ページ1に含まれる内容の要旨
EDELBROCK
NITROUS REFILL STATION
#78000
Edelbrock Nitrous Systems
2700 California Street
Torrance, California 90503
Tech Line (800) 416-8628
Rev. 12/00
Tech Fax (310) 972-2730
ページ2に含まれる内容の要旨
Thank You…. …for purchasing an Edelbrock Nitrous Oxide Refill Station. Nitrous Oxide injection is one of the most exciting performance enhancements, for the dollar invested, on the market today. With the use of nitrous oxide come some important safety considerations. This manual has been written to help you during the installation and use of your Edelbrock Refill Station. Please read it completely before you use your system. Please pay close attention to the safety information at the
ページ3に含まれる内容の要旨
What is Nitrous Oxide? Nitrous Oxide is a cryogenic gas composed of nitrogen and oxygen molecules. It is stored as a “gas over a liquid” which means that both liquid and gaseous nitrous oxide is delivered into your engine. It is 36% oxygen by weight, which is what produces the added horsepower. By injecting more oxygen (and a corresponding fuel signal), we create the additional power much like a supercharger or a turbocharger does. Nitrous Oxide is considered an “oxidizer” and not a
ページ4に含まれる内容の要旨
þSafety Tips for the Refill Station 1. Always chain your “mother” bottle securely to a wall or solid work station to protect the bottle from falling. 2. Place the station away from high foot traffic area. This will prevent exposure to residual nitrous oxide va- pors and tripping dangers associated with the “mother” bottle stand. 3. Positively mount the pump to a solid work surface. Do not attempt to fill nitrous bottles without mounting the pump. The pumping process is cyclical an
ページ5に含まれる内容の要旨
Refill Station Bill of Materials Qty. Description 2 6 AN x 1/4 NPT, straight fitting, Blue 1 6 AN x 3/8 NPT, straight fitting, Blue 1 6 AN x 1/2 NPT, straight fitting, Blue 1 4 AN x 6 AN, Reducer Union Fitting Blue 1 1/4 NPT male x 1/4 NPT male, Union, (Blue) 1 1/4 NPT female x 1/4 NPT male x 1/4 NPT female Tee 1 1/4 NPT male x 1/8 NPT female Reducer Bushings 1 3/8 NPT male x 1/4 NPT female Reducer Bushings 2 #6AN Bottle Nut 1 326 to #4AN Adapter 2 Washer, Bottle Nut 1 326 to #4AN A
ページ6に含まれる内容の要旨
IMPORTANT NOTE: Unpack all of the components and check them against the bill of materials. If any compo- nent is missing, do not substitute parts. Call the Edelbrock Customer Service line at 800-416-8628. Proper Assembly of the Pump Station 1. Select mounting location for transfer pump. Lowest point of transfer pump should be located above highest point of tallest bottle you intend to fill. Bolt pump securely in place. 2. Install bottle stand on your nitrous oxide source bottle (
ページ7に含まれる内容の要旨
Proper Assembly of the Pump Station (Continued) 13. Install ¼ NPT x 6 AN fitting on inlet side of nitrous control valve. The control valve is the ball valve used to control the flow of nitrous from the pump to the bottle being filled. Arrow on control valve indicates flow direction. 14. Install male leg of brass ¼ NPT tee adaptor in outlet of nitrous control valve. 15. Install ¼ NPT x 6 AN fitting in the female port of tee adaptor that runs straight through. 16. Install ¼ NPT male x
ページ8に含まれる内容の要旨
How to Fill Nitrous Bottles (CONTINUED) 4. Tighten line. 5. Place the cylinder on the scale and note weight. There will be a slight weight increase due to nitrous control valve assembly. 6. Fully open the valve on the Nitrous Oxide source bottle. 7. Slowly Open the nitrous control valve assembly. 8. At this point, it is recommended to carefully loosen the line leading to the cylinder to be filled until you hear a hissing sound followed by a whitish cloud of liquid nitro