Copyright, Notices, and Trademarks Printed in U.S.A. – © Copyright 1999 by Honeywell Inc. Revision 1– 7/99 While this information is presented in good faith and believed to be accurate, Honeywell disclaims the implied warranties of merchantability and fitness for a particular purpose and makes no express warranties except as may be stated in its written agreement with and for its customer. In no event is Honeywell liable to anyone for any indirect, special or consequential damages. The informati
Resumen del contenido incluido en la página 3
About This Document Abstract The purpose of this document is to support the installation operation and maintenance of the 4909 CPVC Conductivity Cell Removal/Insertion Assembly. Revision Notes The following list provides notes concerning all revisions of this document. Rev. ID Date Notes 0 11/96 This revision is the initial release of the Honeywell version of the L&N manual p/n 277731 Rev. E1. There were no major changes to the L&N version when it was Honeywellized. 1 6/99 Edits were made to st
Resumen del contenido incluido en la página 4
Organization Telephone Address Honeywell TAC 1-800-243-9883 Voice 1100 Virginia Drive Fort Washington, PA 19034 iv 4909 CPVC Conductivity Cell Insertion/Removal Assembly– Operations Manual 7/99
Resumen del contenido incluido en la página 5
Contents 1. INTRODUCTION....................................................................................................1 1.1 Overview.........................................................................................................................................1 1.2 4908 Conductivity Cell...................................................................................................................1 1.3 31074357 Removal Device....................................................
Resumen del contenido incluido en la página 6
4. MAINTENANCE AND REPLACEMENT PARTS .................................................17 4.1 To Clean The Cell.........................................................................................................................17 4.2 Replacing Removal Device Parts..................................................................................................17 Ball Valve.........................................................................................................................
Resumen del contenido incluido en la página 7
Tables Table 4-1 Replacement Parts __________________________________________________________ 18 Table 4-2 Voltage and Time Limits for Platinizing Cells ____________________________________ 18 Figures Figure 1-1 Temperature/Pressure* Range__________________________________________________ 2 Figure 1-2 4909 CPVC Conductivity Cell Insertion/Removal Assembly with Conductivity Cell Installed3 Figure 1-3 4909 CPVC Conductivity Cell Insertion/Removal Assembly with Universal Head_________ 3 Figure 1
Resumen del contenido incluido en la página 8
Resumen del contenido incluido en la página 9
Introduction 1. Introduction 1.1 Overview The 4909 Conductivity Cell Insertion/Removal Assembly is designed for use in a pipeline or closed vessel where it is desirable to remove the cell for inspection and maintenance without shutting down the system and releasing the pressure. The assembly comprises a 4908 Conductivity Cell and a 31074357 Removal Device which are shown assembled in Figs. 1-2 and 1-3. It is to be used in applications for which maximum pressure does not exceed 125 psig, and ca
Resumen del contenido incluido en la página 10
4909 CPVC Conductivity Cell Insertion/Removal Assembly Operations Manual 1.3 31074357 Removal Device This device consists of a ball valve which is connected to the closed system by a 1-1/2 inch CPVC schedule 80 mounting nipple and to a housing by a 6 inch long schedule 80 CPVC nipple into which the support tube for the cell mounting is inserted. The compression handle provides a seal around the cell support tube. Depending on the Key Number selected in Section 2.2, MSG, the 31074357 Removal De
Resumen del contenido incluido en la página 11
Introduction Valve 1/4" NPT Plug Conductivity Cell Compression Handle Purge Port Support Grip Cable 6" Nipple Cable Grip 1-1/2" NPT Nipple Housing Adapter (Contains Automatic Temperature Compensator when Specified) a/n 23350 Figure 1-2 4909 CPVC Conductivity Cell Insertion/Removal Assembly with Conductivity Cell Installed Universal Head Assembly a/n 23351 Figure 1-3 4909 CPVC Conductivity Cell Insertion/Removal Assembly with Universal Head 7/99 4909 CPVC Conductivity Cell Insertion/Removal Asse
