Résumé du contenu de la page N° 1
Owner’s Manual
Installation and Operation
Models:
Pier-HV-IPI
ST-HV-IPI
LCOR-HV-IPI
RCOR-HV-IPI
READ THIS MANUAL BEFORE INSTALLING OR
OPERATING THIS APPLIANCE. THIS INSTALLERS
WARNING: IMPROPER INSTALLA-
GUIDE MUST BE LEFT WITH APPLIANCE FOR
TION, ADJUSTMENT, ALTERATION,
FUTURE REFERENCE.
SERVICE OR MAINTENANCE CAN
CAUSE INJURY OR PROPERTY DAM-
AGE. REFER TO THIS MANUAL. FOR
WARNING: IF THE INFORMATION
ASSISTANCE OR ADDITIONAL INFOR-
IN THESE INSTRUCTIONS IS NOT
MATION CONSULT A QUALIFIED IN-
FO
Résumé du contenu de la page N° 2
Safety and Warning Information These units MUST use one of the vent systems READ and UNDERSTAND all instructions carefully ! ! described in the Installing the Fireplace section of before starting the installation. FAILURE TO the Installers Guide. NO OTHER vent systems or FOLLOW these installation instructions may result components MAY BE USED. in a possible fire hazard and will void the warranty. This gas fireplace and vent assembly MUST be Prior to the first firing of the fireplace, READ the !
Résumé du contenu de la page N° 3
Table of Contents Safety and Warning Information .................................................. 2 Service Parts List ......................................................................... 4 Approvals and Codes ................................................................ 13 Appliance Certification ................................................................................. 13 Installation Codes ......................................................................................
Résumé du contenu de la page N° 4
Service Parts Pier-HV-IPI Beginning Manufacturing Date: 6-03 (NG, LP) Exploded Parts Diagram Ending Manufacturing Date: ______ 3 1 5 4 2 6 Log Assembly Grate Bar 4 Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Résumé du contenu de la page N° 5
Service Parts List (NG, LP) PIER-HV-IPI IMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealers VIP site. When ordering, supply serial and model numbers to ensure correct service parts. AVAILABLE TO SHIP IN 24 HOURS ITEM DESCRIPTION SERIAL # PART NUMBER Burner Orifice NG (#33DMS) 582-833 Y Burner Orifice LP (#50DMS) 582-850 Y 1 End Glass Assembly GLA-MS Y 2 Glass Door Assembly GLA-6TROC Y 3 Burner Assembly 2005-006 Y 4 Log Grate 2005-012 5Side Refractory SR
Résumé du contenu de la page N° 6
ST-HV-IPI Service Parts Beginning Manufacturing Date: 6-03 (NG, LP) Exploded Parts Diagram Ending Manufacturing Date: ______ 4 2 3 1 5 Log Assembly Grate Bar 6 Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Résumé du contenu de la page N° 7
Service Parts List (NG, LP) ST-HV-IPI IMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealers VIP site. When ordering, supply serial and model numbers to ensure correct service parts. AVAILABLE TO SHIP IN 24 HOURS ITEM DESCRIPTION SERIAL # PART NUMBER Burner Orifice NG (#32DMS) 582-832 Y Burner Orifice LP (#50DMS) 582-850 Y 1 Glass Door Assembly GLA-6TROC Y 2 Burner Assembly 2005-006 Y 3 Log Grate 2005-012 4 Side Refractory SRV2005-730 5 Log Set Assembly L
Résumé du contenu de la page N° 8
LCOR-HV-IPI Service Parts (NG, LP) Exploded Parts Diagram Beginning Manufacturing Date: 6-03 Ending Manufacturing Date: ______ 1 6 2 3 15 5 4 7 Log Assembly 15 Part number list on following page. 8 Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Résumé du contenu de la page N° 9
Service Parts List (NG, LP) LCOR-HV-IPI IMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealers VIP site. When ordering, supply serial and model numbers to ensure correct service parts. AVAILABLE TO SHIP IN 24 HOURS ITEM COMMON PARTS SERIAL # PART NUMBER Burner Orifice NG (#32DMS) 582-832 Y Burner Orifice LP (#50DMS) 582-850 Y 1End Glass Assembly GLA-MS Y 2 Glass Door Assembly GLA-6TROC Y 3Burner Assembly 2005-006 Y 4 Log Grate 2005-012 5 Side Refractory SR
Résumé du contenu de la page N° 10
RCOR-HV-IPI Service Parts (NG, LP) Exploded Parts Diagram Beginning Manufacturing Date: 6-03 Ending Manufacturing Date: ______ 6 5 15 1 3 4 7 Log Assembly 2 Grate Part number list on following page. Bar 10 Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Résumé du contenu de la page N° 11
Service Parts List (NG, LP) RCOR-HV-IPI IMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealers VIP site. When ordering, supply serial and model numbers to ensure correct service parts. AVAILABLE TO SHIP IN 24 HOURS ITEM COMMON PARTS SERIAL # PART NUMBER Burner Orifice NG (#32DMS) 582-832 Y Burner Orifice LP (#50DMS) 582-850 Y 1End Glass Assembly GLA-MS Y 2 Glass Door Assembly GLA-6TROC Y 3 Burner Assembly 2005-006 Y 4 Log Grate 2005-012 5 Side Refractory S
Résumé du contenu de la page N° 12
