Résumé du contenu de la page N° 1
651
OWNERS MANUAL
for
E-Max™
DECANTER
COFFEE BREWERS
MODELS
2012
2016 2016EX
2072 2072L
2072FR 2072FRL
Model 2072FR
2074 2074L
Filter-Ready 3-Warmer
2074FR 2074FRL
Step-Up Brewer
with optional
8900 Decanters
Includes:
Installation
Operation
Use & Care
Servicing Instructions
Model 2012
3-Warmer
In-Line Brewer
with optional
8900 Decanters
E-Max BREWERS are covered under
U. S. Patents #570427
Résumé du contenu de la page N° 2
WARRANTY STATEMENT All electrical equipment manufactured by BLOOMFIELD It also does not apply if the serial nameplate has been INDUSTRIES is warranted against defects in materials and removed or unauthorized service personnel perform service. workmanship for a period of one year from the date of original The prices charged by Bloomfield Industries for its products installation or eighteen (18) months from the date of shipment are based upon the limitations in this warranty. Seller
Résumé du contenu de la page N° 3
TABLE OF CONTENTS Thank You for purchasing this WARRANTYSTATEMENT xi Bloomfield Industries appliance. SPECIFICATIONS 1 FEATURES & OPERATING CONTROLS 2 Proper installation, professional PRECAUTIONS & GENERAL INFORMATION 3 operation and consistent INSTALLATION 4 mainten
Résumé du contenu de la page N° 4
FEATURES AND OPERATING CONTROLS 2
Résumé du contenu de la page N° 5
PRECAUTIONS AND GENERAL INFORMATION WARNING: Electric Shock Hazard All servicing requiring access to non-insulated components must be performed by qualified service personnel. Do not open any access panels which require the use of tools. Failure to heed this warning can result in electrical shock. WARNING: Injury Hazard All installation procedures must be performed by qualified personnel with full knowledge of all applicable electrical and plumbing codes. Failure could result in pr
Résumé du contenu de la page N° 6
INSTALLATION INSTRUCTIONS READ THIS CAREFULLY BEFORE STARTING THE INSTALLATION IMPORTANT: UNPACKING & INITIAL INSPECTION To enable the installer to make 1. Unpack the unit. Inspect all components for completeness a quality installation and to and condition. Ensure that all packing materials have been minimize installation time, the removed from the unit. following suggestions and tests should be done before the 2. (See page 13) Verify that the Spray Head
Résumé du contenu de la page N° 7
INSTALLATION INSTRUCTIONS (continued) For ‘Filter-Ready” units, refer to filter installation and hook-up NOTE: This equipment must instructions packed with the brewer. be installed to comply with applicable federal, state and 5. NSF requires that the brewer be able to be moved for local plumbing codes and cleaning underneath. A flex line or loops of copper tubing ordinances. will satisfy this requirement. COPPER LOOPS OR FLEX LINES (PROVIDED BY P
Résumé du contenu de la page N° 8
OPERATION OPERATING INSTRUCTIONS IMPORTANT: 1. Energizing the Brewer: When electricity has been connected to All E-Max™ brewers are the unit, there will be a momentary flash of the power light. Turn tested and set at the factory. the brewer on by pressing the POWER key. The If programming adjust- brewer will start to fill the tank. With the proper ments are necessary, water supply the tank should be filled in about 2½ refer to the E-Max™ minutes. Once filled,
Résumé du contenu de la page N° 9
OPERATION (continued) USER’S GUIDE WARNING: 1. Remove the brew chamber from under the spray head. Burn Hazard. Place one (1) genuine Bloomfield paper filter into the brew chamber. Add your choice of pre-measured ground coffee. This appliance dispenses very hot liquid. Shake the brew chamber gently to level the coffee. Slide the brew chamber back into place. Serious bodily injury from scalding can occur from co
Résumé du contenu de la page N° 10
OPERATION (continued) PROGRAMMING FEATURES AND OPTIONS 1. View Water Temperature in Tank: To view the water temperature on the screen, the E-Max™ brewer must be ON, and not brewing or in the filling mode. Press and hold the 4th key, and depress the 6th key. The actual water temperature will be displayed for 3 seconds. 2. Daily Brew Count: The E-Max™ maintains a count of the number of completed brews for a 7-day period. To access the count, turn the b
Résumé du contenu de la page N° 11
