Resumen del contenido incluido en la página 1
5L20
Congratulations and thank you for purchasing a Rubbermaid storage building.
BEFORE YOU BEGIN – BUILDING CODES
Be sure to check your local building codes, ordinances and restrictions, and applicable neighborhood governances.
BEFORE YOU BEGIN – SURFACE PREPARATION
To ensure proper assembly and performance your shed needs to be built on a solid, level surface.
A concrete or patio surface, or a treated-wood platform is recommended.
BEFORE YOU BEGIN – LOCATION
When choosing a location in yo
Resumen del contenido incluido en la página 2
M J RB RB D F C G E H L K Qx15 B A X T FFx4 Description Part Number Assembly Letter Quantity Required Tools Two Person Assembly Front Floor 5L01 A 1 Safety 5L20 Glasses Repeat Floor 5L11 B 1 Repeat Left Side 5L12 C 1 Gloves Left Back 5L04 D 1 E Repeat Right Side 5L13 1 Right Back 5L05 F 1 Utility Knife Front Left Side 5L02 G 1 Front Right Side 5L03 H 1 Rubber Mallet 76 ¾" Wall Connector 5H75 Q 15 Left Door 5L06 / 5L41 L 1 Phillips Screwdriver Right Door 5L07 / 5L42 K 1 Do
Resumen del contenido incluido en la página 3
CAUTIONS CARE & USE • Shed can be cleaned with water and mild detergent as CAUTION: Always use gloves when using a utility knife. necessary. DO NOT USE ABRASIVE DETERGENTS, CAUTION: Always use eye protection/safety glasses MATERIALS OR CLEANING TOOLS. during assembly. • To maximize your shed’s performance, remove CAUTION: When installing screws, do not overtighten. excessive snow and/or leaf accumulation from the roof. CAUTION: Drill only through initial panel wall, unless • In the event
Resumen del contenido incluido en la página 4
2.0 Floor Installation Using a utility knife, cut the long side of each wall slot b. tab and then use a rubber mallet and screwdriver to B knock it completely out: A • 4 places on Front Floor (A) • 8 places on Repeat Floor (B) Using a rubber mallet and a. screwdriver, punch out the screw holes along B the connection edge 1. of Repeat Floor (B). 2. A B Using a rubber mallet and screwdriver, knock out the Drill pilot hole through top surface of floor, 2 places on c. d. tabs for the door
Resumen del contenido incluido en la página 5
2.1 Floor Installation Connect and align Repeat Floor (B) to Front Floor (A) and install Screws (AA) a. 9 places; keep panels aligned and even while installing screws. HELPFUL HINT: Pilot holes may be drilled for the screws using a 1/8" drill bit. CAUTION: Do not overtighten screws. AA (9) B A 3.0 Wall Panel C Installation Using a screwdriver, punch out the screw holes on the a. top of Repeat Left Side (C) 2 places. Screw Holes C C
Resumen del contenido incluido en la página 6
Snap Repeat Left Side (C) into the back position of Hold Repeat Left Side (C) upright to prevent it from b. c. Repeat Floor (B). falling (until Left Back (D) is installed). C C click ALIGN ALIGN 3.1 Wall Panel D Installation Using a screwdriver, punch out the screw holes on the a. top of Left Back (D) 4 places. Screw Holes D D
Resumen del contenido incluido en la página 7
Connect Left Back (D) into dovetails of Repeat Left Side (C). Engage snaps on bottom of Left Back (D) into b. c. Repeat Floor (B). HELPFUL HINT: Lubricate dovetails with liquid soap. D D D C 1 DETAIL 3-3_E OVERHEAD VIEW SCALE 1/1 2 1 DETAIL 3-1_B C DETAIL 3-3_B click SCALE 1/1 SCALE 1/1 2 B ALIGN ALIGN 3.2 Wall Panel E Installation Using a screwdriver, punch out the screw holes on the a. top of Repeat Right Side (E) 2 places. DETAIL 3-4_B AND 3-5_B DETAIL 3-6_B AND 3-7_B SCALE 1/1 S
Resumen del contenido incluido en la página 8
Snap Repeat Right Side (E) into the back position of Hold Repeat Right Side (E) upright to prevent it from b. c. Repeat Floor (B). falling (until Right Back (F) is installed). E ALIGN ALIGN click click 3.3 Wall Panel F Installation Using a screwdriver, punch out the screw holes on the a. top of Right Back (F) 4 places. Screw Holes F F
Resumen del contenido incluido en la página 9
Connect Right Back (F) onto dovetails of Repeat Right Engage snaps on bottom of Right Back (F) into b. c. Side (E). Repeat Floor (B). Align the lap joint between Left Back (D) and Right Back (F). HELPFUL HINT: Lubricate dovetails with liquid soap. F F 1 D F Align Lap Joints E 2 OVERHEAD VIEWS DETAIL 3-3_E DETAIL 3-3_E SCALE F 1/1 SCALE 1/1 DETAIL 3-1_B DETAIL 3-3_B DETAIL 3-1_B SCALE 1/1 DETAIL 3-3_B SCALE 1/1 SCALE 1/1 1 SCALE 1/1 click E 2 ALIGN Install Wall Connector (Q) 5 plac
Resumen del contenido incluido en la página 10
