Resumen del contenido incluido en la página 1
Installation Guide
Resumen del contenido incluido en la página 2
Resumen del contenido incluido en la página 3
Solid State Logic Digital Broadcast Console Installation Guide Version 1.2.0 82S6PC1010C
Resumen del contenido incluido en la página 4
C100 Installation Guide Solid State Logic S O U N D V I S I O N || Begbroke, Oxford, England, OX5 1RU • +44 (0)1865 842300 320 West 46th Street, 2nd Floor, New York, NY 10036, USA • +1 (1) 212 315 1111 Suite 401, 5757 Wilshire Blvd, Los Angeles, CA 90036, USA • +1 (1) 323 549 9090 3-55-14 Sendagaya, Shibuya-Ku, Tokyo 151-0051, Japan • +81 (0)3 5474 1144 7 bis, rue de la Victoire, le Blanc Mesnil, Paris 93150, France • +33 (0)1 48 67 84 85 Via Timavo 34, 20124 Milano, Italy • +39 (0)39 2328 094 V
Resumen del contenido incluido en la página 5
Contents 1 Introduction 2 2 Safety Considerations 3 Safety Warnings 4 CE/FCC/WEEE Certification and Directives 5 3 Pre-Installation Information 6 Services Provided by SSL 6 Physical/Structural 7 Console Footprint and Side Profile 8 Centuri and Stagebox Side View 10 Technical 11 4 System Components 13 Console Frame 13 The Centuri Processor 15 The Centuri Processor Cards 16 C-SB Stagebox (option) 21 MORSE (option) 21 NetBridge (option) 23 Script Tray (option) 25 Loudspeaker Shelf (option) 25 XGA V
Resumen del contenido incluido en la página 6
C100 Installation Guide Section 1 – Introduction The object of this manual is to provide purchasers of the C100™ Console and Centuri™ Processor with information in the following areas: • Safety considerations • Installation requirements • Items supplied: – Main components and optional items • Installation: – Physical assembly – Electrical connections and cabling – System options • Specifications and Physical dimensions • Pinouts of standard connectors The information provided by this manual is r
Resumen del contenido incluido en la página 7
Safety Considerations Section 2 Section2 – Safety Considerations This section contains definitions and warnings, and practical information to ensure a safe working environment. Please take time to read this section before undertaking any installation work. Definitions ‘Maintenance’ All maintenance must be carried out by fully trained personnel. Note: it is advisable to observe suitable ESD precautions when maintenance to any part is undertaken. ‘Non-User Adjustments’ Adjustments or alterations t
Resumen del contenido incluido en la página 8
C100 Installation Guide Safety Earth Connection Any mains powered item of SSL equipment that is supplied with a 3-core mains lead (whether connectorised or not) should always have the earth wire connected to the mains supply ground. This is the safety earth and grounds the exposed metal parts of the racks and cases and should not be removed for any reason. Mains Supply and Phases SSL equipment is designed for connection to single-phase supplies with the Neutral conductor at earth potential – cat
Resumen del contenido incluido en la página 9
Safety Considerations Section 2 CE Certification Note that the majority of cables supplied with SSL equipment are fitted with ferrite rings at each end. This is to comply with current European CE regulations and these ferrites should not be removed. If any of the console metalwork is modified in any way – particularly the addition of holes for custom switches etc. – this may the adversely affect the CE certification status of the product. FCC Certification The equipment which forms a C100/Centur
Resumen del contenido incluido en la página 10
C100 Installation Guide Section 3 – Pre Installation Information Physical installation of the console is normally carried out by a specialised transportation company. In some cases this will have been arranged by the local SSL office, in other cases by the facility. The cables that run between console and processor can be shipped in advance of the console in a separate kit (the pre-install kit). These cables should be installed by the facility engineers. Instructions for installing these cables
Resumen del contenido incluido en la página 11
Pre Installation Information Section 3 Physical Requirements Console Control Surface The console control surface can be specified to have from 8 to 96 channels so the size and weight will vary considerably. A dimensioned footprint drawing for each specific console control surface can be provided by SSL’s Project Engineering Department. See page 8 for an example of a 32-channel footprint. Consoles can be built with split points at any profile (at additional cost). The console can then be split fo
