About This Manual Audience This manual is intended for end-users of an 80kW InfraStruXure PDU. It covers the operation, customization, and quick configuration of the InfraStruXure PDU. It also includes basic InfraStruXure system operation. Companion manuals For additional information about the InfraStruXure system, see the following manuals that were included with the PDU: InfraStruXure 80kW Installation and Start-Up (990-1467B) covers the installation and start-up of InfraStruXure UPS po
ページ4に含まれる内容の要旨
ページ5に含まれる内容の要旨
Contents Safety ......................................................................1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Save these instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Safety symbols used in this manual . . . . . . . . . . . . . . . . . . . 1 Cross-reference symbols used in this manual . . . . . . . . . . . . . 1 Warnings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
ページ6に含まれる内容の要旨
Contacts Screen. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Breakers Screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 Alarms Screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 View Active Alarms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 Alarm/Event Log . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 Alarm Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . .
ページ7に含まれる内容の要旨
Configuring the Network Management Interface . . . . . . . . . . . 45 Connect the InfraStruXure PDU to your network . . . . . . . . . 45 Configuration Overview . . . . . . . . . . . . . . . . . . . . . . . . . . 45 TCP/IP configuration methods . . . . . . . . . . . . . . . . . . . . . . 46 Device IP Configuration Wizard . . . . . . . . . . . . . . . . . . . . . . 46 BOOTP & DHCP configuration . . . . . . . . . . . . . . . . . . . . . . 47 Local access to the control console . . . . . . . . . .
ページ8に含まれる内容の要旨
Product Information .............................................. 71 InfraStruXure Standard Warranty. . . . . . . . . . . . . . . . . . . . . . . 71 Life-Support Policy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73 How to Obtain Service. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74 Appendix .............................................................. 75 Changes in This Manual. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75 vi 80kW Infra
ページ9に含まれる内容の要旨
Safety Overview Save these instructions This manual contains important instructions that must be followed during installation, operation, and maintenance of the PDU. Safety symbols used in this manual Indicates an electrical hazard, which, if not avoided, could result in injury or death. Electrical Hazard Indicates a hazard, which, if not avoided, could result in personal injury or damage to product or other property. Warning Indicates a potential hazard which could result in damage to produc
ページ10に含まれる内容の要旨
Warnings Installation/Maintenance Only a certified electrician can perform these tasks: Connect the InfraStruXure PDU to utility power Connect the cross tie output breaker to another InfraStruXure PDU Connect a switch to the EPO interface on the InfraStruXure PDU Only a certified electrician or an APC Field Service Engineer can perform these tasks: Connect the PDU to the Symmetra PX UPS Perform maintenance of the PDU When you connect the PDU to utility power, you must install a circui
ページ11に含まれる内容の要旨
Safety Total Power Off 1. Set the Symmetra PX UPS System Enable switch to Off. 2. Set the DC Disconnect breaker of each Battery Enclosure to Off. 3. Set the PDU Main Input (A) switch to Off. 4. If applicable, set the PDU Bypass Input (B) switch to Off 5. If applicable, set the PDU Cross Tie Output (X) breaker to Off. 6. Set the upstream utility power circuit breaker(s) to Off. 7. Disconnect the batteries in the Battery Enclosure by pulling them out to the red disconnect line. DANGER—Risk of El
ページ12に含まれる内容の要旨
Safety EMI This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with this user manual, may cause harmful interference to radio communications. Operat
ページ13に含まれる内容の要旨
Overview InfraStruXure PDU Components The APC 80kW InfraStruXure PDU provides distribution and management of electrical power. The InfraStruXure PDU has the capacity of 80kW, accepts 208, 480, or 600V, 3-phase input, and distributes 208V, 3-phase power to equipment racks and Rack Distribution Panels (RDPs). The RDPs sit in the top 10U of specially-designed NetShelter VX enclosures and distribute power to equipment racks. The InfraStruXure PDU is housed in a specially-designed 23-inch NetShel
ページ14に含まれる内容の要旨
Overview PDU front view (exterior) PDU wide shielding troughsThe PDU shielding troughs accommodate the power cables exiting the roof of the PDU. Power CablesThese power cables feed equipment racks; they are fed through knockout panels on the top (or bottom) of the PDU. The power cables consist of five wires: three phases, one neutral, and one ground. The number of power cables installed in the PDU depends on your system configuration. Each power cable has a NEMA L
ページ15に含まれる内容の要旨
Overview Front view (interior) Ground lugsGround lugs are provided for the Main Input switch, Bypass Input switch, and Cross Tie Output breaker. The main input lug has two holes: one for a main ground and one for the GEC. See the instruction sheet, Certified Electricians Instructions for more information. Main Input switch (A) The main power source connects to your system at the Main Input switch. See the instruction sheet, Certified Electricians Instruction
ページ16に含まれる内容の要旨
Overview Front view (door open) Wraparound maintenance bypass panelThe maintenance bypass panel has three circuit breakers that allow the UPS to be electrically isolated from the main power source, while maintaining the power panels. The input circuit breaker is labeled Q1, the output circuit breaker is labeled Q2, and the maintenance bypass circuit breaker is labeled Q3. The label on the maintenance bypass panel of the PDU illustrates the power flow, and the H2
ページ17に含まれる内容の要旨
Overview Rear view (interior) 42-position circuit breaker panelEach PDU has a circuit breaker panel with 42 pole positions. Each pole provides power at 120 volts L-N or 208 volts L-L. The amperage each position provides depends on the size of the circuit breaker used. Panel current sensors Wires that feed the distribution panel pass through these current sensors, providing data to the PDU monitoring unit. PDU monitoring unitThe PDU monitoring unit receives signals f
ページ18に含まれる内容の要旨
Overview PDU monitoring unit This connection provides the input power for the PDU monitoring unit. The power is supplied by the monitoring unit circuit breaker on the front of the PDU. If the panel is on, and the monitoring unit circuit breaker is closed, the monitoring unit is powered. Connects to sensors monitoring values such as voltage, current, and power. Digital input sensing for monitoring such as circuit breaker status, 885-2288 transformer temperature, fans, etc. The Dis
ページ19に含まれる内容の要旨
Overview User connection plate For a description and location of the user connection plate, see ( ) on page 8. For clarity, the user connection plate is shown in the following illustration in greater detail. \ ! USER INTERFACE © 2001 APC MADE IN USA ! + 1 23 4 EPO 24V EPO Contact Inputs Contact Outputs AC/DC Contact ! Connect the InfraStruXure PDU to the network of the InfraStruXure Manager through the ethernet port. The user connection plate has four input contact con