ページ1に含まれる内容の要旨
Installation and Assembly -Ceiling Mount for
Model: NP40CM
NEC NP 40/41/50/60/61/62/100/200 Projectors
This product is intended for use with UL
Listed products and must be installed by a
qualified professional installer.
Maximum Load Capacity: 50 lb (22.7 kg)
Read instruction sheet before you start installation and assembly.
WARNING
• Make sure that the supporting surface will safely support the combined load of the equipment and all attached hardware
ページ2に含まれる内容の要旨
Before you start check the parts list to insure all of the parts shown are included. Parts List Description Qty. Part Number A ball and socket mount 1 055-0016 B 4 mm security allen wrench 1 560-9646 C M5 x .8 x 10 mm socket pin type F screw 1 520-2031 D #10-32 x 3/8" spade thumb screw 1 560-2107 E #10-32 x 3/8" serrated washer head socket pin screw 1 520-2151 F #14 x 2.5 phillips hex head wood screw 2 5S1-015-C04 G ceiling plate 1 580-4042 H .25" ID x .56" OD x .26 spacer 2 590-2071 I extension
ページ3に含まれる内容の要旨
Installation To Wood Joist Finished Ceilings, Exposed Wood Joists, or Wood Beam Ceilings Drill two 5/32" (4 mm) dia. holes to a minimum depth of 2.5" (64 mm). Attach ceiling plate (G) with two #14 x 2.5" (6 mm x 65 mm) wood screws (F) as shown using 3/8" (10 mm) socket wrench. WOOD Skip to step 2. JOIST CEILING WARNING • Tighten wood screws (F) so that ceiling plate (G) is firmly attached, but do not overtighten. Overtightening can damage the screws, greatly reducing their holding G power. • Nev
ページ4に含まれる内容の要旨
WARNING • When installing Peerless mounts on concrete, verify that you have a minimum of 1 5/8" of actual concrete surface in the 1/4" diameter hole to be used for the concrete anchors. Do not drill into mortar joints! Concrete must meet ASTM C-90 specifications. • Concrete must be 2000 psi density minimum. Lighter density concrete may not hold concrete anchor. • Make sure that the supporting surface will safely support the combined load of the equipment and all attached hard- ware and component
ページ5に含まれる内容の要旨
Flush Mount Application Screw ball and socket mount (A) into ceiling plate (G). Align the notch with one of the four holes of the ceiling plate (G) and secure ball and socket mount (A) with a M5 x 10 mm socket pin screw (C) using security allen wrench (B) as shown in detail 1. Note: Slotted set screw (K) is used to jam against the threads of the ball and socket mount to prevent any excess movement of the ball and socket mount (A). Do not overtighten screw; overtightening screw will damage thread
ページ6に含まれる内容の要旨
Installation to G K C Extension Column Screw extension column to ceiling plate (G). G Align the notch with one of the four holes in the ceiling plate (G) and secure extension column with a M5 x 10 mm socket pin screw (C) using security allen wrench (B). EXTENSION COLUMN See detail 4. (UL Listed EXT or ADJ EXTENSION Series) COLUMN Screw extension column connector (I) to Sold Separately extension column. Align slot in extension column with one of the top holes in SLOT extension column connector (I
ページ7に含まれる内容の要旨
Find your projector from the models listed below *Notch indicates front of projector. Flip projector upside down and remove feet from bottom of projector. Fasten two M3 x 25 mm socket pin screws (N) and two .198 x .750 retaining spacers (P) into the threaded inserts as indicated below. Fasten one M3 x 16 mm socket pin screw (M) and one .156 x .375 retaining spacer (O) into the threaded insert as indi- cated below. Finish tightening screws (N, M) using 2 mm security allen wrench (Q). N M L P O
ページ8に含まれる内容の要旨
Note: The projector adapter plate and projector you are installing may differ in appearance from the sample illustrated below. Attach projector, with adapter plate already on it, to the To adjust roll, pitch, and yaw loosen the set screw 5 ball and socket mount (A) by inserting the ball and (shown below) using security allen wrench (B) or socket mount (A) into the adapter plate connection and standard 4 mm allen wrench. You should be able to twisting until the adapter plate will no longer turn j