ページ1に含まれる内容の要旨
INSTALL INSTRUCTIONS KK-K9-F14-K-PT
K9/PRISONER TRANSPORTATION SYSTEM
2003-2009 FORD EXPEDITION
HARDWARE:
QTY: DESCRIPTION: PART #:
28 ¼-20 x ½” Stainless carriage bolt GSM32022
8 ¼-20 x ¾” Stainless carriage bolt GSM32024
64 ¼-20 flanged serrated nut GSM30023
6 ¼-20 x ¾” Hex head cap screw GSM33001
6 ¼” x 1 ½” Hex head lag screw GSM33062
36 #12 x ¾” Stainless sheet metal screw GSM34177
24 #10 x ¾” Stainless sheet metal screw GSM34170
12 #10 x ½” Stainless
ページ2に含まれる内容の要旨
FORD EXPEDITION K9/PT COMBO KIT Upper passenger side filler panel ¼” Lexan shield Driver-side tunnel Rear floor mount bracket Rear passenger Lower passenger side filler panel Floor mounting side filler panel plates and legs Front passenger Upper “B”-pillar side filler panel mounting bracket Lower passenger-side mounting foot KK-K9-F14-K-PT_INST_11-08 2
ページ3に含まれる内容の要旨
View of Expedition door panel Remove plastic trim piece. Metal Remove window/lock switch clips hold on trim assembly from door Remove hex head screws holding Remove trim piece covering torx Remove plastic door panel lower section of door panel screws under door panel armrest and remove screws Remove window switch and Remove speaker from door panel. Recommended location for switch reconnect. Wire tie switch in safe Remove screws and unplug location. connector KK-K9-F14-K-PT_INST_11-08
ページ4に含まれる内容の要旨
2006-2008 FORD EXPEDITION DOOR Remove bolt 1. Remove the specified bolt and cut on the line shown left. 2. The upper portion of the cut piece will remain off. 3. Save for vehicle re-sale. Cut on this line Back seat configuration for Remove seat bolts from center Remove rear plastic storage Ford Expedition and driver side Back seats. compartment if included. Attach the rear floor mount bracket Slide K9 section of assembly Leave passenger-side rear seat through back hatch o
ページ5に含まれる内容の要旨
Note: Mounting plate straddles a ridge in the floor. When bolts are tightened the plate will form to the floor. 7 ¾” Sub-assemble mounting leg to Attach assembly to vehicle Attach assembly to K9 floor mounting plate using ¼” x ¾” using OEM seat hardware and using ¼” x ¾” carriage bolts carriage bolts and serrated nuts. Set nutcerts in vehicle and serrated nuts mounting leg assembly to 7 ¾” View of mounting foot from Adjust mounting foot until K9 floor of K9 unit is level within the veh
ページ6に含まれる内容の要旨
Place front partition filler panel View of assembly at this time into vehicle as shown above Position front partition as Remove “B” pillar upper trim Position ¼” lexan shield shown and attach to K9 panel. Remove seat belt bolt Using holes in partition mark and housing assembly drill shield Attach using ¼” x ¾” carriage bolt and serrated nut Remove bolt located behind Remove trim panel to access Remove grab handle plastic trim bolts for grab handle. KK-K9-F14-K-PT_INST_11-08
ページ7に含まれる内容の要旨
Attach “B” pillar mounting Grab handle removed Install “B” pillar mounting bracket to front partition using bracket using bolts that hold ¼” x ¾” carriage bolts and nuts grab handle. (Re-installing the grab handle is optional) Install ceiling filler panel to Attach ceiling filler panel to View of ceiling filler passenger side of K9 housing using front partition using ¼” x ¾” from rear of vehicle ¼” x ¾” carriage bolts and nuts carriage bolt and nut Location on inside of K9 assembly
ページ8に含まれる内容の要旨
Location where ceiling filler bolts Pre-drill holes using 3/16” drill bit Attach rear partition to floor of to rear partition and attach using ¼”x 1” Lag bolts vehicle. Attach front partition to vehicle using Position floor filler panel to K9 Attach to K9 housing using #10 x 6” L-mounting bracket. Bolt bracket housing, mark holes and pre-drill ¾” sheet metal screws. to partition using ¼” x ¾” carriage K9 housing using 1/8” drill bit bolts and nuts. Bolt “L” mounting bracket to ve
ページ9に含まれる内容の要旨
Hinge up window guard and reattach to bracket with 10-32 x Standard ½” Stainless machine door panel screws and #10 Flat washers. EL NOTE: Door panel fillers are provided for the Expedition EL. This is not used for the standard length Expedition. K9 / PT unit installation complete. Shown with emergency sliding door open between K9 and Prisoner compartment. Sheet metal seams and gaps need to be carefully SILICONED at floor area. Allow silicone to dry overnight before placin