ページ1に含まれる内容の要旨
22 December 1999
Customer Support Policy Letter No. 0109K-2
This Policy Letter is applicable to all models/configurations of ALF502R, ALF502L, and
LF507 Honeywell Bank Engines. This Policy Letter describes the Engine Maintenance
and Inspection Requirements Prior to Return from a Rental Period.
This Customer Support Policy Letter No. 0109K-2 replaces Customer Operations Policy
No. 0109, 0109K, and 0109K-1 all of which should be discarded.
This Customer Support Policy Letter is intended to provide
ページ2に含まれる内容の要旨
22 December 1999 7. The engine(s) must be returned at a minimum in the same general overall condition as received at the beginning of the lease period. This includes all bills of material hardware, components, and accessories present and properly installed and/or attached to the engine in accordance with the published Honeywell engine manual or Airframe Manufacturer’s Maintenance Manual (AMM). 8. Whenever operationally possible, use flexible thrust take-off procedures. NOTE Operator must incorpo
ページ3に含まれる内容の要旨
22 December 1999 POST-LEASE/CONSIGNMENT GUIDELINES PART I – RECORDS CHECK ENGINE/MODULE RECORDS ASSESSMENT 1. All maintenance actions performed by the operator on the engine shall be indicated in the following assessments: ENGINE/MODULE S/N ___________ PREPARER’S NAME _______________ MODEL ____________________ OPERATOR ________________________ ENGINE TTSN/TCSN _____________ DATE OF ASSESSMENT _____________ PART 1 – RECORDS CHECK ITEM INSPECTION/WORK TO BE PERFORMED RESULTS/REMARKS 1. Review engi
ページ4に含まれる内容の要旨
22 December 1999 POST-LEASE/CONSIGNMENT GUIDELINES PART II – SPECIAL INSPECTION AND GROUND RUN INSTRUCTIONS ENGINE S/N _________________ POSITION ______________ MODEL _____________________ OPERATOR _________________________________________________________ DATE OF INSPECTION ________________________ PART II – A. STATIC INSPECTION ITEM INSPECTION/WORK TO BE PRFORMED RESULTS/REMARKS 1. Perform external inspection of engine pay particular attention to the following: fuel/oil leakage, missing hardwar
ページ5に含まれる内容の要旨
22 December 1999 POST-LEASE/CONSIGNMENT GUIDELINES PART II – SPECIAL INSPECTION AND GROUND RUN INSTRUCTIONS (CONT.) ENGINE S/N _________________ POSITION ______________ MODEL _____________________ OPERATOR _________________________________________________________ DATE OF INSPECTION ________________________ PART II – B. GROUND RU N INSPECTION ITEM INSPECTION/WORK TO BE PREFORMED RESULTS/REMARKS 1. Record start TGT: indicate engine position GI: ______ degrees C With engine stabilized at GI, record