ページ1に含まれる内容の要旨
APC Symmetra RM
Installation Manual
English
990-1031, Revision 1 8/00
ページ2に含まれる内容の要旨
Limited Warranty American Power Conversion (APC) warrants its products to be free from defects in materials and workmanship for a period of two years from the date of purchase, except in India where the period is one year for battery module(s). Its obligation under this warranty is limited to repairing or replacing, at its own sole option, any such defective products. To obtain service under warranty you must obtain a Returned Material Authorization (RMA) number from customer support (see Serv
ページ3に含まれる内容の要旨
Table of Contents Chapter 1: Safety Information ............................................................. 1 Conventions Used in this Manual ......................................................... 1 Handling Safety..................................................................................... 1 Electrical Safety .................................................................................... 1 Deenergizing Safety....................................................................
ページ4に含まれる内容の要旨
List of Figures Figure 1: Symmetra RM..................................................................................................................................... 5 Figure 2: Front View of the Symmetra RM ....................................................................................................... 7 Figure 3: Rear View of the Symmetra RM (200/208 Vac / L1-L2-G version shown)....................................... 8 Figure 4: System Block Diagram ............................
ページ5に含まれる内容の要旨
CHAPTER 1: SAFETY INFORMATION This Safety section contains important instructions that should be followed during installation and maintenance of the APC equipment and batteries. It is intended for APC customers who setup, install, relocate, or maintain APC equipment. Connection to the branch circuit (mains) must be performed by a Licensed Electrician. Installation and removal of the Power, Battery, and Intelligence modules must be performed by service personnel. Installation and removal of in
ページ6に含まれる内容の要旨
• Use one hand, whenever possible, to connect or disconnect signal cables to avoid a possible shock from touching two surfaces with different electrical grounds. • Connect the equipment to a three wire AC outlet (two poles plus ground). The receptacle must be connected to appropriate branch circuit/mains protection (fuse or circuit breaker). Connection to any other type of receptacle may result in a shock hazard. • The protective earth conductor for the Symmetra RM carries the leakage current
ページ7に含まれる内容の要旨
Recycling of Batteries See your dealer or Replacing Modules in the SYMMETRA RM OPERATION MANUAL, for information on replacement battery kits and battery recycling. • Do not install the battery module(s) in the frame until you are ready to power up the Symmetra RM. Failure to so can result in a deep discharge of the batteries, which may cause permanent damage. • Store the battery module(s) in a cool ambient temperature of < 25 ° ° ° °C. Radio Frequency Interference This equipment has been tested
ページ8に含まれる内容の要旨
4
ページ9に含まれる内容の要旨
CHAPTER 2: BASICS About Your UPS The Symmetra RM is a high-performance, uninterruptible power system in a “power array” configuration, designed to power high availability servers and other sensitive electronic equipment. It provides conditioned, reliable AC power to connected equipment, and provides protection from power blackouts, brownouts, swells, sags, surges, and interference. The Symmetra RM is comprised of a frame and a variable set of modules. A system can be configured to deliver a max
ページ10に含まれる内容の要旨
How To Contact APC Internet http://www.apc.com/support North America Phone 1.800.800.4272 Fax 1.401.788.2743 Email apctech@apcc.com Latin America, South America Argentina.....0800.9.APCC (0800.9.2722) Mexico....................... 95.800.804.4283 Brazil ...........0800.12.72.21 Uruguay..................... 000.413.598.2139 Colombia .....980.15.39.47 Venezuela.................. 8001.2544 Europe, Middle East, and Africa Phone................+353 91 702020 Email...............apceurtech @ apcc.com
ページ11に含まれる内容の要旨
Product Overview Front View Component Identification Figure 2: Front View of the Symmetra RM Power Module(s) : The Symmetra RM can support between one and four power modules. Each module provides 2 kVA/1.4 KW power. Redundant Intelligence Module : The redundant intelligence module (RIM) is a backup version of the main intelligence module(MIM). It provides redundancy in the event of a MIM failure or while a MIM is being replaced. Main Intelligence Module : The ma
