavy. You may need help lifting the door I-_ Pull the drawer high enough to slide it into the out until it stops hinges slots. Do not lift the door by the handle. r-_ Lift the front of the drawer until Replacing the Oven Door the stops clear the guide. r-_ Pick the Oven Door up \ :ii_ by placing both hands on Stop _ Remove the each side. The door is : drawer. heavy so you may need help. Do not lift t
ページ10に含まれる内容の要旨
Installation Instructions Installing the Range cont. Replacing the Storage Drawer rail on the guides. Push the drawer in until it stops. Place the drawer __. Lift the front of the drawer and push in until the stops clear the guides. Lower the front of the drawer and push in until it closes. SPECIAL INSTRUCTIONS IF YOU HAVE PROBLEMS WHILE REPLACING THE STORAGE DRAWER IF DRAWER WON'T CLOSE Drawer Does Not CIose Drawer Front Panel Tipped Away From Completely Body Side I l _ Power Cord May Be Rear D
ページ11に含まれる内容の要旨
Installation Instructions Final Check List [] Check to make sure the circuit breaker is closed (Reset) or the circuit fuses are replaced. [] Be sure power is in service to the building. [] Check to be sure that all packing materials and tape on metal panel (if applicable) under control knobs have been removed. Operation Check List [] Check to make sure the Clock display is energized. If a series of horizontal red lines appear in the display, disconnect power immediately. Recheck the range wiring
ページ12に含まれる内容の要旨
NOTES Pub. No. 31-10463 12 229c4053P447-3