3.4 Wall Panel G Installation Using a screwdriver, punch out the screw holes on the a. top of Front Left Side (G) 2 places. Screw Holes G G DETAIL 3-3_E SCALE 1/1 DETAIL 3-1_B DETAIL 3-3_B SCALE 1/1 SCALE 1/1 Align the lap joint between Repeat Left Side (C) and Drill a pilot hole (using 1/8" drill bit) in front lower corner c. b. Front Left Side (G). at location indicated by screw target. Note: This pilot hole is to be drilled through both walls. C G G G OVERHEAD VIEW C 1 DETAIL 3-4_B
Resumen del contenido incluido en la página 11
Snap Front Left Side (G) into Front Floor (A). Install Wall Connector (Q) 5 places, connecting Repeat Left d. e. Side (C) and Front Left Side (G). Position connectors in slots and slide down to snap in place. G C 1 G 2 OVERHEAD VIEW G click Q 2 ALIGN ALIGN click 3.5 Wall Panel H Installation Using a screwdriver, punch out the screw holes on the a. top of the Front Right Side (H) 2 places. Screw Holes H H 1 1
Resumen del contenido incluido en la página 12
DETAIL 3-3_E SCALE 1/1 DETAIL 3-1_B DETAIL 3-3_B SCALE 1/1 SCALE 1/1 Drill a pilot hole (using 1/8" drill bit) in front lower corner Align the lap joint between Front Right Side (H) and b. c. at location indicated by screw target. Repeat Right Side (E). Note: This pilot hole is to be drilled through both walls. E H H H OVERHEAD VIEW 1 E DETAIL 3-4_B AND 3-5_B DETAIL 3-6_B AND 3-7_B 2 SCALE 1/1 SCALE 1/1 Install Wall Connector (Q) 5 places, connecting Snap Front Right Side (H) into Fron
Resumen del contenido incluido en la página 13
4.0 Roof Panel M (back position) Installation Install one Repeat Roof (M) onto back section. The overlap edge of roof points toward the back of the shed. a. Align tongues on top of back wall to the outside of the roof panel overlap. Align tongues on top of side walls into grooves in roof. M RB Slightly raise front edge of roof enough to allow positioning of Roof Brace (RB) onto the side walls as shown. b. Lower the roof onto the walls and align Roof Brace (RB) into pocket in Repeat Roof (M).
Resumen del contenido incluido en la página 14
Ensure Repeat Roof (M) is positioned against the back wall tongues. AA (8) c. From outside the shed, install one Screw (AA) at each corner. Hold the edge of the roof down firmly at the corners while installing each screw. Install remaining screws into remaining locations of back walls. Helpful Hint: Installation is easier using a magnetic bit or starting 1. 2. screws with a manual screwdriver to get seated. Pilot holes also may be drilled using 1/8" bit. M 3. From inside the shed, install f
Resumen del contenido incluido en la página 15
4.2 Roof Panel J (front position) & Door Installation Install one Front Roof (J) onto front section: roof gable edge toward front of shed. a. Align tongues on top of side walls into grooves in roof. J RB Slightly raise front edge of roof enough to allow positioning of Roof Brace (RB) onto the side walls as shown. b. Lower the roof onto the walls and align Roof Brace (RB) into pocket in Front Roof (J). J RB
Resumen del contenido incluido en la página 16
Make sure Front Roof (J) is positioned tightly against the middle Repeat Roof (M) section. c. Install Roof Pins (FF) in four places. If necessary, use Roof Pin Assembly Tool (GG) to pull the roof down. 1. Insert pin in slot. 3. Rotate head flush with roof. 2. Push all the way through. click FF FF FF GG Install Roof Pins four places. Install Left Door (L) and Right Door (K) into hinge openings From inside the shed, install four Screws (AA) into the roof, d. e. of Front Floor (A) and hinge socke
Resumen del contenido incluido en la página 17
5.0 Finishing Installation Install Screws (AA) into 8 locations shown at bottom of wall panels to secure walls to floor. AA (8) a. HELPFUL HINT: Pilot holes may be drilled for the screws. CAUTION: Do not overtighten screws. 5.1 Door Finishing Installation Install Lock Hasp (X) into opening on Right Door (K). Install Door Handle (T) onto Left Door (L) using four a. b. Screws (AA). AA (4) T K click L X
Resumen del contenido incluido en la página 18
MAINTENANCE & SAFETY • Periodically check shed to assure it remains stable and the site remains level. • In areas of high winds it is recommended to anchor shed to platform or ground by holes in floor at designated location and secure with the proper fasteners (not included). • Wash shed with garden hose or a mild detergent solution. Using an abrasive cleaner could damage your shed. 76 ¾" • Hot items such as recently used grills or fire pits should not be stored in the build