ページ12に含まれる内容の要旨
Rear View Component Identification Figure 3: Rear View of the Symmetra RM (200/208 Vac / L1-L2-G version shown) System Fan : The system fan can be replaced in the field. Refer to Replacing the System Fan, in the SYMMETRA RM OPERATION MANUAL, for instructions. Accessory Ports : APC manufactures a set of auxiliary user interface accessories. The Symmetra RM contains a total of three accessory ports. The top slot is preloaded with the SYCC card that provides computer and
ページ13に含まれる内容の要旨
Input Voltage Selection Switch : Set this switch to the appropriate setting, either 200/208 (L1-L2-G) or 220/230/240 (L1-N-G) before powering up the Symmetra RM. Products rated 200/208 are typically installed in North America (208 V, phase to phase, grounding conductor) and Japan (200V, phase to phase, grounding conductor). Products rated 2020/230/240 are typically installed in the rest of the world (220 V, 230 V, or 240 V, phase to neutral, protective earth). These products must be hard wire
ページ14に含まれる内容の要旨
System Block Diagram Accessory ACCESSORY PASS THROUGH BUS Cards DB9 COM Port PowerView Display External Battery Battery MIM RIM COM Card Frame Monitor COM Bus Power Module Battery Power or Module Battery 120 VDC Module Power or Battery Battery Module Module 120 VDC Power or Battery Battery Module Module 120 VDC Automatic External Battery Bypass Power AC in 155 to 276 VAC Backfeed Relay Input Circuit Breaker Manual Bypass Figure 4: System Block Diagram 10
ページ15に含まれる内容の要旨
CHAPTER 3: INSTALLATION Unpacking APC has taken care to design robust packaging for your product. However, accidents and damage may occur during shipment. Inspection Inspect the UPS upon receipt. Notify the carrier and dealer if there is damage. The packaging is recyclable; save it for reuse or dispose of it properly. Contents The shipping package contains the UPS, one PowerView display bezel, three blank bezels, the mounting rail kit (containing the mounting rails, and hardware), one blank
ページ16に含まれる内容の要旨
Determine the Location of the Symmetra RM in the Rack 1. Select a location for the Symmetra RM in your NetShelter enclosure or other 19-inch (46.5 cm) rack. Select a location with adequate air flow that is free from excessive dust. Ensure that the air vents on the sides of the Symmetra are not blocked. • The Symmetra RM is heavy. Select a rack location sturdy enough to handle the weight. Mount the unit at or near the bottom of the rack. • Do not operate the unit where temperature or humidity
ページ17に含まれる内容の要旨
Install the UPS into the Rack 1. With two people supporting the Symmetra RM, one on each side, carefully align the cleats on the sides of the unit with the grooves on the mounting rails. Slide the unit into the rack completely. 2. Use the six (6) ornamental screws, supplied with the unit, to attach the mounting brackets to the rack post. Connect the Symmetra RM to its Power Source 200/208/240 Vac (L1-L2-G) Symmetra RM: The input power can be supplied in two ways: the attached line cord can be
ページ18に含まれる内容の要旨
1. Make sure the main circuit breaker , located on the rear panel, is in the OFF position. 2. Select the appropriate wire size and connectors, according to local codes. For most applications, #10 AWG (5 sq. mm) wire should be sufficient. 3. Remove the input wiring access door by unscrewing the single screw that holds the access panels in place. The input wiring terminal is located on the rear panel of the Symmetra RM. 4. Use a screwdriver or any hard object to detach the circular knock
ページ19に含まれる内容の要旨
Use one of the following cable types to connect the Symmetra RM to the EPO switch: CL2 Class 2 cable for general use. CL2P Plenum cable for use in ducts, plenums, and other spaces used for environmental air. CL2R Riser cable for use in a vertical run in a shaft of from floor to floor. CL2X Limited use cable for use in dwellings and for use in raceway. For installation in Canada: Use only CSA Certified, type ELC (extra-low voltage control cable). Connection Option 1 An electrician must connect 1
ページ20に含まれる内容の要旨
Install battery modules just prior to running the Symmetra RM. The battery modules discharge slowly when loaded prematurely and can be damaged permanently. Each battery module weighs 21.8 kg (48 lbs). Two people are required to install or remove battery modules. Battery Module: With one person on either side of the battery module, lift the module, and slide it completely into the frame to engage the internal electrical connector. The top of each battery module has a tab to align the module c