Résumé du contenu de la page N° 1
OPERATOR'S MANUAL
THD SATELLITE COMPASS
SC-110
MODEL
www.furuno.co.jp
Résumé du contenu de la page N° 2
The paper used in this manual is elemental chlorine free. ・FURUNO Authorized Distributor/Dealer 9-52 Ashihara-cho, Nishinomiya, 662-8580, JAPAN Telephone : +81-(0)798-65-2111 Fax : +81-(0)798-65-4200 A : FEB. 2004 All rights reserved. Printed in Japan F : FEB. 08, 2011 Pub. No. OME-72570-F (AKMU ) SC-110 *00014854615* *00014854615* **00014854615 00014854615** * 0 0 0 1 4 8 5 4 6 1 5 *
Résumé du contenu de la page N° 3
IMPORTANT NOTICES General • The operator of this equipment must read and follow the descriptions in this manual. Wrong operation or maintenance can cancel the warranty or cause injury. • Do not copy any part of this manual without written permission from FURUNO. • If this manual is lost or worn, contact your dealer about replacement. • The contents of this manual and equipment specifications can change without notice. • The example screens (or illustrations) shown in this manual can be di
Résumé du contenu de la page N° 4
SAFETY INSTRUCTIONS The operator and installer must read the applicable safety instructions before attempting to install or operate the equipment. Indicates a potentially hazardous situation which, if not avoided, WARNING could result in death or serious injury. Indicates a potentially hazardous situation which, if not avoided, CAUTION can result in minor or moderate injury. Warning, Caution Mandatory Action Prohibitive Action Safety Instructions for the Operator Safety Instructio
Résumé du contenu de la page N° 5
TABLE OF CONTENTS FOREWORD.................................................................................................................... v SYSTEM CONFIGURATION .......................................................................................... vi EQUIPMENT LIST......................................................................................................... vii SPECIFICATIONS .................................................................................................
Résumé du contenu de la page N° 6
2.9.4 Time format ............................................................................................................ 2-15 2.9.5 Demonstration mode ............................................................................................. 2-16 2.10 WAAS/DGPS Setup .......................................................................................................... 2-17 2.11 OTHERS Menu .........................................................................................
Résumé du contenu de la page N° 7
FOREWORD A Word to the Owner of the SC-110 FURUNO Electric Company thanks you for purchasing the FURUNO SC-110 THD Satellite Compass. (Hereafter, for sake of brevity, we refer to SC-110 as Satellite Compass.) We are confident you will discover why the FURUNO name has become synonymous with quality and reliability. For over 60 years FURUNO Electric Company has enjoyed an enviable reputation for quality and reliability throughout the world. This dedication to excellence is furthered by o
Résumé du contenu de la page N° 8
SYSTEM CONFIGURATION The SC-110 consists of an antenna, a display unit and a processor unit. The tri-antenna system helps reduce the influence of ship's motion (rolling). Antenna Unit SC-1203F Display Unit SC-502 Analog pitch 6 ports for Heading or Navigation Data Processor Unit Analog roll (5 AD-10/IEC 61162 ports, 1 AD-10 port) SC-1101 Log/Heading alarm : Option (Contact) External heading data External DPGS Beacon Receiver Category of Units Processor Unit: Protected from weather 12-24 VDC
Résumé du contenu de la page N° 9
EQUIPMENT LIST Standard supply Name Type Code No. Qty Remarks GPS Antenna SC-1203F 1 Radome type Display Unit SC-502 1 Processor Unit SC-1101 1 CP20-02230* 004-378-110 TPPX cable 1 CP20-02260* 004-379-660 TNC cable CP20-02241* 004-378-200 1 For antenna unit For processor unit: Installation CP20-02600 000-041-905 1 CP20-02601*, Materials MJ-A7SPF0006-100 For display unit: CP20-02203* 004-380-660 1 Tapping screw (5X20, 4 pcs.) Spare Parts SP20-01101* 004-379-720 1 For pr
Résumé du contenu de la page N° 10
This page intentionally left blank. viii
Résumé du contenu de la page N° 11