PIER-HV-IPI, ST-HV-IPI L&RCOR-HV-IPI Service Parts (NG, LP) Exploded Parts Diagram Beginning Manufacturing Date: 6-03 Ending Manufacturing Date: ______ 13 14 8 9 7 10 11 12 6 1 2 5 4 3 AVAILABLE TO SHIP IN 24 HOURS ITEM DESCRIPTION SERIAL # PART NUMBER 1 ON/OFF Rocker Switch 060-511 Y 2ON/OFF Wire Assembly 060-521A Y 3Valve NG 750-500 Y 3Valve LP 750-501 Y 4 Flexible Gas Connector 2005-009 Y 5Module 593-592 Y 6Wire Assembly 593-590A Y 7 Ember Box Assembly 2005-114 Y 8 Pilot Assembly NG 385-51
Résumé du contenu de la page N° 13
Approvals and Codes 1 Appliance Certification High Altitude Installations U.L. Listed gas appliances are tested and approved with- The Heat & Glo fireplace models discussed in this Installers out requiring changes for elevations from 0 to 2,000 feet in Guide have been tested to certification standards and listed the U. S. A. and in Canada. by the applicable laboratories. When installing this appliance at an elevation above 2,000 feet, it may be necessary to decrease the input rating by Certifica
Résumé du contenu de la page N° 14
Inspection NOTE: The following requirements reference various The state or local gas inspector of the side wall horizontally Massachusetts and national codes not contained in vented gas fueled equipment shall not approve the installa- this document. tion unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with G. Requirements for the Commonwealth of the provisions of 248 CMR 5.08(2)(a)1 through 4. Massachusetts Exemptions The following eq
Résumé du contenu de la page N° 15
Getting Started 2 Introducing the Heat & Glo Gas Fireplaces The Heat & Glo Warranty will be voided by, and Heat & Glo disclaims any responsibility for, the following actions: Heat & Glo direct vent gas fireplaces are designed to oper- • Installation of any damaged fireplace or vent system ate with all combustion air siphoned from outside of the building and all exhaust gases expelled to the outside. component. • Modification of the fireplace or direct vent system. The information contained in th
Résumé du contenu de la page N° 16
5-1/4 (133mm) 1/2 (13mm) 12 (306mm) Ø8 (205mm) 12 42-5/8 Ø8 (305mm) (1082mm) (205mm) ELECTRICAL ACCESS 32-5/16 42 (820mm) 21-9/16 (1067mm) (547mm) GAS LINE 21-9/16 34-3/4 ACCESS (547mm) (883mm) 2-5/16 4-1/16 17-15/16 (58mm) (102mm) (455mm) 37-7/16 (950mm) 24 4-1/2 4-3/4 (610mm) (114mm) (121mm) TOP VENT COLLARS TOP STANDOFFS REAR VENT COLLARS SIDE GLASS DOOR GAS CONTROLS & LABELS GAS LINE ACCESS ELECTRICAL ACCESS Figure 1. Diagram of the PIER-HV-IPI 16 Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-C
Résumé du contenu de la page N° 17
5-14 (133mm) 1/2 (13mm) (4) 12 (306mm) Ø8 (205mm) 12 (305mm) Ø8 46-5/8 (205mm) (1183mm) ELECTRICAL ACCESS 32-5/16 (821mm) 4-1/2 34-3/4 42 (114mm) (882mm) (1067mm) 21-9/16 GAS LINE (548mm) ACCESS 8-1/2 (216mm) 36-3/16 2-5/16 24 4-1/16 (919mm) 2-9/16 (58mm) (610mm) (102mm) (64mm) 4-3/4 4-1/2 (121mm) (114mm) TOP VENT COLLARS TOP STANDOFFS REAR VENT COLLARS GAS CONTROLS SIDE GLASS & LABELS DOOR GAS LINE ACCESS ELECTRICAL ACCESS Figure 2. Diagram of the ST-HV-IPI Heat & Glo • PIER-HV-IPI, ST-HV-IPI
Résumé du contenu de la page N° 18
1/2 (13mm) 5-1/4 (4) (133mm) Ø8 (205mm) 12-1/16 (306mm) 12 (305mm) Ø8 42-5/8 17-15/16 (205mm) (1083mm (455mm) ELECTRICAL ACCESS GAS LINE ACCESS 34-3/4 21-9/16 (882mm) 21-9/16 2-9/16 (548mm) (547mm) (64mm) 42 (1067mm) 2-5/16 (58mm) 10 32-5/16 (254mm) 24-1/8 (821mm) (612mm) 7-1/4 37-7/16 (184mm) 29-1/4 (950mm) (743mm) 4-3/4 (121mm) TOP STANDOFFS TOP VENT COLLARS REAR VENT COLLARS SIDE GLASS DOOR END GLASS GAS LINE DOOR ACCESS GAS CONTROLS & LABELS ELECTRICAL ACCESS Figure 3. Diagram of the LCOR-HV
Résumé du contenu de la page N° 19
Installing the Fireplace 3 Step 1. Locating the Fireplace Note: This location diagram MUST be followed when in- The diagram below shows space and clearance require- stalling a Pier-HV with a Catalina shelf/marble package since the fireplace is installed further from finished wall. ments for locating a fireplace within a room. FINISHED Note: Refer to Figure 4B for dimensions and appliance WALL locations if installing a Pier-HV unit with a Catalina shelf and/or marble package. GLASS GLASS RCOR-H
Résumé du contenu de la page N° 20
Step 2. Framing the Fireplace Minimum Clearances from the Fireplace to Combustible Materials Fireplace framing can be built before or after the fireplace is set in place. Framing should be positioned to accommo- date wall coverings and fireplace facing material. The dia- Inches mm gram below shows framing reference dimensions. Glass Sides or Ends .......... 36 .................... 914 CAUTION: MEASURE FIREPLACE DIMENSIONS AND Floor ................................... 0 .......................