Resumen del contenido incluido en la página 12
C100 Installation Guide 32 Channel Footprint 1776 18916 17 24 Master 25 32 53 334 Console legs can be located at any position along console beam. Maximum distance between legs is 1,336mm (ie. four bays) Side Profile Showing Service Access Top Trim shown raised Meter drive cards Power supplies Connector Panels Page 8 988 956 283 640 1056 80 min. 0-45 732
Resumen del contenido incluido en la página 13
Pre Installation Information Section 3 Air Conditioning Requirements Air conditioning will almost certainly be required for both the Machine and Control rooms in order to maintain the temperature and humidity to within the required levels. Power dissipation figures for console control surface and equipment rack are listed in Appendix A. Appendix E contains the environmental specification for SSL equipment. Cable Ducting Cable ducting will be required between the console and the Machine room (as
Resumen del contenido incluido en la página 14
C100 Installation Guide Centuri Processor Crate (side view) Showing Card Access 270 592 270 15U Rear Front C-SB Crate (side view) Showing Card Access 462 270 14U Rear Front Dimensions in mm Page 10
Resumen del contenido incluido en la página 15
Pre Installation Information Section 3 Technical Requirements Video Sync Source The Centuri Processor requires a feed of video sync. Other sources – MIDI or wordclock etc. – cannot be used as the sync reference. The sync required is 75Ω 1V(pk-pk) black-and-burst video. The standard can be either PAL (625 line, 50Hz) , NTSC (525 line, 59.94Hz or 60Hz). Composite sync may also be used. Many other studio peripherals (digital recorders, editors and all video picture recorders) will also require a fe
Resumen del contenido incluido en la página 16
C100 Installation Guide C100 Channel Bay Layout UBus 1 DCart C EVS 6 Mic A-1 Mic A-2 Mic A-3 Mic A-4 Mic A6/7 1Chan: 17 2 Chan: 18 3 Chan: 19 4Chan: 20 5 Chan: 21 6 Chan: 22 7 Chan: 23 8 Chan: 24 POST PROC INPUT PRE PROC PRE FADER PRE FADER PRE FADER PRE FADER POST PROC 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 6 6 6 6 6 6 6 6 9 9 9 9 9 9 9 9 12 12 12 12 12 12 12 12 15 15 15 15 15 15 15 15 18 18 18 18 18 18 18 18 20 20 20 20 20 20 20 20 24 24 24 24 24 24 24 24 30 30 30 30
Resumen del contenido incluido en la página 17
Section 4 System Components Section 4 – System Components This section gives an overview of the main units in the system. See Appendix A for specifications and Appendices B and C for connector details and pinouts. C100 Console Each console control surface will consist of one Centre Section and can be specified to have from 8 to 96 channel faders in groups of 8. (Note: a group of 8 faders and controls and its frame is termed a bay). See page 10 for frame sizes. Each console channel-bay consists
Resumen del contenido incluido en la página 18
C100 Installation Guide I I O O -15V +15V +5.5V +5V +3.3V -15V +15V +5.5V +5V +3.3V Centuri Processor Crate (Front View) Access to: PSUs Solid State Logic Solid State Logic Solid State Logic +5V +5V +5V O X F O R D • E N G L A N D O X F O R D • E N G L A N D O X F O R D • E N G L A N D Removable media drive +5V +5V +5V +3V3 +3V3 +3V3 FLAG 1 FLAG 1 FLAG 1 SCSI A 7-12 7-12 7-12 DSP cards FLAG 12 FLAG 12 FLAG 12 SCSI B RESET RESET RESET System Disk card I/O Cards (Mic or Digital) 1-6 1-6 1-6 SPLIT
Resumen del contenido incluido en la página 19
Section 4 System Components The Centuri Processor The Centuri processor is a 15U high 600mm deep rack unit. Cards are fitted to the front and rear of the chassis so space for access is essential. See page 10 for chassis dimensions and minimum service clearance. At the front of the processor are located the plug-in PSU units. One unit is capable of powering the system. The panel below the power supplies is fitted with either a 250Mb Zip drive or an SD memory card reader. This is used to transfer
Resumen del contenido incluido en la página 20
C100 Installation Guide ETHERNET Solid State Logic ROUTING CARD O X F O R D • E N G L A N D DSP CARD MACHINE TIME DISK CARD CONTROL CODE +5V +5V VIDEO 1 +3V3 +3V3 FLAG 1 SCSI A FLAG 12 SCSI B VIDEO 2 RESET VIDEO 3 SYNC CONTROL SURFACE 1 SCSI B PORT 2 CONTROL SURFACE 2 SERIAL PORT 1 CONTROL SURFACE 3 2 1 DSP System Disk CPU Routing/Link Console Card Card Card Card Interface Card Page 16 901XA 945XA 906XA 909XB 960XA