FURUNO SC-110 SPECIFICATIONS OF SATELLITE COMPASS SC-110 1 GENERAL 1.1 Heading accuracy 0.3° RMS (95% static accuracy) 1.2 Heading resolution 0.1° 1.3 Follow-up 45°/s rate-of-turn 1.4 Settling time 4 minutes 1.5 Position accuracy 10 m, or 5 m (DGPS), 95% of the time 1.6 Heading/ Nav data output Number of port AD-10 format specialty: 1 port AD-10: 5 ports or IEC 61162-1/2: 10 ports (selected from menu) IEC 61162 format is RS-485 level Sentences ATT, GGA, GLL, GNS, HDM, HDT, HVE
Résumé du contenu de la page N° 12
FURUNO SC-110 5 COATING COLOR 5.1 Display unit Panel: N3.0, Chassis: 2.5GY5/1.5 5.2 Processor unit 2.5GY5/1.5 5.3 Antenna unit N9.5 SP - 2 E7257S01E
Résumé du contenu de la page N° 13
1 INSTALLATION 1.1 Mounting Considerations 1.1.1 Antenna unit General • Keep the length of the antenna cable in mind when selecting a mounting location. Installing the antenna above superstructures • The antenna must be mounted above all other structures on the vessel to obtain an unobstructed view of the satellites regardless of vessel heading. Failure to do so will cause shadows and multipath reflection problems. Mast SC-series Antenna Radar Antenna Bridge Example of antenna in
Résumé du contenu de la page N° 14
1. INSTALLATION • The horizontal separation between the antenna and masts must be as follows: Mast diameter Separation distance (minimum) 10 cm 1.5 m 30 cm 3 m -80 +80 SC-series Antenna Less than 10 Mast, etc. Separation degrees • Keep the length of antenna cable in mind when selecting a mounting location. The cable comes in lengths of 15 meters (standard supply), or 30 m or 50 m (optional lengths). • The field of view above the antenna should be as shown below, ±80° against z
Résumé du contenu de la page N° 15
1. INSTALLATION Location influenced Radar Antenna by reflected wave. Reception blocked by mast. SC-series Antenna Bridge Example of antenna installed below superstructures 1.1.2 Display unit, processor unit • Choose a location where vibration and shock are minimal. • Install the units well away from locations subject to rain and water splash. • Locate the units away from air conditioner vents. • Keep the units out of direct sunlight because of heat that can build up inside their ca
Résumé du contenu de la page N° 16
1. INSTALLATION 1.2 Installing the Antenna Unit Note: “Bird-repellent fixtures” may be attached to each antenna element and the center cover to prevent birds from alighting on them. If it is more convenient to attach them before fixing the antenna unit to the mounting location, do step 7 before fixing the antenna unit. 1. Prepare a post for the antenna as shown in the illustration below. φ15 Recommended Flange Gasket (Option) (supplied in installation materials) Name: Flange Type: OP20-
Résumé du contenu de la page N° 17
1. INSTALLATION 2. Fix the antenna unit to the post as shown below. 3 1 2 Fix the #1 and #2 antennas on Set the antenna the fore-and-aft line of the ship, unit to the flange. with the #2 antenna forward of the #1 antenna. Flat washer Spring washer Nut (Torque: 29.58 Nm) Fastening antenna unit to a post 1-5
Résumé du contenu de la page N° 18
1. INSTALLATION 3. Coat each nut, bolt and washer with silicone rubber for waterproofing. Coat bolt, nut and washer completely with silicone rubber. Coating bolt, nut and washer with silicone rubber 4. As shown below, make a loop in the antenna cable and fasten the antenna cable to the antenna post with two cable ties. Coat bolt threads with Three Bond. Fasten bolt with nuts and then coat nuts with Three Bond also. Coat with Three Bond 1211 (supplied). Fix antenna cable. 5. Coat bolt t
Résumé du contenu de la page N° 19
1. INSTALLATION 1.3 Installing the Processor Unit The processor unit should be mounted aligned with the ship’s fore-and-aft line. It can be mounted on the deck, bulkhead, or on the underside of a desk. Choose a mounting location which allows you to easily view the power lamp on the top of the unit and which is within ±2.5° of the ship’s fore-and-aft line. 1.3.1 Bulkhead mount The processor unit is shipped from the factory ready for bulkhead mounting. Orient the processor unit as shown
Résumé du contenu de la page N° 20
1. INSTALLATION 1.3.2 Deck mount Orient the processor unit as shown below and fix it to the mounting location with four tapping screws (M5x20). You will set the orientation later on the menu. Mount processor unit Reference Direction so reference direction is within – 2.5 of POWER switch fore-and-aft line. (power lamp) Name plate Connectors Processor Unit, top view Bow Bow Mounting Method: "Floor" Mounting Method: "Floor" (Deck) (D