ページ1に含まれる内容の要旨
SET-UP INSTRUCTIONS & PRE-OPERATION CHECKLIST for
SNAPPER SCRAMBLERS
The following instructions cover the set-up of SNAPPER SCRAMBLERs. Complete each of the following steps
carefully. Review and complete each item as instructed on the Pre-Operation checklist. The Snapper Product
Registration card must be filled out and sent to Customer Service department at Snapper when completed.
C. With all cell caps removed, connect an
WARNING
automotive type battery charger to battery terminals;
ページ2に含まれる内容の要旨
3. BATTERY INSTALLATION PRE-OPERATION CHECK (Continued from Previous Page) Complete all items on the Pre-Operation Checklist as E. Connect over flow tube and route as shown in instructed. Figure 2. BATTERY CABLES ARE INSTALLED AT THIS TIME CONNECT OVER FLOW TUBE 42” DECK SHOWN REMOVED FOR TO BATTERY BETTER VIEW OF BATTERY INSTALL NUTS HERE 33” DECK INSERT TUBE INTO HOLE IN SEAT PEDESTAL INSTALL NUTS HERE ONCE INSTALLED ROUTE TUBE AWAY
ページ3に含まれる内容の要旨
TRACKING ADJUSTMENTS (SZT UNITS ONLY) When both motion control levers are fully engaged in forward drive, the machine should move in a straight line. If the machine tracks (veers) left or right, a tracking adjustment must be made. Each motion control lever is equipped with a tracking adjustment plate. See Figure 5. Moving the plate forward or backward adjusts the machine’s tracking: 1. If mower tracks to the left, loosen the two torx screws on the left adjustment pl
ページ4に含まれる内容の要旨
PRE-OPERATION CHECKLIST Snapper has completed initial adjustments and performed operational tests prior to shipping the machine. Due to the possible effects of shipping, handling and storage, Snapper intends for all of the following items to be verified and necessary final adjustments made at time of setup. It remains good practice and is strongly recommended that all the items also be checked prior to placing the machine into service. It is very important that setup is verified and all