Resumen del contenido incluido en la página 1
Installation Manual
COLOR SCANNING SONAR FSV-24/24S
SAFETY INSTRUCTIONS...........................................................................i
SYSTEM CONFIGURATION.....................................................................iii
EQUIPMENT LISTS ...................................................................................v
1. MOUNTING THE EQUIPMENT........................................................ 1-1
1.1 Mounting the Hull Unit...................................
Resumen del contenido incluido en la página 2
The paper used in this manual is elemental chlorine free. ・FURUNO Authorized Distributor/Dealer 9-52 Ashihara-cho, Nishinomiya, 662-8580, JAPAN Telephone : +81-(0)798-65-2111 Fax : +81-(0)798-65-4200 A : APR. 2001 All rights reserved. Printed in Japan L : JUN. 15, 2007 Pub. No. IME-13180-L (YOSH ) FSV-24/24S *00080916714* *00080916714* **00080916714 00080916714** * 0 0 0 8 0 9 1 6 7 1 4 *
Resumen del contenido incluido en la página 3
SAFETY INSTRUCTIONS WARNING DANGER Keep away from moving Install the specified transducer tank shaft of the hull unit. in accordance with the installation instructions. If a different tank is to be Gears may cause injury. installed the shipyard is solely respon- sible for its installation, and it should be installed so the hull will not be damaged if the tank strikes an object. The tank or hull may be damaged if the tank strikes an object. WARNING If a steel tank is installed on a wooden Do
Resumen del contenido incluido en la página 4
CAUTION Maximum speed while the transducer is projected and being raised or lowered is as below, to prevent damage to the transducer. Projected Raising/ Lowering 1200 mm stroke Max. 18 kt Max. 15 kt 1600 mm stroke Max. 15 kt Max. 12 kt Observe the following compass safe distances to prevent interference to a magnetic compass: Standard Steering compass compass Processor Unit 1.55 m 1.05 m Control Unit 0.2
Resumen del contenido incluido en la página 5
SYSTEM CONFIGURATION Standard type CONTROL UNIT MONITOR FSV-2401 UNIT FSV-2400 Local Supply Option AD Converter Gyrocompass AD-10 Loudspeaker Current Indicator Sub Monitor Current Echo Sounder, Indicator/Log Current Indicator, other E/S Interface PROCESSOR UNIT VI-1100A Navigator 1 FSV-2402 Net Recorder Navigator 2 VI-1100A External Net Sonde VI-1100A Interface CS-120A Junction Box (already installed) CS-170 Net Sonde Note 1 100/110/115/ 220/230 VAC, Cable for 1φ, 50/60 Hz Extension Kit
Resumen del contenido incluido en la página 6
Black box type CONTROL UNIT FSV-2401 Monitor Local Supply Option AD Converter Gyrocompass AD-10 Loudspeaker Current Sub Monitor Indicator Current Echo Sounder, Indicator/Log Current Indicator, other E/S Interface PROCESSOR UNIT Navigator 1 VI-1100A FSV-2402 Net Recorder Navigator 2 VI-1100A External Net Sonde VI-1100A Interface CS-120A Junction Box (already installed) CS-170 Net Sonde Note 1 100/110/115/ 220/230 VAC, Cable for 1φ, 50/60 Hz Extension Kit POWER FSV-2451 TRANSCEIVER SUPPLY FSV-2
Resumen del contenido incluido en la página 7
EQUIPMENT LISTS Standard supply Name Type Code No. Q’ty Remarks Monitor Unit FSV-2400 - 1 21” color monitor Control Unit FSV-2401 - 1 w/cable FSV-2402 - For FSV-24 Processor Unit 1 FSV-2402S For FSV-24S Transceiver Unit FSV-241E - 1 Power Supply Unit FSV-242 - 1 FSV-247 - 1200 mm stroke Hull Unit 1* FSV-248 - 1600 mm stroke For system with monitor CP10-04501, 10S2074, CP10-05100 000-067-027 CP10-04502, CP10-04503, CP10-04505, CP10-04506, 10S2078 For system with monitor CP10
Resumen del contenido incluido en la página 8
Options Name Type Code No. Q’ty Remarks Monitor Unit FSV-2400-10 With CP10-04501, FP03-06201, FP10-02202, - Dust cover & 10S5207 (10 m cable) 1 FSV-2400-30 With CP10-04501, FP03-06201, FP10-02202, - Dust cover & 10S2075 (30 m cable) Control Unit FSV-2401-E-5 With FP10-02201 & 5 m - cable 1 FSV-2401-E-10 With FP10-02201 & 10m - cable 37 cores Cable 10S1258 000-101-006 1 Specify length E/S Interface VI-1100A - 1 Net Zonde Junction CS-170 - 1 For sonde connection Box For co
Resumen del contenido incluido en la página 9
1. MOUNTING THE EQUIPMENT 1.1 Mounting the Hull Unit Note1) The rise/lower control box of the hull unit contains motion sensor. Therefore, never drop the hull unit. Note2) Take care the handling of the transducer. Do not give a strong shock. 1.1.1 Location of hull unit Decide the location of the hull unit through consultation with the dockyard and ship owner. When deciding the location, the following points should be taken into account. • Select an area where propeller noise, cruising
Resumen del contenido incluido en la página 10
1300 650 Heater Insulator Maintenance space, example sonar compartment Note: After mounting the equipment, install stays for anti-vibration. See page 1-7. 1-2 600 1000
Resumen del contenido incluido en la página 11