Resumen del contenido incluido en la página 12
4909 CPVC Conductivity Cell Insertion/Removal Assembly Operations Manual Conductivity Cell Cable Adapter * * Automatic Temperature Compensator, when specified by catalog number, is mounted inside adapter. a/n 23352 Figure 1-4 4908 Conductivity Cell Note: Apply a thin film of Silicone grease to all surfaces of bushing and to Do not nick diameter of support tube as shown. outside of Apply grease support tube (See Note above) Modify per sketch* Tighten securely to pipe Apply teflon tape to Th
Resumen del contenido incluido en la página 13
ON V C DUCTI ITY CELL Introduction Set Screw #6-32 Binding Head Terminal Screw & Board Gasket Base Washer Assembly Nipple (3/4" NPT) Cap #6-32 Screw D A B C Chain #6-32 Screw View of Base with Cap Removed Wire a/n 23354 Figure 1-6 Universal Head 7/99 4909 CPVC Conductivity Cell Insertion/Removal Assembly– Operations Manual 5
Resumen del contenido incluido en la página 14
4909 CPVC Conductivity Cell Insertion/Removal Assembly Operations Manual 6 4909 CPVC Conductivity Cell Insertion/Removal Assembly– Operations Manual 7/99
Resumen del contenido incluido en la página 15
Specifications and Model Selection Guide 2. Specifications and Model Selection Guide 2.1 Specifications Cell Constants -1 0.01, 0.1,1.0, 5, 10, 20, 25 and 50 cm . Electrode Material Nickel or Platinum, as specified. Wetted Parts Cell Body: Polyethersulfone (PES). Electrodes: See above. Mounting Materials: Chlorinated Polyvinyl Chloride (CPVC). Internal Sealing Materials: Viton, Teflon & EPDM Pressure and Temperature (See Fig. 1-1) 125 psig (862 kPa) max. @ 23°F (-5°C) 90 psig (621 kPa) max. @
Resumen del contenido incluido en la página 16
4909 CPVC Conductivity Cell Insertion/Removal Assembly Operations Manual Integral Automatic Temperature Compensation Refer to Section 2.2 – Model Selection Guide Leadwire Tefzel covered, 18-gage cable (7 feet, 20 feet, or Universal Head, as specified). Weight Approximately 3.5 lb (1.6 Kg) (including cell). 2.2 Model Selection Guide KEY NUMBER Selection Availability Description 04909 Complete Conductivity Cell Assembly 04909 (Note 2) (Note 3) 04908 Replacement Cell Only (Note 1) (Note 3) 04908 TA
Resumen del contenido incluido en la página 17
Specifications and Model Selection Guide 049 TABLE IV Selection 09 08 Leadwire Length ’7 ft. Leadwire X7 20 ft. Leadwire 20 Junction Head (Aluminum) X1 TABLE V Valve/Cell Material Material 4909 Stainless Steel (SS) Valve Includes SS Valve assembly and 02 c Assembly Standard insertion cell 4908 PES Replacement Cell for Standard insertion cell only 02 c 4909 SS Valve Assembly 4909 CPVC Valve Assembly Includes CPVC assembly and 03 d standard CPVC Support tube (15 3/8") and cell 4908 PES Replacemen
Resumen del contenido incluido en la página 18
4909 CPVC Conductivity Cell Insertion/Removal Assembly Operations Manual 049 TABLE VII - OPTIONS Tagging None 0_ Linen L_ S_ Stainless Steel Certificate of Calibration No _ 0 _ 1 Yes Notes: 1. Replacement cells only, caution look at Restrictions for insertion depth dimensions based on valve assembly type. 2. When converting from 4806 to 4909, order 4908 directly. Replacement 4908 cells for existing 4908’s and 4909’s manufactured before 8/85 must specify Table V = 02. 3. 4. This option is applica
Resumen del contenido incluido en la página 19
Installation 3. Installation 3.1 Requirements To insure that a representative sample is being measured at all times, the solution must move through and completely purge out the cell channels or guard tube. If the measurement is made in a rapidly moving liquid, the existing circulation of the solution can be utilized by mounting the assembly as described in the next section so that the flow of the solution forces liquid through the cell. However, when measurements are to be made in quiescent so
Resumen del contenido incluido en la página 20
4909 CPVC Conductivity Cell Insertion/Removal Assembly Operations Manual Allow at least 1/2 inch clearance beyond the end of the cell and 1/8 to 3/16 inch radius clearance surrounding the cell to permit circulation of the solution. Avoid locations where excessive temperature changes may occur. Allow clearance behind the support grip to permit removal of the cell per dimensions in Fig. 3-1 or 3-2. Locate the insertion/removal assembly on the pressure side of pumps; not the vacuum side. Avoid loc