ページ1に含まれる内容の要旨
INSTALLATION ANd OPERATION INSTRUCTIONS
FLOJET BEER PUmP PANELS
mOdEL NO.
66134-1
66134-2
66134-3
66134-4
ImPORTANT INFORmATION
Table of Contents
This manual has been prepared to assist you in the
Installing the Panel ..............................................2
operation of Perlick Beer Pump Panel System.
Panel Diagram .....................................................3
How to Operate the Beer Panel ..........................4
We dedicate considerable time to ensure that our
Beer Pump
ページ2に含まれる内容の要旨
Installation – Beer Pump Panels ■ Use panel as a template to mark where holes Important Notes should be drilled on cooler wall. Beer pump panels should not be installed with a height ◆ CAUTION: If using CO2 as a pressure supply for of greater than 5 feet from the cooler floor. A pumps, pump exhaust must be vented to a well height greater than 5 feet will potentially cause ventilated area to avoid possible asphyxiation. flow issues and require system re-balancing. (Note: Make sure pan
ページ3に含まれる内容の要旨
Diagram – Beer Pump Panel Diagram Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. Form No. Z2149A 3 Rev. 10.11.06
ページ4に含まれる内容の要旨
How to Operate – Beer Pump Panels ■ Adjust primary CO2 regulator by turning ■ Connect the coupler to a regulated water supply adjusting screw counterclockwise until it turns with pressure less than 30 psig. Note: Pump freely, then turn hand valve counterclockwise damage may occur with pressure higher on CO2 cylinder to the fully open position. Next, than 30 psig. turn regulator adjusting screw clockwise until ■ Open the water supply. Then open probe valve required system pressure plu
ページ5に含まれる内容の要旨
Diagram #2 – Beer Pump Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. Form No. Z2149A 5 Rev. 10.11.06
ページ6に含まれる内容の要旨
Diagram #3 – Cleaning Diagram Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. Form No. Z2149A Rev. 10.11.06 6
ページ7に含まれる内容の要旨
Cleaning Instructions General Information ■ When a beer system with beer pumps will be shut down for an extended period, clean the ■ The cleaning of beer lines with the new inte- system thoroughly. After completing the rins- gral flow reversal feature incorporated into the ing step, prepare a mixture of 50% food grade Perlick Beer Pump gives the line cleaner Glycerine and 50% water. Load the lines with numerous configurations for line cleaning. this mixture and make sure both ends of
ページ8に含まれる内容の要旨
8300 West Good Hope Road • Milwaukee, WI 53223 • Phone 414-353-7060 • Fax 414-353-7069 Toll Free 800-558-5592 • E-Mail: Perlick@Perlick.com • www.Perlick.com Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. Form No. Z2149A Rev. 10.11.06