Resumen del contenido incluido en la página 1
DO NOT
DISCARD
R
Portland
Tested and
O-T O-T L
Listed by Oregon USA
C US
OMNI-Test Laboratories, Inc.
TOPAZ
DIRECT VENT ROOM HEATER
Owner’s Manual
Installation and Operation
Model:
839-1290
839-1320
839-1340
TOPAZ-D-CSB
Quartet Front
Solitaire Front
CAUTION
DO NOT DISCARD THIS MANUAL
• Read, understand and
• Important operating and • Leave this manual with
follow these instructions
maintenance instructions party responsible for use
included. for safe installation and
and operation.
oper
Resumen del contenido incluido en la página 2
and Welcome to the Quadra-Fire Family! Hearth & Home Technologies welcomes you to our tradition of our stoves, inserts and fi replaces. And yet we are old- of excellence! In choosing a Quadra-Fire appliance, you fashioned when it comes to craftsmanship. Each appliance have our assurance of commitment to quality, durability, is meticulously fabricated and gold and nickel surfaces are and performance. hand-fi nished for lasting beauty and enjoyment. Our pledge to quality is completed as ea
Resumen del contenido incluido en la página 3
- TABLE OF CONTENTS - Section 7: Electrical Information Section 1: Listing and Code Approvals A. Recommendation for Wire ..................27 A. Appliance Certifi cations ......................4 B. Connecting to the Appliance ...............27 B. Glass Specifi cations ............................4 C. Standing Pilot Ignition System Wiring ..27 C. BTU Specifi cations ..............................4 D. High Altitude Installations ....................4 E. Non-Combustible Materials .............
Resumen del contenido incluido en la página 4
Listing and Code Approvals 1 C. BTU Specifi cations A. Appliance Certifi cation Maximum Minimum Orifi ce *Effi ciency **P.4 MODEL: Topaz Model Input BTU Input Size Up To % (US or Canada) BTU LABORA- OMNI Test Laboratories, Inc. TORY: Topaz (NG) 061-S-24-5 39,500 26,500 .125 85 63 TYPE: Direct Vent Gas Heater Topaz (LP) 38,000 30,500 .073 85 64 * Thermal effi ciency maximum pipe with blower on. STANDARD: ANSI Z21.88a-2000 ּCSA 2.33a-M00 ּ ** Canada minimum pipe. UL307b ּCAN/CBA 2.17-M91 The produc
Resumen del contenido incluido en la página 5
Inspection NOTE: The following requirements reference various The state or local gas inspector of the side wall horizontally Massachusetts and national codes not contained in this vented gas fueled equipment shall not approve the installa- document. tion unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with G. Requirements for the Commonwealth of the provisions of 248 CMR 5.08(2)(a) 1 through 4. Massachusetts Exemption
Resumen del contenido incluido en la página 6
Getting Started 2 A. Design & Installation Considerations C. Inspect Appliance & Components Quadra-Fire direct vent gas appliances are designed to operate with all combustion air drawn from outside of the WARNING building and all exhaust gases expelled to the outside. No additional air source is required. Inspect appliance and components for damage. Damaged parts may impair safe operation. CAUTION • Do NOT install damaged components. • Do NOT install incomplete components. Check building c
Resumen del contenido incluido en la página 7
Appliance Location and Clearances 3 NOTE: WARNING · Illustrations refl ect typical installations and are FOR Fire Risk DESIGN PURPOSES ONLY. Provide adequate clearance: · Illustrations/diagrams are not drawn to scale. • Around air openings • To combustibles · Actual installation may vary due to individual design • For service access preference. Locate appliance away from traffi c areas. A. Selecting Appliance Location WARNING When selecting a location for your appliance it is importan
Resumen del contenido incluido en la página 8
Termination Locations 4 A. Vent Termination Minimum Clearances HORIZONTAL OVERHANG WARNING Fire Risk. 2 FT. 20 INCHES MIN. VERTICAL MIN. Explosion Risk. WALL LOWEST Maintain vent clearance to combustibles DISCHARGE as specifi ed. OPENING • Do not pack air space with insulation or GAS DIRECT VENT TERMINATION CAP other materials. Failure to keep insulation or other materials X away from vent pipe may cause fi re. 12 ROOF PITCH IS X/ 12 Measure vertical clearances from this surface. H (MIN.) -
Resumen del contenido incluido en la página 9
M N P G R v A H Q D (See Note 2) E v V B L U.S. B T v (3 FT) v B B v S S Electrical V V Service F v v M I D* v X A J or K V X = VENT TERMINAL = AIR SUPPLY INLET = AREA WHERE TERMINAL IS NOT PERMITTED V K = 3 ft. (U.S.A.) A = 12 inches ............. clearances above grade, veran- 6 ft. (Canada) ......... clearance to a mechanical (See Note 1) da, porch, deck or balcony (powered) air supply inlet B = 12 inches ............ clearances to window or door L** = 7 ft. ......................... clearanc
Resumen del contenido incluido en la página 10
Vent Information 5 A. Venting Components B. Use of Elbows In order to comply with applicable codes and product warranties, use only following venting components: CAUTION • Hearth & Home Technologies (HHT) ALL vent confi guration specifi cations MUST be followed. • Simpson Dura-Vent • This product is tested and listed to these specifi cations. • Selkirk Direct-Temp • Appliance performance will suffer if specifi cations are • Amerivent Direct not followed. • Security Secure Vent Diagonal
