Inhaltszusammenfassung zur Seite Nr. 1
653
OWNERS MANUAL
for
E-Max™
TEA BREWERS
MODELS
2030
Includes:
Installation
Operation
Use & Care
Servicing Instructions
Model 2030
Tea Brewer
with optional
8799 Dispenser
E-Max BREWERS are covered under
U. S. Patents #5704275, 5862738, 6095031.
Other U.S. Patents and Canadian Patents Pending
PRINTED IN UNITED STATES OF AMERICA
p/n 73902 Rev. F ECN-12817
Inhaltszusammenfassung zur Seite Nr. 2
WARRANTY STATEMENT All electrical equipment manufactured by BLOOMFIELD It also does not apply if the serial nameplate has been INDUSTRIES is warranted against defects in materials and removed or unauthorized service personnel perform service. workmanship for a period of one year from the date of original The prices charged by Bloomfield Industries for its products installation or eighteen (18) months from the date of shipment are based upon the limitations in this warranty. Seller
Inhaltszusammenfassung zur Seite Nr. 3
TABLE OF CONTENTS WARRANTY STATEMENT xi Thank You for purchasing this SPECIFICATIONS 1 Bloomfield Industries appliance. FEATURES & OPERATING CONTROLS 2 PRECAUTIONS & GENERAL INFORMATION 3 Proper installation, professional INSTALLATION 4 operation and consistent AG
Inhaltszusammenfassung zur Seite Nr. 4
FEATURES AND OPERATING CONTROLS Features & Operating Controls 2
Inhaltszusammenfassung zur Seite Nr. 5
PRECAUTIONS AND GENERAL INFORMATION WARNING: Electric Shock Hazard All servicing requiring access to non-insulated components must be performed by qualified service personnel. Do not open any access panels which require the use of tools. Failure to heed this warning can result in electrical shock. WARNING: Injury Hazard All installation procedures must be performed by qualified personnel with full knowledge of all applicable electrical and plumbing codes. Failure could result in pr
Inhaltszusammenfassung zur Seite Nr. 6
INSTALLATION INSTRUCTIONS READ THIS CAREFULLY BEFORE STARTING THE INSTALLATION IMPORTANT: UNPACKING & INITIAL INSPECTION To enable the installer to make 1. Unpack the unit. Inspect all components for completeness a quality installation and to and condition. Ensure that all packing materials have been minimize installation time, the removed from the unit. following suggestions and tests should be done before the 2. Verify that the Spray Head and Spray Head
Inhaltszusammenfassung zur Seite Nr. 7
INSTALLATION INSTRUCTIONS (continued) 5. NSF requires that the brewer be able to be moved for NOTE: This equipment must cleaning underneath. Loops of copper tubing will satisfy this be installed to comply with requirement. applicable federal, state and local plumbing codes and COPPER LOOPS ordinances. (PROVIDED BY PLUMBER) SOLENOID SHUT-OFF VALVE STRAINER (PROVIDED BY WASHER PLUMBER) WARNING ELECTRIC SHOCK HAZARD: FLOW WATER SUPPLY Bre
Inhaltszusammenfassung zur Seite Nr. 8
OPERATION OPERATING INSTRUCTIONS IMPORTANT: 1. Energizing the Brewer: When electricity has been connected to All E-Max T™ brewers are the unit, there will be a momentary flash of the power light. Turn tested and set at the factory. the brewer on by pressing the POWER key. The If programming adjust- brewer will start to fill the tank. With the proper ments are necessary, water supply the tank should be filled in about 2½ refer to the E-Max™ minutes. Once filled
Inhaltszusammenfassung zur Seite Nr. 9
OPERATION (continued) USER’S GUIDE WARNING: 1. Remove the brew chamber from Burn Hazard. under the spray head. Place one (1) PAPER genuine Bloomfield paper filter into This appliance FILTER dispenses very hot liquid. the brew chamber. Add your choice of pre-measured tea leaves. Serious bodily injury from BREW CHAMBER scalding can occur from Shake the brew chamber gently to level the tea leaves. contact
Inhaltszusammenfassung zur Seite Nr. 10
OPERATION (continued) PROGRAMMING FEATURES AND OPTIONS 1. View Water Temperature in Tank: To view the water temperature on the screen, E-Max T™ brewer must be ON, and not brewing or in the filling mode. Press and hold the 4th key, and depress the 6th key. The actual water temperature will be displayed for 3 seconds. 2. Daily Brew Count: The E-Max T™ maintains a count of the number of completed brews for a 7-day period. To access the count, turn the b
Inhaltszusammenfassung zur Seite Nr. 11
OPERATION (continued) 8. Clock A. Time – Battery Backup. The E-Max T™ has a battery backup system which will maintain the proper time during power failures, or when the brewer is unplugged (even for very prolonged periods of time). Normally there will not be a need to set the time except for Daylight Saving Time changes, or moving the brewer to different time zones. B. Changing Day and Time: To change time, turn the E-Max T™ o
