ページ1に含まれる内容の要旨
H10X/H5X
H5E/DV PC
H5 ELEMENT
With Digital Control Board
SERVICE MANUAL
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
To ensure you have the latest revision of the manual or to obtain the illustrated parts catalog, please visit
the Bunn-O-Matic website, at www.bunn.com. This is absolutely FREE, and the quickest way to obtain
the latest catalog and manual updates. Contact Bunn-O-Matic Corporation at 1-800-286-6070 to
ページ2に含まれる内容の要旨
BUNN-O-MATIC COMMERCIAL PRODUCT WARRANTY Bunn-O-Matic Corp. (“BUNN”) warrants equipment manufactured by it as follows: 1) Airpots, thermal carafes, decanters, GPR servers, iced tea/coffee dispensers, MCP/MCA pod brewers thermal servers and Thermofresh servers (mechanical and digital)- 1 year parts and 1 year labor. 2) All other equipment - 2 years parts and 1 year labor plus added warranties as specified below: a) Electronic circuit and/or control boards - parts and labor for 3 years. b) C
ページ3に含まれる内容の要旨
WARNING - Inspection, testing, and repair of electrical equipment should be performed only by qualified service personnel. Disconnect the dispenser fromthe power source when servicing, except when electrical tests are required and the test procedure specifically states to connect the dispenser to the power source. CONTENTS TroubleShooting ............................................................................................4 Component Access ..............................................
ページ4に含まれる内容の要旨
TROUBLESHOOTING A troubleshooting guide is provided to suggest probable causes and remedies for the most likely problems encountered. If the problem remains after exhausting the troubleshooting steps, contact the Bunn-O-Matic Technical Service Department. • Inspection, testing, and repair of electrical equipment should be performed only by qualified service person- nel. • All electronic components have 120 – 240 volt ac and low voltage dc potential on their terminals. Shorting of terminals or
ページ5に含まれる内容の要旨
TROUBLESHOOTING (cont.) Problem Probable Cause Remedy Equipment will not operate 2. Safety overflow switch Refer to Service – safety overflow switch (cont.) for testing procedures. Automatic refill will not oper- 1. No water Check plumbing and shut-off valves. ate after drawing hot water. 2. Water strainer/flow control (A) Direction of flow arrow must be point- ing towards dispenser. (B) Remove the strainer/flow control and check for obstructions. Clear or replace. 3. Liquid level system Ref
ページ6に含まれる内容の要旨
TROUBLESHOOTING (cont.) Problem Probable Cause Remedy Water boils continuously. 1. Temperature control Refer to Service – electronic controls for testing procedures. 2. Lime build-up Inspect the tank assembliy for excess lime deposits. Delime as required. CAUTION – Tanks and tank components should be delimed reglarly depending on local water conditions. Exces- sive mineral build-up on stainless steel surfaces can initiate corrosive reactions resulting in serious leaks. Dispenser is making unu
ページ7に含まれる内容の要旨
SERVICE WARNING – Disconnect the dispenser from the power source before the removal of any panel or the replacement of any component. WARNING - Inspection, testing, and repair of electrical equipment should be performed only by qualified service personnel. Disconnect the dispenser fromthe power source when servicing, except when electrical tests are required and the test procedure specifically states to connect the dispenser to the power source. Component Access - H5E/DV-PC/X Component Acc
ページ8に含まれる内容の要旨
t t t t This equipmen is o be ins alled o comply with the Basic Plumbing Code of the Building Officials and Code Administrators International, Inc. (BOCA) and the Food Service Sanitation Manual of the Food and Drug Administration (FDA). SERVICE Liquid Level Control Flow Charts Electronic Controls H5E, H5X LIQUID LEVEL CONTROL PROBLEM: Does Not Refill Yes Overflow Cup Full Remove Power ? Drain cup No Retry Disconnect Level Probe Yes Yes Voltage present at Does Water Flow Replace Probe Solenoid
ページ9に含まれる内容の要旨
SERVICE (cont.) Electronic Controls (cont.) 4. Remove the pink wire from terminal 5 of the elec- tronic control assembly. Liquid Level Control Test Procedure 5. Check the voltage across terminals 1 & 4 of the 1. Disconnect the dispenser from the power source. electronic control board with a voltmeter. Connect 2. Check the voltage across terminals 3 & 4 of the the dispenser to the power source. The indication electronic control board with a voltmeter. Connect must be: the dispenser to the p
ページ10に含まれる内容の要旨
Electronic Controls (cont.) If voltage was not present as described, check the pink 7. Reconnect the pink wire to terminal 5 of the elec- probe wire and the green ground wire for continuity tronic control assembly. 8. Loosen the compression fitting, remove the probe and/or replace the probe. from the tank lid, and inspect it for mineral depos- Temperature Control Test Procedure its. Replace it if necessary. Keep the exposed ends of the probe away from any metal surface of the 1. Disconnect
ページ11に含まれる内容の要旨