Resumen del contenido incluido en la página 11
D. How to Use the Vent Graph E. Venting Guidelines 1. Measure the vertical distance from the center line of the NOTES flue pipe to the center of the 90° elbow. On the graph The maximum horizontal vent run is 20 ft. (6m) when the below, draw a horizontal line from that measurement vertical vent rise is 10 ft. (3m). on the vertical axis across until it intersects with the The minimum horizontal vent run is 6 in. (152mm) slanted line. Horizontal sections require a 1/4 in. (6mm) rise for every 12
Resumen del contenido incluido en la página 12
F. Horizontal Termination WARNING Fire Hazard. Up & Out Installations for Top Vent Type A - Exhaust Fume Risk. Configurations Impaired Performance of Appliance. Wall Thimble • Ensure vent components are locked together correctly. 90º Degree • Pipe may separate if not properly joined. Elbow Step 2. Termination Cap Pipe Length Wall Thimble Cover Direct vent pipe is designed with a locking connection. To connect the venting system to the appliance flue outlet, a Pipe Length twist-lock ad
Resumen del contenido incluido en la página 13
Step 3. NOTE: For installations using a round support box/wall thimble (1) Installation requires a minimum of 6 in. (152mm) (check pipe manufacturer's instructions), mark the wall for a horizontal run of vent with a 1/4 in. (6mm) rise run towards 10 in. x 10 in. (254mm x 254mm) square hole. The center the termination. Each 1 ft. (305mm) of horizontal venting of the square hole should line up with the center line of the must include a 1/4 in. (6mm) rise. Never allow the vent horizonta
Resumen del contenido incluido en la página 14
the vent pipe. Use the two sheet metal screws provided to connect the strips to the pipe section (Figure 5.9). 8 in. (203mm) 7 in. 1/4 in. (6mm) (178mm) 7 in. Fold Strap Here (178mm) 6 in. (152mm) Sheet Metal Screw Wall Thimble Figure 5.7 Wall Thimble Cover/Ceiling Firestop as Required by Local Jurisdiction Strap (NOTE: Some termination caps may cause the vent Figure 5.9 pipe to be off center on flashing). Ensure that proper clearances to combustible materials are maintained.
Resumen del contenido incluido en la página 15
G. Vertical Termination 1. Direct Vent Pipe Vertical Termination Cap Storm Collar Flashing 40 ft. (12m) Maximum Firestop Support Box Pipe Length Figure 5.11 Step 2. Set the gas appliance in its desired location. Drop a plumb bob down from the ceiling to the position of the appliance flue exit, and mark the location where the vent will penetrate the ceiling. Drill a small hole at this point. Next, drop a plumb bob from the roof to the hole previously drilled in the ceiling, and mark th
Resumen del contenido incluido en la página 16
Step 3. CAP AND STORM Shingles overlap on To install the round support box/wall thimble cover in a flat COLLAR NOT SHOWN top edge of flashing FOR CLARITY ceiling, cut a 10 in. (254mm) square hole in the ceiling, centered on the hole drilled in Step 2. Frame the hole as shown in Figure 5.13. Ceiling Joists Framing Figure 5.14 Step 7. Continue to assemble pipe sections until the height of the vent (before adding the termination cap) meets the minimum code requirements as outlined in th
Resumen del contenido incluido en la página 17
Step 9. Twist-lock the vent cap and seal. Note: For multi-story vertical installations, a ceiling firestop is required at the second floor, and any subsequent floors (Figure 5.16). The opening should be framed to 10 in. x 10 in. (254mm x 254mm) inside dimensions, in the same manner as shown in Figure 5.13. Nails Ceiling Firestop Minimum 1 in. (25mm) Clearance Minimum 1 in. (25mm) Clearance Minimum 1 in. (25mm) Clearance Minimum 1 in. (25mm) Clearance Figure 5.16 WARNING Fire Risk. Explo
Resumen del contenido incluido en la página 18
2. Cathedral Ceiling Step 1. Follow installation Steps 1 and 2 under vertical installation section, page 15. Step 2. Using the plumb-bob, mark the center line of the venting system on the ceiling, and drill a small hole through the ceiling and roof at this point. From the roof, locate the drill hole and mark the outline of the cathedral ceiling support box. Step 3. Remove shingles or other roof covering as necessary to cut the rectangular hole for the support box. Cut the hole 1/8 in. (3m
Resumen del contenido incluido en la página 19
3. Class A Metal Chimney Step 4. Pass the flex pipe down through the center of the chimney system, and center the top adapter on the top of the chimney Termination Cap pipe. Drill four 1/8 in. (3mm) diameter holes through the Top Adaptor top adapter, and into the chimney top. Ensure that you are drilling into the metal on the chimney. Twist lock the high wind termination cap onto the top adapter (Figures 5.22 Flashing and 5.23). Existing Metal Chimney System 4 in. (102mm) Flex Pipe Retro
Resumen del contenido incluido en la página 20
4. Existing Masonry Chimney Type A - Up & Out Installations for Top Vent Type B - Hearth Rear Vent Installations for Use With Configurations Rear Vent Kit (see Section 12 for conversion kit and venting components.) Termination Cap Chimney Liner Termination Cap Top Adaptor Flashing 4 in. (102mm) Flex Liner 3 in. (76mm) Retro Connector Flex Liner Co-Axial to Co-Linear Connector 90° Elbow Pipe Length Optional Direct Vent Pipe Chimney Liner Termination Cap 30 ft. (9m) of 3 in. (76mm) F