Inhaltszusammenfassung zur Seite Nr. 12
OPERATION (continued) 12. View Filter Statistics: To view filter statistics, turn the brewer off. Press and hold the 1st key (Brew), and depress the 3rd (ON/OFF) key. Total water volume will be displayed (TotalVol.). Press the 3rd key to view the Filter Life (FltrLife:). Press the 3rd key to view the percentage of the filter that has been used. (If the filter option is used, the filter life volume needs to be entered in the program – see E-Max™ Progra
Inhaltszusammenfassung zur Seite Nr. 13
CLEANING INSTRUCTIONS CAUTION: PROCEDURE: Clean Coffee Brewer Burn Hazard PRECAUTIONS: Disconnect brewer from electric power. Allow brewer to cool. Brewing and serving temperatures of coffee are FREQUENCY: Daily extremely hot. Hot coffee will cause TOOLS: Mild Detergent, Clean Soft Cloth or Sponge serious skin burns. Bristle Brush CAUTION: 1. Disconnect brewer from electr
Inhaltszusammenfassung zur Seite Nr. 14
SERVICING INSTRUCTIONS — PLUMBING FUNCTION 1. Water enters at the inlet fitting of the fill solenoid (32). The solenoid admits water via a command from the controller. NOTE: The solenoid has an internal strainer. To clean the strainer: Shut off water supply. Unscrew the plastic cap protruding from the rear of the brewer. Remove the cap, inlet fitting and washer. With pliers, grasp the bar of the strainer and pull straight out. Was
Inhaltszusammenfassung zur Seite Nr. 15
SERVICING INSTRUCTIONS — PLUMBING (continued) ITEM DESCRIPTION PART N0. USED ON 1 FAUCET, HOT WATER 8783-1 2030 2 ASSEMBLY, WATER TANK (120V) 83500 2030 6 GASKET, TANK LID 83499 2030 9 TANK LID 83504 2030 10 RETAINING CLIP, TANK LID 83506 2030 11 HOSE, VENT (SILICONE 4.5” LONG) 86014 2030 12 HOSE, FAUCET SUPPLY (SILICONE, 10” LONG) 83538 2030 13 TUBE, VENT (METAL, 2.3” LONG) 83384 2030 14 TUBE, VENTED ASSEMBLY 86013 2030 16 TUBE, FILL (SILICONE, 35
Inhaltszusammenfassung zur Seite Nr. 16
SERVICING INSTRUCTIONS - ELECTRICAL FUNCTION WARNING: RISK OF INJURY 1. Pressing the POWER key energizes the unit. The POWER LED will glow whenever the unit is ON. The following servicing sections 2. Automatic fill is accomplished via the "FILL" section of are for operator reference only. All servicing and/or repairs must the INLET SOLENOID (32) and a WATER LEVEL PROBE (7). The probe senses ground through the be performed by a qualified technician wat
Inhaltszusammenfassung zur Seite Nr. 17
SERVICING INSTRUCTIONS - ELECTRICAL (continued) ITEM DESCRIPTION PART N0. USED ON 3 PROBE, TEMPERATURE 83480 ALL 4 THERMOSTAT, HI-LIMIT SAFETY (120V) 83949 ALL 5 GROMMET, TEMP PROBE 84063 ALL 7 SENSOR, WATER LEVEL 83521 ALL 8 SLEEVE, WATER LEVEL SENSOR 83532 ALL 15 ELEMENT, HEATER 1500W (120V) 83518 ALL 17 ASSEMBLY, TRIAC & HEATSINK 83475 ALL 20 CONTROLLER 83823 ALL 33 POWER CORD (120V) 6407-15 ALL 34 STRAIN RELIEF, POWER CORD 51217 ALL 36 OVERLAY DECAL, KEYPAD, VOLUME KEYS 85018 ALL
Inhaltszusammenfassung zur Seite Nr. 18
SERVICING INSTRUCTIONS — DE-LIMING HEATER TANK CAUTION - CHEMICAL 1. Disconnect brewer form the electrical supply. Turn off BURN HAZARD the water supply and disconnect water supply from the brewer inlet fitting. De-liming chemicals are caustic. 2. Remove the top panel to gain access to internal Wear appropriate protective gloves components. and goggles during this procedure. 3. Disconnect water level sensor and water temperature
Inhaltszusammenfassung zur Seite Nr. 19
TROUBLESHOOTING SUGGESTIONS If the E-Max T™ goes into the error mode as outlined below, it will likely be necessary to reset the brewer in order to test individual components. Note the reset procedure below: • For the first four error modes, press and hold CANCEL for 3 seconds, or RE-ENERGIZE the brewer by disconnecting from electric power for 5 seconds, then reconnecting. • From “VALVE FAULT”, the brewer must be RE-ENERGIZED! Using the CANCEL button will not reset the brewer from “Valve
Inhaltszusammenfassung zur Seite Nr. 20
E-Max T™ TEST PROGRAM Remember: Exiting Instructions for testing procedures for the following system components Test Program Mode: (using the E-Max T™ Built-In Diagnostic): To exit the Test Electronic Board Software (Firmware) Revision Program, press the 2nd Keypad switches key (Cancel) at any LED’s time, except during the Inlet valve, Dump (Brew) valve, By Pass Valve key switch tests below. Water level probe, Temperature probe Alternately,