Resumen del contenido incluido en la página 1
TB3/TB6 Series
Including: TB3; TB3-LP;
TB3Q; TB3Q-LP; TB6; TB6Q
STARTING WITH SERIAL NUMBER: TU00020000
INSTALLATION & OPERATING MANUAL
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
To ensure you have the latest revision of the Operating Manual, or to view the Illustrated Parts
Catalog, Programming Manual, or Service Manual, please visit the Bunn-O-Matic website, at
www.bunn.com. This is absolutely FREE, and the
Resumen del contenido incluido en la página 2
BUNN-O-MATIC COMMERCIAL PRODUCT WARRANTY Bunn-O-Matic Corp. (“BUNN”) warrants equipment manufactured by it as follows: 1) Airpots, thermal carafes, decanters, GPR servers, iced tea/coffee dispensers, MCP/MCA pod brewers thermal servers and Thermofresh servers (mechanical and digital)- 1 year parts and 1 year labor. 2) All other equipment - 2 years parts and 1 year labor plus added warranties as specified below: a) Electronic circuit and/or control boards - parts and labor for 3 years. b) C
Resumen del contenido incluido en la página 3
h t i w T d d i F o e E v n L a g i l o a t e . d s d n l i l a i s p d T s e F r t e a E t t L a o r w e s h d i t l n e n a o n s n r n u e r F s u n b e e r l p u a s i s t i D n e e k t a a o e M p T INTRODUCTION This equipment will brew a three-gallon batch of fresh tea into an awaiting dispenser. The tea will be dispensed at approximately room tempe
Resumen del contenido incluido en la página 4
ELECTRICAL REQUIREMENTS CAUTION - The brewer must be disconnected from the power source until specified in Initial Set-Up. 120V model brewers require 2-wire, grounded service rated 120 volts ac, 15 amp, single phase, 60 Hz. "A" model brewers require 2-wire, grounded service rated 220-240 volts ac, 10 amp, single phase, 50 Hz. "B" model brewers require 2-wire, grounded service rated 100 volts ac, 15 amp, single phase, 60 Hz. WARNING - If the power cord is ever damaged, it must be replaced by th
Resumen del contenido incluido en la página 5
PLUMBING REQUIREMENTS As directed in the International Plumbing Code of the International Code Council and the Food Code Manual of the Food and Drug Administration (FDA), this equipment must be installed with adequate backflow pre- vention to comply with federal, state and local codes. For models installed outside the U.S.A., you must comply with the applicable Plumbing /Sanitation Code for your area. 120V MODELS These brewers must be connected to a cold water system with a minimum 1.0 gpm flo
Resumen del contenido incluido en la página 6
INITIAL SET-UP (TB3Q/TB3Q-LP/TB6Q ONLY) CAUTION - The brewer must be disconnected from the power source throughout the Initial Set-Up, except when specified in the instructions. 1. Remove the top cover from the brewer. 2. Rotate the control thermostat knob fully counterclockwise to the "OFF" position and replace the top lid. 3. Insert an empty funnel into the funnel rails. On TB6Q models, rotate the funnel handle left or right to align the funnel discharge over the reservoir. 4. Place an empty
Resumen del contenido incluido en la página 7
INITIAL SET-UP (TB3/TB3-LP/TB6 ONLY) CAUTION - The brewer must be disconnected from the power source throughout the initial set-up, except when specified in the instructions. 1. Remove the top lid from the brewer. 2. Rotate the control thermostat knob fully counterclockwise to the "OFF" position and replace the top lid. 3. Set the delay dial on the timer at three minutes and set the dilution dial at three to four minutes. 4. Remove the metal discharge tip from the funnel to speed up the set-up
Resumen del contenido incluido en la página 8
AUTO SWEETENER SET-UP CAUTION - The brewer must be disconnected from the power source throughout the Initial Set-Up, except when specified in the instructions. 1. Remove the top lid and both rear panels. 2. Make sure the brewer water supply is off. 3. Connect sweetener hose from the bag in a box delivery system to the rear fitting marked "Sweetener" . IMPORTANT - System delivery pressure must be regulated between 30-40 psi. System also needs to deliver product for at least 4 minutes without s
Resumen del contenido incluido en la página 9
ADJUSTING BREW VOLUMES NOTE: Check that the brewer is connected to water supply, the tank is properly filled, and a funnel and server are in place, prior to setting or modifying batch sizes. 1. To adjust concentrate volume on TB3/TB6 models, and dilution volume on TB3Q/TB6Q models: Modifying batch sizes. To modify a batch volume, first check that the SET/LOCK switch is in the “SET” position on the circuit board. If the brewer has a batch selector switch, position it to the size to be chang
Resumen del contenido incluido en la página 10
OPERATING CONTROLS A. ON/OFF Switch ON - Placing the switch in the left position allows the start switch to activate a timed brew cycle for three gallons of tea. OFF - Placing the switch in the right position stops the brew cycle. Stopping a brew cycle after it has been started will not stop the flow of water into the funnel until the tank siphons down to its proper level. The switch should always be placed in this position after a brew cycle and whenever the brewer is unattended. B. UNSWEE
Resumen del contenido incluido en la página 11
CLEANING CAUTION - CLEAN AND SANITIZE YOUR ICED TEA BREWER DAILY DAILY: 1. Remove, disassemble and thoroughly clean and sanitize the entire brew funnel. The funnel tip and screen must be free from any tea particles or residue. Reassemble the funnel. 2. Place the ON/OFF switch in the "OFF" position. Remove and thoroughly rinse the sprayhead. The holes must be open and clear of any mineral deposits. Wipe the sprayhead panel clean with a damp cloth. 3. Insert the deliming spring into the spra