ÉÂÔ Installation Instructions
Installation of
Field Feature Bill of Material (FFBM)
PN 26L0451
Install Network Node Control Point (NNP-B)
Type 3
(Based on 6275)
Feature Code 5423
on IBM 3746-900.
Written by: C. Vallee
Checked by: C. Franoux
Approved by: A. Badino
Reviewed by: R. Lympany
3746 PN 42L2445 EC F52322 EC F12701A EC F70078
FFBM 1 of 10 09 Oct 1998 14 DEC 1998 22 APR 1999
Copyright IBM Corp. 1998, 1999 1
Résumé du contenu de la page N° 2
ÉÂÔ Installation Instructions 3746 PN 42L2445 EC F52322 EC F12701A EC F70078 FFBM 2 of 10 09 Oct 1998 14 DEC 1998 22 APR 1999 2
Résumé du contenu de la page N° 3
ÉÂÔ Installation Instructions Before Installation (Steps 1-8) 1.0 Machines Affected 3746 Model 900 with service processor and network node processor type: 6275-56U, 6275-83U, 7585-P02, or 3172-P90. This feature should only be applied on the machine serial number for which it is specified. 2.0 Related BMs and ECs 2.1 Prerequisites (Must be installed prior to this installation) Feature Title 5053 Service Processor type 6275-56U or 6275-83U or 5052 Service Processor type 7585-P02 or 5021 Servic
Résumé du contenu de la page N° 4
ÉÂÔ Installation Instructions 2.2 Concurrent ECs (Must be installed together) None. 2.3 Companion ECs (May be installed together) None. 3.0 BMs to be Installed Feature B/M Title 26L0451 Network Node Processor B (NNP-B) Feature Code 5423 4.0 Preparation 1. Familiarize yourself with the purpose and details of the installation instruction before negotiating machine time with the customer. 2. Check all items listed on the BM(s) to determine that all parts have been received. Refer to chapter 1 i
Résumé du contenu de la page N° 5
ÉÂÔ Installation Instructions 6.2 Description The installation of the NNP-B is divided into two main steps: 1. Installing the 6275-56U or the 6275-83U system unit 2. Loading the code on the NNP-B. Note: These steps are documented in the Network Node Processor Installation and Maintenance (Based on 6275), SY33-2126. 3746 PN 42L2445 EC F52322 EC F12701A EC F70078 FFBM 5 of 10 09 Oct 1998 14 DEC 1998 22 APR 1999 5
Résumé du contenu de la page N° 6
ÉÂÔ Installation Instructions 7.0 Installation Time FFBM Machine Hrs. System Hrs. Nbr of CEs 26L0451 0.2 0.0 1 Note: To reduce the MES installation time it is recommended that you load the Network Node Processor Code on the Service Processor and install the system unit at the same time. No impact on 3745 customer operations. 8.0 Tools/Material Required None. Installation (Steps 9-12) 9.0 Safety Review the Safety Notices and the Safety Inspection Procedures located at the beginning of the IB
Résumé du contenu de la page N° 7
ÉÂÔ Installation Instructions 3. Shutdown and restart the Service Processor and re-iml the 3746-9x0 10.2 Enabling the NNP Back-up Function Important It's a customer task, but ask the customer if he wants you to perform this task. 1. On the 3746-9X0 main menu, Click on Network Node Processor Man- agement. 2. Double click on Manage Control Point on NNPs. 3. Click on Enable the CP/NNP back-up. 4. Click on Close to exit from the function. Note: For details refer to chapter Working with the NNP F
Résumé du contenu de la page N° 8
ÉÂÔ Installation Instructions 10.3 Log Off the MOSS-E 1. On the 3746-9x0 Menu window, click on Function, then click on Exit. 2. On the MOSS-E View window, click on Program. 3. Click on LOG OFF MOSS-E. 4. Close the front and rear doors of the controller expansion. 10.4 Returning the Machine to the Customer Inform the customer that the NNP backup is installed and operational. 11.0 Test Procedures No test required. 12.0 Field Updating None. After Installation (Steps 13-15) 13.0 Field Updating
Résumé du contenu de la page N° 9
ÉÂÔ Installation Instructions 15.1 Purchased Machines Refer to the parts ownership matrix to determine the correct owner of removed/unused parts. ¹ For EMEA/APG/AG Areas, refer to Hardware and General Service Code Description. ¹ For Domestic Areas, return parts to the customer. 16.0 Machine Records ¹ Install the new MACHINE HISTORY supplied. ¹ Report installation and quality problems using existing procedures. End of instructions. 3746 PN 42L2445 EC F52322 EC F12701A EC F70078 FFBM 9 of 10 0
Résumé du contenu de la page N° 10
ÉÂÔ Installation Instructions 3746 PN 42L2445 EC F52322 EC F12701A EC F70078 FFBM 10 of 10 09 Oct 1998 14 DEC 1998 22 APR 1999 10