Resumen del contenido incluido en la página 1
®
Intel RAID Smart Battery
AXXRSBBU6
User’s Guide
Order Number: E33722-001
Resumen del contenido incluido en la página 2
Warranty Notice: Adding a battery on an Intel RAID controller will limit the warranty of this product. Returns determined to be caused by battery installation damage, stripped screws, or other damage resulting from the battery installation will not be covered. ESD damage to the board will also not be covered by the warranty. The warranty on the AXXRSBBU6 is 1 year. Disclaimer ® Information in this document is provided in connection with Intel pro
Resumen del contenido incluido en la página 3
Contents List of Figures..................................................................................................... iv List of Tables ...................................................................................................... iv ® About the Intel RAID Smart Battery...................................................................i Installing the AXXRSBBU6................................................................................. 3 Important Pre-installation C
Resumen del contenido incluido en la página 4
List of Figures Figure 1. Top and Bottom View of the AXXRSBBU6...................................................................3 ® Figure 2. Battery alignment on the add-in Intel RAID Controllers ..............................................5 Figure 3. Battery board mounting on RAID controller board........................................................5 Figure 4. Reinserting an add-in RAID Controller .........................................................................6 Figur
Resumen del contenido incluido en la página 5
® About the Intel RAID Smart Battery ® ® Intel RAID Controllers and Intel Integrated Server RAID Modules provide reliability, high performance, and fault-tolerant disk subsystem management. A complete fault-tolerant strategy requires protection for all data, including the unwritten cached data in the RAM cache. If power is lost, the data in RAM is lost. To avoid this data loss, a battery can be added to supply power to the RAID RAM during an AC power outage or if the AC power cord is rem
Resumen del contenido incluido en la página 6
Important Safety Instructions Read all caution and safety statements in this document before performing any of the instructions. See Intel Server Boards and Server Chassis Safety Information at http://support.intel.com/support/motherboards/server/sb/cs-010770.htm. Wichtige Sicherheitshinweise Lesen Sie zunächst sämtliche Warn- und Sicherheitshinweise in diesem Dokument, bevor Sie eine der Anweisungen ausführen. Beachten Sie hierzu auch die Sicherheitshinweise zu Intel- Serverplatinen un
Resumen del contenido incluido en la página 7
Installing the AXXRSBBU6 Figure 1 displays the top and bottom views of the AXXRSBBU6. The battery pack is mounted on a daughtercard which mounts to the RAID controller. Take note of the location of the J2 connector ® (5) which plugs into the Intel RAID Controller and the 3 standoffs (2) and 6 screws (3). Only the top side of the daughtercard will be visible after installation onto the RAID controller. Figure 1. Top and Bottom View of the AXXRSBBU6 1. J4 battery pack harness conn
Resumen del contenido incluido en la página 8
Important Pre-installation Considerations Warning: Always ground yourself and/or use a ground strap before touching the RAID controller or the RSBBU. Perform all installation work at an ESD-safe workstation. Use an ESD-safe Phillips screwdriver set to a maximum torque of 2.25 inch pounds, and be sure the screwdriver is centered in the screw to avoid damaging the screw head. If you exceed the maximum torque specification, you may damage the board, connectors, or screws, and you will void t
Resumen del contenido incluido en la página 9
4. Remove the protective metal cover from the battery connector on the RAID controller ® ® card. (J10 on the Intel SRCSASBB8I and Intel SRCSASLS4I.) ® ® 5. On the Intel RAID Controller SRCSASBB8I and the Intel RAID Controller SRCSASLS4I, place the RAID controller with the components facing up. ® Figure 2. Battery alignment on the add-in Intel RAID Controllers 6. Hold the AXXRSBBU6 so that the battery side is up and the three screw holes align. Figure 3. Battery board mounting o
Resumen del contenido incluido en la página 10
Caution: Center the screwdriver carefully to avoid stripping the screwhead. Do not over-tighten the screws. The maximum recommended torque is 2.25 inch pounds. ® C. Place the Intel RAID Controller back into the server 1. Align the RAID controller with the PCI Express* slot. 2. Press down gently, but firmly, to ensure that the RAID controller is properly seated in the slot. The bottom edge of the RAID controller must be flush with the slot. Caution: Never apply pressure to the AXXRSBB
Resumen del contenido incluido en la página 11
Monitoring Battery Backup Multiple utilities are available to display and configure BBU information including recharge count. When you replace a BBU, you should reset this counter to zero. Intel recommends that you replace the BBU once per year or after 500 recharge cycles, whichever comes first. Note: This chapter describes only the BBU-related features of the Intel utility programs. For ® complete information on these utilities, see the Intel RAID Software User’s Guide. Monitoring
Resumen del contenido incluido en la página 12
Most of the Battery Module properties are view-only. In the lower right panel of the RAID BIOS Console there are two properties that can be changed. (Intel recommends that you leave these properties at their default settings.) • Learn Delay Interval – default 30 days • Auto Learn Mode – default Auto Note: The learning cycle is a battery calibration operation performed by the controller periodically to determine the condition of the battery. ® Using Intel RAID Web Console 2 ® The stat
Resumen del contenido incluido en la página 13
• The current BBU temperature, voltage, current, and remaining capacity • The estimated time until the battery is fully charged (only if the battery is charging) Replacing Battery Backup Units Intel recommends that you replace BBUs once a year or after 500 recharging cycles, whichever comes first. The warranty on the battery pack is for one year. After you install a new BBU, use one of the Intel configuration utilities to reset the battery recharge cycle counter to zero. For instructio
Resumen del contenido incluido en la página 14
Battery Backup Unit Specifications Table 1. Battery Backup Unit Specifications Battery Technology LiON (Lithium ION) 1 cell 10–45°C ambient temperature Battery Operating Environment 20% to 80% humidity non-condensing Depends on storage time,:< 30 days: 0–50 °C Battery Storage Temperature 30–90 days: 0–40 °C ‘; > 90 days: 0–30 °C Fast Charge Current 500mAH using charge circuitry card Battery Voltage Nominal OCV: 3.7 V Mechanical 2.611 inches x 2.122 inches Battery Capacity