Résumé du contenu de la page N° 1
Installation Guide
Purist™ Effervescent Bath
K-1191-L, K-1191-R, K-1191-LC,
K-1191-RC
M product numbers are for Mexico (i.e. K-12345M)
Los números de productos seguidos de M corresponden a México (e.j.
K-12345M)
Français, page “Français-1”
Español, pagina “Español-1”
1012493-2-A
Résumé du contenu de la page N° 2
Important Information WARNING: When using electrical products, basic precautions should always be followed, including the following: DANGER: Risk of electric shock. Connect only to a circuit protected by a Ground-Fault Circuit-Interrupter (GFCI). WARNING: Risk of electric shock. A licensed electrician should make all electrical connections. WARNING: Risk of electrical shock. Disconnect power before servicing. WARNING: Risk of injury or property damage. Please read all instructions thoroughly bef
Résumé du contenu de la page N° 3
Important Product Information (cont.) Electrical Requirements The installation must have a Class A Ground-Fault Circuit-Interrupter (GFCI). The GFCI protects against line-to-ground shock hazard. Use a 240V, 15A, 60 Hz dedicated service. An equipment grounding terminal is provided in the field wiring compartment. To reduce the risk of electrical shock, this terminal must be connected to the grounding means provided in the electrical supply panel with a conductor equivalent in size to the circuit c
Résumé du contenu de la page N° 4
Thank You For Choosing Kohler Company We appreciate your commitment to Kohler quality. Please take a few minutes to review this manual before you start installation. If you encounter any installation or performance problems, please don’t hesitate to contact us. Our phone numbers and website are listed on the back cover. Thanks again for choosing Kohler Company. Recommended Tools and Materials Adjustable Strap Pipe Hacksaw or Wrench Wrench Wrench Tube Cutter Propane Plumbers Thread Assorted Solde
Résumé du contenu de la page N° 5
Bathing Effervescence Port Well Rim System Controll ( On/Off ) Bathing Well Overflow Drain Overflow Chromatherapy Channel Lights Chromatherapy Light Control Pump Motor 1. List of New Terms Bathing well-The deep portion on the bath used by the bather. Bathing well rim-The high rim between the bathing well and the overflow channel. Water will cascade over the bathing well rim and into the overflow channel when entering the bath. Cavitation-When air is drawn into the pump instead of water to a point
Résumé du contenu de la page N° 6
12-3/16” 3-15/16” (31cm) (10cm) 46” (116.8cm) 23” (58.4cm) PUMP/CONTROL ACCESS 1-3/16” 1-3/8” 72” (182.9cm) (3cm) (3.5cm) 6-3/8” (16.2cm) 25-3/16” 24” (64cm) (61cm) 6” (15.2cm) 1-1/2” O.D. 7/16” (1.1cm) 132 2. Roughing In Information NOTICE: Unless otherwise specified, floor support under the bath must provide for a minimum of 80 lbs./square foot (390 Kg./square meter) loading. Consult local and national codes for a minimum air gap requirements when installing a spout on the faucet deck. Unit requ
Résumé du contenu de la page N° 7
9-1/2" (24.1cm) 7" (17.8cm) Deck 6-1/2" (16.5cm) 3. Construct the Stud Framing NOTICE: Provide unrestricted service access to the pump, in-line heater and control box. You must construct an access panel to provide sufficient clearance for servicing the pump, in-line heater, and control box. Construct stud framing designed for your particular installation. Frame the floor, or construct a frame for a raised installation in accordance with the roughing-in information. When constructing the frami
Résumé du contenu de la page N° 8
Pump Drainage Banding Straps Suction Line Outer Rim Drainage 2" MIN. (5.1cm) Inner Rim Bathing Well Suction Line 6. Position the Unit CAUTION: Risk of product damage. Do not lift or support the unit by the pump or piping. With help, carefully lift the unit into place. Cut and discard the banding straps from the pump. Insert the drain tailpiece into the trap. 7. Install the Plumbing CAUTION: Risk of property damage. Ensure a watertight seal on the drain connections. IMPORTANT! Choose a fill spout
Résumé du contenu de la page N° 9
System Control Chromatherapy Light Control ("On/Off") Junction Box Line 1 (Black) Black Ground (Green) Green Electrician to provide suitable strain relief Black Line 2 (Black) Bonding Lugs Follow Local Codes 8. Make the Electrical Connections NOTE: The product model number is printed on a label on the pump side of the unit. This label also identifies the electrical rating of the product. WARNING: Risk of electrical shock.Make sure the power has been disconnected before performing the f
Résumé du contenu de la page N° 10
Test Run the Bath (cont.) Verify that the chromatherapy lights are operating. Upon start-up the lights should be changing through the color sequence. Press the light control switch (located directly across the bath from the power switch). The lights should stop sequencing and stay one color. Press the light control switch again and lights will deactivate. Check the harness connections for leakage one more time. Press the ″On/Off″ control switch again to turn off the unit. The switch will also tu
Résumé du contenu de la page N° 11
Finished Deck Silicone Material Sealant Bath Access Panel Framing Water–Resistant Wall Material 10. Complete the Finished Wall or Deck NOTICE: Provide unrestricted service access to the pump, in-line heater, and control box. You must construct an access panel to provide sufficient clearance for servicing the pump, in-line heater, and control box. Protect the product surface. Cover the framing with water-resistant wall material. Keep the entire overflow channel area exposed to allow access to the
Résumé du contenu de la page N° 12
Chromatherapy Lights 13. Using Your Bath Fill the Bath NOTE: Please read these steps carefully before you operate your bath. NOTE: The water temperature in the bath should not exceed 104° F (40° C) or the heater will not operate. IMPORTANT! Like any other bath, prevent flooding the area around the unit by entering the filled bathing well slowly. This will allow the system to properly drain excess water. Fill the unit 4” (10.2cm) to 6” (15.2cm) from the bathing well rim. Operating Sequence Press th
Résumé du contenu de la page N° 13
14. Chromatherapy Light Operation The submerged chromatherapy lights automatically turn on in the stationary setting when you start the bath. Press the “Lights” control switch (located on the opposite side of the pump control) once and the submerged chromatherapy lights will slowly cycle through the color spectrum (sweep mode). The light control switch pulses blue for five seconds at the start of the sweep mode. Press the “Lights” control switch again to lock the chromatherapy lights in a particu
Résumé du contenu de la page N° 14
1012493-2-A Kohler Co.
Résumé du contenu de la page N° 15
Kohler Co. 1012493-2-A
Résumé du contenu de la page N° 16
USA: 1-800-4-KOHLER México: 001-877-680-1310 Canada: 1-800-964-5590 kohler.com ©2002 Kohler Co. 1012493-2-A