Resumen del contenido incluido en la página 1
150kW InfraStruXure PDU
PD150G6F
PD150L6F
Operation and Configuration
480V/ 600V Input
Resumen del contenido incluido en la página 2
Resumen del contenido incluido en la página 3
About this Manual This manual is intended for end-users of a 150kW InfraStruXure PDU. It covers the operation and quick-configuration of the PDU, and includes basic InfraStruXure system operation. For additional information about the InfraStruXure system, see the InfraStruXure Installation and Start-Up Manual (990-1983), which covers the installation and start-up of UPS power distribution to the rack and power distribution within the rack. For information about specific components in your In
Resumen del contenido incluido en la página 4
Resumen del contenido incluido en la página 5
Contents Safety ......................................................................1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Save these instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Safety symbols used in this manual . . . . . . . . . . . . . . . . . . . 1 Cross-reference symbols used in this manual . . . . . . . . . . . . . 1 Warnings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Resumen del contenido incluido en la página 6
Volt-Meter Screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 Contacts Screen. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Breakers Screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 Alarms Screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 View Active Alarms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 Alarm/Event Log . . . . . . . . . . . . . . . . . . . . .
Resumen del contenido incluido en la página 7
Configuring the Network Management Interface . . . . . . . . . . . 37 Connect the InfraStruXure PDU to your network . . . . . . . . . 37 Configuration Overview . . . . . . . . . . . . . . . . . . . . . . . . . . 37 TCP/IP configuration methods . . . . . . . . . . . . . . . . . . . . . . 38 Device IP Configuration Wizard . . . . . . . . . . . . . . . . . . . . . 38 BOOTP & DHCP configuration . . . . . . . . . . . . . . . . . . . . . . 39 Local access to the control console . . . . . . . . . . .
Resumen del contenido incluido en la página 8
How to Download Firmware Updates . . . . . . . . . . . . . . . . . . . 62 Specifications ........................................................ 63 150kW InfraStruXure PDU. . . . . . . . . . . . . . . . . . . . . . . . . . . . 63 Product Information .............................................. 65 Warranty. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65 Life-Support Policy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67 How to Obtain S
Resumen del contenido incluido en la página 9
Safety Overview Save these instructions This manual contains important instructions that must be followed during installation, operation, and configuration of the InfraStruXure PDU. Safety symbols used in this manual Indicates an electrical hazard, which, if not avoided, could result in injury or death. Electrical Hazard Indicates a hazard, which, if not avoided, could result in personal injury or damage to the product or other property. Warning Indicates a potential hazard which could resu
Resumen del contenido incluido en la página 10
Warnings Receiving/moving Do not tilt the PDU greater than 45° from its vertical axis. Never lay the PDU on its side. Installation/maintenance Only a certified electrician can: Connect the PDU to its power source Connect a switch to the EPO interface on the PDU Install a customer-specified, hard-wired power cable Only a certified electrician or an APC Field Service Engineer can perform maintenance of the PDU. When connecting the PDU to utility, you must install a circuit breaker to prote
Resumen del contenido incluido en la página 11
Safety: Warnings Total power off procedure 1. Set the PDU Main Input switch to OFF. 2. Set the upstream circuit breaker of the power source to OFF. Emergency Power Off (EPO) Hazardous voltage from the branch circuit must be isolated from the 24VAC, 24VDC, and contact closure. 24VAC and 24VDC are considered Class 2 circuits as defined in Article 725 of the National Electrical Code (NFPA 70) and Section 16 of the Canadian Electrical Code (C22.1). A Class 2 circuit is a source having limited volt
Resumen del contenido incluido en la página 12
Safety: Warnings EMI This equipment has been tested and found to comply with the limits for Class A digital devices, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with this user manual, may cause harmful interference to radio communications
Resumen del contenido incluido en la página 13
Overview InfraStruXure PDU Components The APC 150kW InfraStruXure PDU provides distribution and management of electrical power. The InfraStruXure PDU has the capacity of 150kW, accepts 480V or 600V 3-phase input, and distributes 208V 3-phase power to equipment racks and Rack Distribution Panels (RDPs). The RDPs sit in the top 10U of specially-designed NetShelter VX enclosures and distributes power to equipment racks. The InfraStruXure PDU is housed in a specially-designed 23-inch NetShelter
Resumen del contenido incluido en la página 14
InfraStruXure PDU Front view The PDU power cables feed equipment racks; they are fed through the knockout panels on the top of the PDU. There are the following two options for PDU power cables: multi-circuit power cables that terminate with an L21-20 outlet (shown) and single-circuit power cables that terminate with an L6-30 outlet. The number of power cables installed in the PDU depends on your system configuration. Each power cable accepts a variety of APC InfraStruXure r
Resumen del contenido incluido en la página 15
Overview: InfraStruXure PDU Front view (interior) The Main Output circuit breaker protects the distribution circuit breaker panels. The optional sub-feed output circuit breakers offer a means to distribute higher blocks of power to other equipment or distribution units. The 42-position circuit breaker panels provide 84 total pole positions. Each single pole provides power at 120 volts L-N or two single poles provide 208 volts L-L. The amperage each position provides depends on the siz
Resumen del contenido incluido en la página 16
Overview: InfraStruXure PDU Rear view The document pocket provides storage of documents related to the InfraStruXure PDU. 8 150kW InfraStruXure PDU—Operation and Configuration
Resumen del contenido incluido en la página 17
Overview: InfraStruXure PDU Rear view (interior) The PDU monitoring unit receives signals from several current and voltage monitoring boards that report to a central board assembly located in the PDU monitoring unit. The monitoring unit has one 10 Base-T (Cat-5) connection to the Information Controller Hub (or switch), four relay output connections, four input contact connections, and one EPO input connection. Make these connections at the user connection plate located on the roof of the
Resumen del contenido incluido en la página 18
Overview: InfraStruXure PDU PDU monitoring unit The EPO DIP switches configure the EPO input for the type of EPO switch that is connectedNormally Open (NO) or Normally Closed (NC). When the EPO Arm/Test rocker is in the Test position, engaging the EPO switch will not cause the load to be powered off. When the rocker is in the Armed position, engaging the EPO switch will cause the PDUs main input switch to be switched OFF. See How to Connect an EPO Switch to the PDU and Test the Switc
Resumen del contenido incluido en la página 19
Overview: InfraStruXure PDU The Display port (RJ-45) connects the PDU monitoring unit to the display interface. The Power LED indicates whether the monitoring unit is receiving power. Use the Console port (DB-9) to connect a laptop computer to the monitoring unit using an appropriate communication cable. This port is used to configure items relating to servicing the PDU. The branch current monitoring boards connect to the Branch Current Monitor ports (RJ-11). These ports are on the si
Resumen del contenido incluido en la página 20
Overview: InfraStruXure PDU User connection plate For a description and location of the user connection plate, see () on page 6. For clarity, the user connection plate in the illustration below is shown in greater detail. Connect the InfraStruXure PDU to the network or the InfraStruXure Manager through the ethernet port. The user connection plate has four input contact connections for monitoring Normally Open (NO) or Normally Closed (NC) dry contacts. See page 20 and page 58 for more i