Résumé du contenu de la page N° 1
[ Quick Start Guide ]
SilverStorm™ 9120 INSTALLATION d
QUICK START GUIDE
Résumé du contenu de la page N° 2
Purchasers of OEM products should consult with the OEM for support. Support Headquarters QLogic Corporation 4601 Dean Lakes Blvd Shakopee, MN 55379 QLogic Web Site www.qlogic.com Technical Support Web Site support.qlogic.com Technical Support Email support@qlogic.com Technical Training Email tech.training@qlogic.com North American Region Email support@qlogic.com Phone +1 952-932-4040 Fax +1 952-932-4018 All other regions of the world QLogic Web Site www.qlogic.com
Résumé du contenu de la page N° 3
SilverStorm 9120 Quick Start Guide Pre-Installation Checklist Before beginning the actual installation, the Site Implementation Engineer must perform the following tasks: Step 1. Check the packing list to verify all ordered equipment has been received. The box should contain: ❑ A SilverStorm 9120 switch with the following pre-installed: ❑ Four (4) fan units ❑ Power supplies and blanks (6 total). ❑ InfiniBand (IB) leaf modules (up to 12 total) ❑ Spine modules and blanks (up to 3 total) ❑ Virtual
Résumé du contenu de la page N° 4
❑ Release Notes. Step 2. Unpack the equipment. Step 3. Inspect the equipment for any shipping damage. NOTE: Any shipping damage should be reported to the shipping company. Step 4. Verify that the equipment shipped matches the packing list. Tools and Equipment Required ❑ An ESD wrist strap ❑ A #2 Phillips screwdriver ❑ Pen (felt-tip) to mark the mounting holes on the rack 2
Résumé du contenu de la page N° 5
Installation Tasks NOTE: Before performing the installation tasks, take a few minutes to review the figures below. It is important to understand the slot numbering for the leaf modules and spine modules (and the corresponding spine RJ-45 ports). It is also important to understand the slot numbering for the fans and power supplies (and the corresponding AC power inlets for the power supplies). Figure 1. SilverStorm 9120 Chassis Front View Spine 3 (Unmanaged) Fan Fan 4 3 Spine 2 (Managed) Spine
Résumé du contenu de la page N° 6
To perform the actual switch installation, the site implementation engineer must perform the following tasks, which are detailed in this section. Step 1. Check the installation site to verify the installation of cabinet power feeds, rails, and grounding. Step 2. Inspect the packaging and equipment for any shipping damage. Any shipping damage should be reported to the shipping company. Only unpack the the equipment if there is no shipping damage. Step 3. Record the equipment serial numbers. Step
Résumé du contenu de la page N° 7
❑ Flow control = XON/XOFF Step 2. Power up the switch. Step 3. To change the switch default IP address enter: setChassisIpAddr -h ipaddress -m netMask where -h ipaddress is the new IP address in dotted decimal (i.e., xxx.xxx.xxx.xxx) format, and -m netMask is the new subnet mask in dotted decimal (i.e., xxx.xxx.xxx.xxx) format. Step 4. To change the switch default gateway IP address enter: setDefaultRoute -h ipaddress where -h ipaddress is the new default gateway IP address in dotted decimal (
Résumé du contenu de la page N° 8
where -h ipaddress is the new IP address in dotted decimal (i.e., xxx.xxx.xxx.xxx) format, and -m netMask is the new subnet mask in dotted decimal (i.e., xxx.xxx.xxx.xxx) format. Step 7. To change the switch default gateway IP address enter: setDefaultRoute -h ipaddress where -h ipaddress is the new default gateway IP address in dotted decimal (i.e., xxx.xxx.xxx.xxx) format. Step 8. To to exit the CLI enter: logout Using the Chassis Viewer Step 1. Power up the switch. Step 2. Connect a Categor
Résumé du contenu de la page N° 9
Step 5. Type in the new switch IP address. Step 6. Type in the new net mask. Step 7. Click Apply. Step 8. To change the switch default gateway, from the main menu select OOB LAN IP then Set Default Gateway IP. The following screen is displayed: Figure 4. Set Default Gateway IP Window Step 9. Type in the correct switch default gateway IP address. Step 10. Click Apply. NOTE: A reboot is required to activate the new gateway IP address. Activating/Deactivating the Embedded Fabric Manager If the embe
Résumé du contenu de la page N° 10
Step 2. Check that the CD has been mounted. Type ls /mnt/cdrom. The system returns a list of files on the CD. Step 3. Create a subdirectory on the drive where the documentation will reside. Step 4. Type cp /mnt/cdrom/ / to copy the documentation to the subdirectory created in Step 3. Step 5. Navigate to the Documentation directory and open the desired PDF file. 8
Résumé du contenu de la page N° 11
Declaration of Conformity QLogic Corporation. 26650 Aliso Viejo Parkway Aliso Viejo, CA 92656 Phone: 949.389.6000 www.qlogic.com QLogic Corporation declares the following product is in compliance with the following standards. Product identification: Name: 144 Port InfiniBand Switch Model/Type: SilverStorm 9120 Standards applied: FCC Part 15, Subpart B, Class A; ICES-003; EMC; EN55022, Class A, EN61000-3-2 and EN61000-3-3; VCCI, Class A and EN55024 Test House: Test report is issued by: Name: Und
Résumé du contenu de la page N° 12
10
Résumé du contenu de la page N° 13
© 2007 QLogic Corporation. QLogic, the QLogic logo, the Powered by QLogic logo, SANbox, SANsurfer, and SANsurfer Management Suite are registered trademarks or trademarks of QLogic Corporation. All other brands and product names are trademarks or registered trademarks of their respective owners. Information supplied by QLogic is believed to be accurate and reliable. QLogic Corporation assumes no responsibility for any errors in this brochure. QLogic Corporation reserves the right, without notice,
Résumé du contenu de la page N° 14
QLogic Corporation 26650 Aliso Viejo Parkway Aliso Viejo, CA 92656 949.389.6000 www.qlogic.com D000010-002 Rev. A J