1.1.2 Shortening the retraction tank The retraction tank is 1300 mm in length when supplied. Shorten the tank as necessary so that the transducer is placed well below the keel when it is fully lowered. The following table provides guidelines for shortening the tank. Refer also to the retraction tank installation drawing at the back of this manual. Installation Method D D XDCR Travel Remove 130 Remove 130 to 140 mm thru 140 mm from the bottom. from the Same as left. Note that the length
Resumen del contenido incluido en la página 12
1.1.3 Remarks for installation of retraction tank 1. Make, if possible, the installation location a double bottom structure. 2. Install, if possible, the tank on the keel where the tank can be most firmly fixed. 3. Install the reinforcement ribs as near as possible to the top of the retraction tank, allowing space for tightening of bolts and nuts. Retraction tank Reinforcement rib 250-300 mm How to install reinforcement ribs 4. Add a doubling plate at the location where the retracti
Resumen del contenido incluido en la página 13
1.1.4 Installing hull unit on retraction tank After welding the retraction tank and allowing sufficient time for cooling, install the hull unit as follows. 1. Clean the hull unit flange, the O-ring and O-ring groove. Coat them with a slight amount of grease. Place the O-ring in position on the tank flange. 2. Orient the hull unit so that the bow mark (inscribed) on its flange points toward the ship’s bow. Note that heading adjustment in the display unit is required if the bow mark doe
Resumen del contenido incluido en la página 14
Hex. Nut Spring Washer Flat Washer Bow Mark Hull Unit Flange O-ring Tank Flange Flat Washer Hex. Bolt Hex. Nut Spring Washer O-ring Flat Washer O-ring Retraction Tank Flat Washer Hex. Bolt Hex. Nut Spring Washer Stern side (seven locations) Bow side (17 locations) Installation of hull unit 1-6
Resumen del contenido incluido en la página 15
1.1.5 Installing stays (anti-vibration measure) Install stays from the top of the hull unit to the ship’s hull. The stays should be angle iron with a size of 75X75X9 mm or more and at least two pieces should be used; one each to ship’s bow and stern directions. Install if possible, two more stays in ship’s transverse direction. Bow Stay Stay Hull Unit Proper installation of stays Do not install the stays as shown below. Vibration-resistance effect is reduced since vibration is applied
Resumen del contenido incluido en la página 16
1.2 Mounting the Display Unit The display unit is composed of the processor, monitor and control units. 1.2.1 Processor unit Mounting considerations When selecting a mounting location, keep in mind the following points: • The processor unit must be mounted upright. • Locate the unit out of direct sunlight and away from heat sources because of heat that can build up inside the cabinet. • Locate the equipment away from places subject to water splash and rain. • Be sure the mounting l
Resumen del contenido incluido en la página 17
Mounting procedure 1. Unfasten two bolts from the bottom of the front side of the processor unit, and pull the unit toward you to separate the unit from the mounting base. 2. Fasten six bolts (M6x20, supplied as installation material) to install the mounting base. 3. Place the processor unit in front of the mounting base. 4. Push the unit forward until it touches the end of the mounting base. 5. Refasten two bolts removed at step 1 to fix the unit. 505 5.5 477 34 8 200+1 195+1 Front vi
Resumen del contenido incluido en la página 18
Mounting procedure 1. Drill four holes of 12 mm in diameter in the mounting location, referring to the outline drawing for mounting dimensions. 2. Unfasten two M4X10 screws to dismount the front cover. 3. Unfasten two sets of M10 bolts, plain washers and spring washers to separate the monitor from the mounting base. 4. Pull the monitor forward about four centimeters and then lift it to separate it from the mounting base. 5. Fasten the mounting base to the mounting location with M10 bolts
Resumen del contenido incluido en la página 19
Attaching the CRT filter 1. Attach two spacer (5x2.5, supplied) with screws (M5x10, supplied) to the location shown below. 2. Screw two hood retainer (supplied) into the filter (supplied). 3. Turn two washers (Ф12, supplied) into two hood retainer attached at step 2. 4. Attach the filter to the monitor unit as shown below. Hood retainer (2 pcs.) Filter Washer (2 pcs.) M5 tapping hole CRT (Up side) Notch (Down side) Spacer (2 pcs.) Screw (2 pcs.) How to attach the hood 1.2.3 Control u
Resumen del contenido incluido en la página 20
(2) Fixing without KB fixing plate 1) Drill four mounting holes of 6 mm diameter to fasten the control unit, referring to the outline drawing at the back of this manual. 2) Make a cutout in the mounting location large enough to accommodate the name plate so the control unit will lie flat. For dimensions, see the outline drawing at the back of this manual. 3) Fix the control unit with four bolts (M5) from under the tabletop. (M5 bolts with a sufficient length for the thickness of the tab