Résumé du contenu de la page N° 1 
                    
                        INSTALLATION INSTRUCTIONS
RECORD THIS UNIT INFORMATION FOR FUTURE 
REFERENCE:
Model Number
Serial Number
Date Purchased
®
BRISK AIR
579 Series, 590 Series, & 595 Series
ROOF TOP AIR CONDITIONER
USA
SERVICE OFFICE
USED WITH
Dometic Corporation
2320 Industrial Parkway
3107210 AIR DISTRIBUTION BOX KIT and 
Elkhart, IN 4656
574-294-25
3109226.005 COMFORT CONTROL CENTER 
CANADA
Dometic Corporation
ELECTRONIC KIT
46 Zatonski, Unit 3
TM
Brantford, ON N3T 5L8
3109228.001 (White) Comfort Control Cente
                    
                    Résumé du contenu de la page N° 2 
                    
                        INSTALLATION INSTRUCTIONS SAFETy INSTRUCTIONS 1. gENERAL INFORMATION A. THIS AIR CONDITIONER IS DESIgNED FOR: This manual has safety information and instructions to   . Installation on a recreational vehicle during the time the vehicle  is manufactured. help users eliminate or reduce the risk of accidents and   2. Mounting on the roof of a recreational vehicle. injuries.  3. Roof construction with rafters/joists on minimum of 6 inch  centers. RECOgNIzE SAFETy INFORMATION  4. Minimum of 2.00 in
                    
                    Résumé du contenu de la page N° 3 
                    
                        INSTALLATION INSTRUCTIONS                                                                                                                                                                           3 SPECIFICATIONS MODEL NOMINAL ELECTRICAL COMPRESSOR COMPRESSOR FAN MOTOR FAN MOTOR SCFM-HIGH TOTAL  REFRIGERANT MINIMUM AC I
                    
                    Résumé du contenu de la page N° 4 
                    
                        INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS B.  OTHER LOCATIONS  1. PRECAUTIONS  When no roof vent is available or another location is desired, the  following is recommended:  . For one unit installation: The air conditioner should be    Improper installation may damage equipment/could  mounted slightly forward of center (front to back) and    endanger life, cause serious injury and/or property  centered from side to side. damage.  2. For two unit installations: Install one Air Conditio
                    
                    Résumé du contenu de la page N° 5 
                    
                        INSTALLATION INSTRUCTIONS C. AFTER LOCATION HAS BEEN SELECTED: 3. ROOF PREPARATION  . Check for obstructions in the area where air condi-    Before preparing the ceiling opening, the type of system options must be  tioner will be installed. decided upon. If a remote sensor is to be used, provision must be made   2. The roof must be designed to support 30 pounds     for it. If the load shed option is to be used, wires must be run from the  when the RV is in motion. Normally a 200 lb. static    
                    
                    Résumé du contenu de la page N° 6 
                    
                        INSTALLATION INSTRUCTIONS  furnace thermostat leads must be routed to the roof     opening of the air conditioner that will control it. Make     FIg. 3 sure that at least 5” of the furnace thermostat wires     extend into the roof opening.  9. If an Energy Management System (load shed fea-    ture)  is to be used with the control, two wires must     be routed to the roof opening of the zone to be     managed. The signal required for this function is     normally open relay contact. When the EMS
                    
                    Résumé du contenu de la page N° 7 
                    
                        INSTALLATION INSTRUCTIONS press onto the base plate.  3. A 3/8” diameter hole will be needed to route the cable     through the wall. 5. PLACINg THE AIR CONDITIONER   ON THE ROOF B. CONTROL CABLE INSTALLATION A. Remove the Air Conditioner from the carton     A 4-conductor control cable must be routed from the roof opening to  and discard. the Comfort Control Center™. B.  Place the Air Conditioner on the roof.  . Choose the shortest, most direct route from the 4-    /4” (±  /8”) opening to th
                    
                    Résumé du contenu de la page N° 8 
                    
                        INSTALLATION INSTRUCTIONS F. Measure the ceiling thickness: 6. DISCHARgE DUCT & CEILINg   . If the distance is 2” to 3” remove the perforated tabs     TEMPLATE INSTALLATION  from the bottom duct only. A. Remove the air box and mounting hardware from their     2. If the distance is 3” to 4” install ducts as received.  carton. The upper duct is shipped inside the lower duct     3. If the distance is 4” to 6” (maximum thickness),     which is part of the ceiling template. optional Duct Kit and Bol
                    
                    Résumé du contenu de la page N° 9 
                    
                        INSTALLATION INSTRUCTIONS as shown in FIG. 3. Drive two (2) #  0 x 3/8” blunt point    TROL KIT phillips head screws (provided) through ceiling template    A. If your installation included the optional electric heat kit,    into holes in electronic control kit to hold it in place. install it at this time. Follow the instructions with the     heat package for its installation procedure. B. Terminate the 4-conductor control cable(s) protruding     into the 4-  /4” x  4-  /4” (±  /8”) roof op
                    
                    Résumé du contenu de la page N° 10 
                    
                        INSTALLATION INSTRUCTIONS Note: Dip switches are in the “OFF” position when shipped from the  B. CONNECTION OF 120 VOLT POWER SUPPLy factory.  . Zone selection - when two or more units are installed     and controlled by one Comfort Control Center, the     Disconnect 120 volt AC. Failure to follow these instruc- second unit becomes Zone 2, the third unit Zone 3     tions could create a shock hazard causing death or  and the fourth unit Zone 4. The appropriate zone dip     severe personal injury
                    
                    Résumé du contenu de la page N° 11 
                    
                        INSTALLATION INSTRUCTIONS 9.  AIR BOX INSTALLATION FIg. 15 A. Remove return air grille from air box by pulling in on half-   round	finger	catches. B. Hold air box up to ceiling template and install three (3)    #0 x 3/8” (C) screws at air box mounting point.  C. Snap hole plug (E) into place at rear of air box. D. Install four (4) wood screws (B) which hold the air box    tight to ceiling, if desired. E. Reinstall	return	air	grille	and	filter	into	air	box. F. The air conditioner installation is
                    
                    Résumé du contenu de la page N° 12 
                    
                        INSTALLATION INSTRUCTIONS MOUNTINg PARTS AIR CONDITIONINg UNIT A. (4) /4” — #20 x 7” bolts  B. (4) #8 x 5/8” long sharp point wood screws C. (7) #0 x 3/8” blunt point tapping screws D. () Hole Plug  ELECTRONIC CONTROL KIT UNIT FIELD WIRINg DIAgRAM 2