TC12 Installation, Commissioning & Maintenance Handbook
SIEMENS TRAFFIC CONTROLS
Sopers Lane
POOLE
Dorset
BH17 7ER
SYSTEM: TC12
TC12
Installation, Commissioning
and Maintenance Handbook
PREPARED: A Pickering
FUNCTION: Engineer
This document is electronically held and approved in Meridian
© Siemens plc. 1997 - 2004 All rights reserved.
The information contained herein is the property of Siemens plc. and is supplie
Résumé du contenu de la page N° 2
TC12 Installation, Commissioning & Maintenance Handbook Appendix A consists of the latest issue of 667/HB/26628/000. The current issue of the following A3 drawings are included in the back of this manual: 667/CA/22741/000 667/DZ/22600/000 667/GA/22600/000 667/GA/22603/000 667/GA/22626/000 and 001 667/GA/22635/000 667/GA/22654/000 and 001 667/GA/22670/000 667/GA/22693/000 666/HE/43100/000 Page ii Issue 9
Résumé du contenu de la page N° 3
TC12 Installation, Commissioning & Maintenance Handbook SAFETY WARNING In the interests of health and safety, when using or servicing this equipment the following instructions must be noted and adhered to: Only skilled or instructed personnel with relevant technical knowledge and experience, who are also familiar with the safety procedures required when dealing with modern electrical/electronic equipment are to be allowed to use and/or work on the equipment. All work shall be perform
Résumé du contenu de la page N° 4
TC12 Installation, Commissioning & Maintenance Handbook TELECOMMUNICATIONS APPROVAL WARNING The Siemens TC12 Modems 667/1/22669/000, 667/1/22668/000 and 667/1/22668/001 and the TC12 OTU/LMU PCB Assemblies 666/1/02262/001 and 666/1/02262/021 are Approved for connection to British Telecommunications Private Circuits in a Multipoint or Point to Point configuration as defined in BS6328: Part 1: 1982, subject to the conditions set out in the instructions for use. TC12 Modems TC12 OTU/
Résumé du contenu de la page N° 5
TC12 Installation, Commissioning & Maintenance Handbook This Handbook must be supplied with the apparatus. Validity of the approval depends on this information being supplied including the User Guide in the General Handbook 666/HB/43100/000. 666/HE/43100/000 Page v Issue 9
Résumé du contenu de la page N° 6
TC12 Installation, Commissioning & Maintenance Handbook TABLE OF CONTENTS 1 INTRODUCTION ................................................................................................. 1 1.1 PURPOSE ........................................................................................................... 1 1.2 SCOPE ................................................................................................................ 1 1.3 RELATED DOCUMENTS ....................................
Résumé du contenu de la page N° 7
TC12 Installation, Commissioning & Maintenance Handbook 2.4.11 Digital Output PCB ......................................................................................... 61 2.4.12 Recommended Spares................................................................................... 61 3 TC12 OUTSTATION.......................................................................................... 62 3.1 SPECIFICATION ...............................................................................
Résumé du contenu de la page N° 8
TC12 Installation, Commissioning & Maintenance Handbook 4.3 OVERVIEW OF THE TC12 INSTATION TEST SET SETTINGS/SELECTIONS AND CONNECTIONS................................................................................................. 139 4.3.1 Introduction .................................................................................................. 139 4.3.2 Connection to Unit Under Test ..................................................................... 139 4.3.3 Front Panel Switche
Résumé du contenu de la page N° 9
TC12 Installation, Commissioning & Maintenance Handbook 6.3.1 General ........................................................................................................ 167 6.3.2 Configuring the Integral OTU PCB ............................................................... 167 6.3.3 Connectors and Cables................................................................................ 170 6.3.4 Lamp Monitor Unit - Number of Current and Voltage Sensors ..................... 176 6.4 CO
Résumé du contenu de la page N° 10
TC12 Installation, Commissioning & Maintenance Handbook FIGURE 29 - PHASES IN STAGES FOR EXAMPLE 6.............................................. 125 FIGURE 30 - OUTSTATION PCB STATUS LEDS ..................................................... 131 FIGURE 31 - OUTSTATION PSU VOLTAGE CHECKS............................................. 134 FIGURE 32 - OUTSTATION TEST SET FRONT PANEL........................................... 157 FIGURE 33 - OUTSTATION TEST SET CONNECTIONS ......................