OPERATION (continued) 8. Clock A. Time – Battery Backup. The E-Max™ has a battery backup system which will maintain the proper time during power failures, or when the brewer is unplugged (even for very prolonged periods of time). Normally there will not be a need to set the time except for Daylight Saving Time changes, or moving the brewer to different time zones. B. Changing Day and Time: To change time, turn the E-Max™ off. Pr
Résumé du contenu de la page N° 12
OPERATION (continued) 12. View Filter Statistics: To view filter statistics, turn the brewer off. Press and hold the 1st key (Brew), and depress the 3rd (ON/OFF) key. Total water volume will be displayed (TotalVol.). Press the 3rd key to view the Filter Life (FltrLife:). Press the 3rd key to view the percentage of the filter that has been used. (If the filter option is used, the filter life volume needs to be entered in the program – see E-Max™ Progra
Résumé du contenu de la page N° 13
CLEANING INSTRUCTIONS CAUTION: PROCEDURE: Clean Coffee Brewer Burn Hazard PRECAUTIONS: Disconnect brewer from electric power. Allow brewer to cool. Brewing and serving temperatures of coffee are FREQUENCY: Daily extremely hot. Hot coffee will cause TOOLS: Mild Detergent, Clean Soft Cloth or Sponge serious skin burns. Bristle Brush CAUTION: 1. Disconnect brewer from electric
Résumé du contenu de la page N° 14
SERVICING INSTRUCTIONS — PLUMBING FUNCTION 1. Water enters at the inlet fitting of the fill solenoid (32). The solenoid admits water via a command from the controller. NOTE: The solenoid has an internal strainer. To clean the strainer: Shut off water supply. Unscrew the plastic cap protruding from the rear of the brewer. Remove the cap, inlet fitting and washer. With pliers, grasp the bar of the strainer and pull straight out. Was
Résumé du contenu de la page N° 15
SERVICING INSTRUCTIONS — PLUMBING (continued) ITEM DESCRIPTION PART N0. USED ON 1 FAUCET, HOT WATER 8783-1 ALL 2 ASSEMBLY, WATER TANK (120V) 83500 2012, 2072 ASSEMBLY, WATER TANK (240V) 83753 2016, 2074 ASSEMBLY, WATER TANK (DUAL VOLTAGE) 84010 2015, 2075 6 GASKET, TANK LID 83499 ALL 9 TANK LID 83504 ALL 10 RETAINING CLIP, TANK LID 83506 ALL 11 HOSE, OVERFLOW (2 pc SILICONE 4.5” LONG) 86014 ALL 12 HOSE, FAUCET SUPPLY (SILICONE, 10” LONG) 83538 ALL 13 TUBE, VENT (METAL, 2.3” LONG) 833
Résumé du contenu de la page N° 16
SERVICING INSTRUCTIONS - ELECTRICAL FUNCTION WARNING: RISK OF INJURY 1. Pressing the POWER key energizes the unit. The POWER LED will glow whenever the unit is ON. The following servicing sections 2. Automatic fill is accomplished via a FILL SOLENOID are for operator reference only. All servicing and/or repairs must (32) and a WATER LEVEL PROBE (7). The probe senses ground through the water in the tank. When the be performed by a qualified technician wa
Résumé du contenu de la page N° 17
SERVICING INSTRUCTIONS - ELECTRICAL (continued) ITEM DESCRIPTION PART N0. USED ON 3 PROBE, TEMPERATURE 83480 ALL 4 THERMOSTAT, HI-LIMIT SAFETY (120V) 83949 2012, 2072 THERMOSTAT, HI-LIMIT SAFETY (240V) 8552-50 ALL except 2012, 2072 5 GROMMET, TEMP PROBE 84063 ALL 7 SENSOR, WATER LEVEL 83521 ALL 8 SLEEVE, WATER LEVEL SENSOR 83532 ALL 15 ELEMENT, HEATER 1500W (120V) 83518 2012, 2072 ELEMENT, HEATER 1200W (120V) 83747 2012CA, 2072CA ELEMENT, HEATER 3200 W (240V) 83748 2016, 2074 17 ASSEM
Résumé du contenu de la page N° 18
SERVICING INSTRUCTIONS — DE-LIMING WATER HEATER TANK CAUTION - CHEMICAL 1. Disconnect brewer form the electrical supply. Turn off BURN HAZARD the water supply and disconnect water supply from the brewer inlet fitting. De-liming chemicals are caustic. 2. Remove the top panel or top warmer section to gain Wear appropriate protective gloves access to internal components. and goggles during this procedure. 3. Disconnect water level sensor and water te
Résumé du contenu de la page N° 19
TROUBLESHOOTING SUGGESTIONS If the E-Max™ goes into the error diagnostic mode as outlined below, it will likely be necessary to reset the brewer in order to test individual components. Note the reset procedure below: * For the first four error modes, press and hold CANCEL for 3 seconds, or RE-ENERGIZE the brewer by disconnecting from electric power for 5 seconds, then reconnecting. * From “VALVE FAULT”, the brewer must be RE-ENERGIZED! Using the CANCEL button will not
Résumé du contenu de la page N° 20
EXPLODED VIEW & PARTS LIST 3-WARMER IN-LINE BREWER MODELS: 2012, 2016 18