ページ1に含まれる内容の要旨
Expansion Kit Installation Guide
ページ2に含まれる内容の要旨
Yamaha LC3 Expansion Kit Installation Guide Contents Page Chapter 1 Introducing the LC3 Expansion Kit . . . . . . . . . . . 1 Chapter 2 Installing the LC3 Expansion Kit . . . . . . . . . . . . . 2 Step 1 thru Step 3 . . . . . . . . . . . . . . . . . . . . . . . . . 2 Step 4 thru Step 5 . . . . . . . . . . . . . . . . . . . . . . . . . 3 Step 6 thru Step 9 . . . . . . . . . . . . . . . . . . . . . . . . . 4 Step 10 thru Step 11 . . . . . . . . . . . . . . . . . . . . . . . 5
ページ3に含まれる内容の要旨
Chapter 1 Introducing the LC3 Expansion Kit The LC3 Expansion Kit allows you to add ports to your Music Teaching Lab System, enabling you to accommodate more students. Each Expansion Kit adds eight ports, which gives you room for an additional eight students in stereo mode or 16 students in split mode. What’s Included The Expansion Kit includes • (1) 8-port channel card • (8) Instrument Boxes (SB-2) • (8) Headsets with microphones • (8) RJ45 lab connector cables • (8) 1/4" stereo cables • (5) Al
ページ4に含まれる内容の要旨
Chapter 2 Installing the LC3 Expansion Kit(s) Installing the Kit is straightforward and can be done by anyone with basic technical knowledge and a screwdriver. Step 1 If the LC3 is installed, turn it off and remove all cables connected to the Expansion Kit. If the RJ45 cables plugged into the Instrument Boxes are not labeled, it is recommended that you label them before removing them from the system in order to make the process of reconnecting them later much easier. Step 2 Remove the seven blac
ページ5に含まれる内容の要旨
Step 4 Install the Channel Circuit Board from the Expansion Kit into the Lab Hub by inserting the pin end into the connector on the back panel. Make sure that the holes for the spacers on the Channel Circuit Board line up correctly with the silver spacers. Step 5 Install the five spacers into the holes in the new Channel Circuit Board to secure it to the Channel Board below it. Add any additional Channel Circuit Boards. 3
ページ6に含まれる内容の要旨
Step 6 Remove the blank plates covering the newly populated connectors. Remove these screws as needed Controller Step 7 Replace the cover and all the screws. Step 8 Replace all the cables that were unplugged at the beginning of this installation. Make sure that the power is still switched off. Step 9 Place the new Instrument Boxes with the desired instruments. Plug one end of the instrument cable into the headphone output on the piano and the other end into the Instrument Box INSTRUMENT IN conne
ページ7に含まれる内容の要旨
Step 10 Connect the new Instrument Box to the newly added Channel Circuit Board connectors using the provided RJ45 cables. Controller IBX3INSTRUMENTBOX Step 11 You’re done. Power up the system. You can select the new students by pressing the BANK button on the Controller. For more information about using the system, refer to the LC3 Operation Guide. 5
ページ8に含まれる内容の要旨
©2009 Yamaha Corporation of America. All rights reserved. www.yamaha.com/LC3