Résumé du contenu de la page N° 11
TC12 Installation, Commissioning & Maintenance Handbook 1 INTRODUCTION 1.1 PURPOSE This document is a guide for professional Installation and Maintenance personnel. It describes how to install, commission and maintain the TC12 Instation and Outstation. 1.2 SCOPE Section 2 covers the Instation cabinet and all the equipment contained within the TC12 Instation. Section 3 covers all equipment associated with the TC12 Outstation. Sections 4 and 5 describe the Instation and Outstation test
Résumé du contenu de la page N° 12
TC12 Installation, Commissioning & Maintenance Handbook 1.5 ISSUE STATE AND AMENDMENTS Issue 1 - First formal issue Issue 2 - Significant changes this issue are listed below: Table 3 and Table 6 Modem PCB and OTU PCB Receive threshold switch settings for –39 dBm and –33 dBm were reversed in issue 1. Instation recommended spares, PSU PCB and PSU added. Modem PCB, Transformer PCB and OTU PCB all have covers - the part numbers have been corrected. Section 5 Outstation Test Set - connect
Résumé du contenu de la page N° 13
TC12 Installation, Commissioning & Maintenance Handbook Example of lamp monitoring on a more complex junction added. Drawing of OTU input, and reply bytes added. Replacement current sensor part number added. (667/7/25171/000) • Replacement voltage monitoring transformer part number added. (667/7/25172/000) Issue 4 - Significant changes for this issue listed below. • Handbook converted to Word v6. • 667/HB/26628/000 OTU Serial Environmental Monitor handbook added. • Remote Handset det
Résumé du contenu de la page N° 14
TC12 Installation, Commissioning & Maintenance Handbook • Equipment is CE marked and self-certified to RTE Directive 99/5/CE R&TTE. BABT approval no longer appropriate. References to BABT removed throughout document. • Clarification to battery change procedures, sections 3.4.5 and 6.5.4. • Instation Power Supply replacement procedure added to section 2.4.10. • General updates to formatting and spelling. • Preface removed, since the information it gave is available from the table of cont
Résumé du contenu de la page N° 15
TC12 Installation, Commissioning & Maintenance Handbook The Outstation test set is used in place of the controller to both set Reply bits and monitor Control bits at the OTU. 666/HE/43100/000 Page 5 Issue 9
Résumé du contenu de la page N° 16
TC12 Installation, Commissioning & Maintenance Handbook Instation The Instation comprises of one or more Traffic control computers (TCC) and one or more Instation Transmission Units (ITUs). The ITU cabinets are 32U high with grey panelling and a smoked glass front door. Traffic Control Computer The TCC is a system containing a minimum of one machine and one PC per ITU cabinet. The UTC TCC system communicates with the PC(s) via an Ethernet link. More than one UTC TCC will be used sho
Résumé du contenu de la page N° 17
TC12 Installation, Commissioning & Maintenance Handbook Digital Output Rack The Digital output rack contains one Instation rack Power Supply Card and between one and sixteen Digital Output boards, each capable of driving 64 LEDs at up to 30 V 25 mA. There are two variants of Digital Output board, one sources current and the other sinks current. The system could be used for any application requiring digital output, not just wallmap driving. Instation Test Set The Instation Test Set (
Résumé du contenu de la page N° 18
TC12 Installation, Commissioning & Maintenance Handbook Figure 1 - System Diagram for Digital Output Rack connection to a Wall Map 666/HE/43100/000 Page 8 Issue 9
Résumé du contenu de la page N° 19
TC12 Installation, Commissioning & Maintenance Handbook Figure 2 - System Connection for two ITU Racks 666/HE/43100/000 Page 9 Issue 9
Résumé du contenu de la page N° 20
TC12 Installation, Commissioning & Maintenance Handbook 2 TC12 INSTATION 2.1 SPECIFICATION 2.1.1 Mains voltage ranges The Instation will work over: 98 – 132 V RMS 198 – 264 V RMS Note. The voltage range of the PC used in the Instation should be checked in the manufacturer's literature and note should be taken of any links/switches that need setting for different voltage ranges. 2.1.2 Mains frequency range All TC12 equipment will work from 47 Hz to 63 Hz 2.1.3 Mains current