ページ1に含まれる内容の要旨
WINDLOAD POST
WayneMark™8000, 8100
INSTALLATION INSTRUCTIONS
Wayne-Dalton Corp.
P.O. Box 67 Mt. Hope, OH 44660
www.wayne-dalton.com
See garage door owner’s manual for warranty information.
Important Notice!
READ THE ENCLOSED INSTRUCTIONS MANUAL CAREFULLY BEFORE INSTALLING THIS WINDLOAD
POST. PAY CLOSE ATTENTION TO ALL WARNING LABELS AND NOTES. THIS MANUAL SHOULD BE
ATTACHED TO THE WALL IN CLOSE PROXIMITY TO THE WINDLOAD POST.
© Copyright 2007 Wayne-Dalton Corp. Rev3 6/26/2007
307330
ページ2に含まれる内容の要旨
HEADER LOCK BRACKET (2) # 141092 TOP STRAP BRACKET HALF HINGE TOP PLATE EXTENSION (1) # 305206 (2) # 130352 (1) # 305205 STRAPS (8) # 307397 w/ 7’ kit JR. UNIVERSAL “A” FRAME BRACKET (10) #307397 w/ 8’ kit (5) # 270343 w/ 7’ kit (1) SIDE LOCK (6) # 270343 w/ 8’ kit # 292857 WING NUTS (4) # 305211 w/ 7’ kit (5) # 305211 w/ 8’ kit CARRIAGE BOLTS (3) # 305210 w/ 7’ kit - (3” LG) (4) # 305210 w/ 8’ kit- (3” LG) (1) #307529 w/ 7’ & 8’ kit’s - (3-1/2” LG) (1) BOTTOM BRACKET ASSEMBLY # 305327 (1) POST
ページ3に含まれる内容の要旨
Required Tools (1) 3/16” DRILL BIT PENCIL SAFETY GLASSES (1) 7/16” HEX HEAD DRIVER DRILL TAPE MEASURE (1) 5/8” X 4” STEP LADDER MASONRY DRILL BIT LEVEL Windload Post Installation CENTER HINGE JR. “A” Frame Installation FIG. 1 JR. “A” FRAME IMPORTANT! Refer to the windload specifi cation draw- ings (supplied) for windload post location(s). Place the “A” frame brackets below the center hinges of each intermediate section, fasten with (2) 1/4-20 x 11/16” (2) 1/4-20 X 11/16” SELF-DRILLING SCREW
ページ4に含まれる内容の要旨
DIM. 5-3/4” Header Lock Bracket Installation HEADER CENTER Mark a vertical line on the header, aligned with the LINE center of the Jr. “A” frame bracket. Measure up 1-1/2” 1-1/2” above the top of the door and mark a horizontal line. Center the header lock bracket with the vertical line and align the bottom of the header lock bracket with HEADER LOCK the horizontal line. Secure the header lock bracket to BRACKET the header using (4) 5/16” x 1-5/8” lag screws. (4) 5/16” X 1-5/8” (see Fig.
ページ5に含まれる内容の要旨
Top Plate Extension Installation Locate the top plate extension and top strap bracket. Place the top strap bracket onto the top plate extension and adjust so that the holes in the top strap bracket align with the corresponding door model holes in the top plate extension. Hold in position and secure using (4) 1/4-20 x 7/8” self-drilling screws. (see Fig. 6) Slide the top plate extension assembly into the header bracket. Now, install the windload post into the post hole in the fl oor and alig
ページ6に含まれる内容の要旨
Strap Bracket Installation Loosely attach (2) straps to each center hinge, with (1) 3” long carriage bolt and wing nut (see Fig. 8). Attach WING CENTER (2) straps to the bottom half hinge, with (1) 3-1/2” long NUT HINGE carriage bolt and wing nut (see Fig. 9). Position the straps at each center hinge, and bottom half hinge locations. Ensure that the windload post is plumb while locked into the header lock bracket and hole in fl oor. Now, secure each strap to the windload post using (1) 1/4
ページ7に含まれる内容の要旨
Securing Post for Storage Locate a convenient place to store the windload post(s). TOP OF WINDLOAD POST Measure and cut (2) 2” x 6” wood mounting blocks a minimum of 10” long for each windload post. Locate the mounting blocks horizontally on the wall as shown JR. “A” in Fig. 12. Secure them adequately to the wall at the top FRAME and bottom of the post storage location, with masonry MEASURE THE DISTANCE FROM THE anchors for concrete construction, or 16 penny nails for TOP OF THE WINDL
ページ8に含まれる内容の要旨
Attaching the Installation Decals After the installation is complete, locate in a obviously visible location on the inside of the garage door and the post(s) and place the provided installation labels and tag(s) onto the door and post(s) for future reference. IMPORTANT! LABELS AND TAG(S) MUST BE ATTACHED TO BOTH DOOR AND POST(S). Windload Label Locations 2 1 3 1 Applied by Installer - One (1) Emergency High Wind Situations Tags (161384) per post -Tags are to be applied to post(s) when stored o