SERVICE (cont.) Electronic Controls (cont.) If voltage was present as described, the temperature control of the system is operating properly. If voltage was not present as described, contact Bunn-O-Matic to order an electronic control board and temperature sensor for evaluation and proceed to #9. 6. Replace the electronic control board. T5 PNK to Liquid 7. Check the voltage across the tank heater terminals Level Probe with a voltmeter. Connect the dispenser to the T4 WHI or RED to Terminal
ページ12に含まれる内容の要旨
This equipment is to be installed to comply with the Basic Plumbing Code of the Building Officials and Code Administrators International, Inc. (BOCA) and the Food Service Sanitation Manual of the Food and Drug Administration (FDA). SERVICE (cont.) If voltage was present as described, reconnect the black Limit Thermostat wire and proceed to #5. Location: If voltage was not present as described, refer to the Wir- The limit thermostat is located on the tank lid. ing Diagrams and check the dispense
ページ13に含まれる内容の要旨
This equipment is to be installed to comply with the Basic Plumbing Code of the Building Officials and Code Administrators International, Inc. (BOCA) and the Food Service Sanitation Manual of the Food and Drug Administration (FDA). SERVICE (cont.) Removal and Replacement: Safety Overflow Switch 1. Disconnect the black wires from the safety overflow switch. 2. Remove the nut beneath the copper overflow cup. 3. Remove the entire switch assembly from the cup. 4. Place the new switch assembly into
ページ14に含まれる内容の要旨
ill i i li l l i i l l l i ll i ll i l l l l i l i l ! WARNING F water tank before turn ng -on thermostat or connect ng app ance to power source. Use on y on a proper y protected c rcu t capab e of the rated oad. E ectr ca y ground the chass s. Fo ow nat ona / oca e ectr ca codes. Do not use near combust b es. FAILURE TO COMPLY RISKS EQUIPMENT AMAGE, FI E, OR SHO K AZAR D R C H D READ THE ENTIRE OPERATING MANUAL INCLUDING THE LIMIT OF WARRANTY AND LIABILITY BEFORE BUYING OR USING THIS PRODUCT TH
ページ15に含まれる内容の要旨
SERVICE (cont.) Solenoid Valve (Early Models) If continuity is present as described, reconnect the wires and proceed to #7. Location: If continuity is not present as described, replace the The solenoid valve is located behind the large access solenoid valve coil. panel on the left side of the dispenser. To test the solenoid valve, access will also be needed 7. Check the solenoid valve for coil action. Connect to the electronic control board. the dispenser to the power source. Listen careful
ページ16に含まれる内容の要旨
This equipment is to be installed to comply with the Basic Plumbing Code of the Building Officials and Code Administrators International, Inc. (BOCA) and the Food Service Sanitation Manual of the Food and Drug Administration (FDA). SERVICE (cont.) Tank Heater 4. Remove the tank heater from the tank lid and in- Location: spect it for cracks in the sheath. The tank heater is located in the tank lid. If the sheath shows no sign of damage, proceed to #5. If the sheath is damaged, replace the tank he
ページ17に含まれる内容の要旨
SERVICE (cont.) Removal and Replacement: Steam Sensor (Thermistor) 1. Disconnect the dispenser from the power source. 2. Disconnect the thermistor from J5 on control Location: board. The thermistor is located on the end of the overflow 3. Loosen the set screw and the two screws securing tube above the overflow cup. the two half blocks together. Remove thermistor To test the thermistor, access will also be needed to assembly from overflow tube. the electronic control board. 4. Install new th
ページ18に含まれる内容の要旨
SERVICE (cont.) Dispense Valve (PC Only) If voltage is not present as described, refer to Wir- Location: ing Diagrams and check the dispenser wiring harness. The Dispense Valve is located behind control panel. Also check the control board for proper operation. Removal and Replacement: 1. Disconnect the dispenser from the power source and allow to cool. 2. Drain enough water from the tank so the water level is below the outlet. Bracket 3. Remove the nut and flare nut from the valve. Shroud 4.
ページ19に含まれる内容の要旨
MEMBRANE SWITCH ASSY Ready Power Heater Manual Dispense/Stop Left Dispense Middle Dispense Right Dispense “Hidden” Switch J2 6 10 1 5 N L2 L1 SCHEMATIC WIRING DIAGRAM H5E-DV PC GRN BLK-14 RED-14 Earth Ground MASTER ON/OFF SWITCH Chassis Ground RED-14 BLK-18 SELECTOR LIMIT SWITCH TANK HEATER THERMOSTAT BRN-14 BLK-14 BLK-14 4000 W TANK HEATER WHI/VIO-14 WHT-14 1800 W N.C. REFILL WHT-18 WHI/BLU-18 120VAC SOL OVERFLOW PROTECTION SWITCH 4 3 WHI-18 J7 2 1 WHT-18 VI
ページ20に含まれる内容の要旨
MEMBRANE SWITCH ASSY Ready Power Heater Manual Dispense/Stop Left Dispense Middle Dispense Right Dispense “Hidden” Switch J2 6 10 1 5 L1 L2 SCHEMATIC WIRING DIAGRAM H5E-PC GRN RED-14 BLK-14 Earth Ground EMI FILTER Chassis Ground BLK-18 RED-14 LIMIT LIMIT THERMOSTAT THERMOSTAT TANK HEATER BLK-14 BLK-14 BLU-14 BLU-14 4000 W N.C. REFILL WHI/BLU-18 230VAC RED-18 OVERFLOW SOL PROTECTION SWITCH 4 3 RED-18 DISPENSE J7 2 1 RED-18 VIO-18 230VAC SOL 5 4 N.O. 3 COM 2 1