Inhaltszusammenfassung zur Seite Nr. 1
WARNING:
IF THE INFORMATION IN THESE INSTRUCTIONS
ARE NOT FOLLOWED EXACTLY, A FIRE OR EX-
PLOSION MAY RESULT CAUSING PROPERTY
DAMAGE, PERSONAL INJURY OR LOSS OF LIFE.
FOR YOUR SAFETY:
DO NOT STORE OR USE GASOLINE OR OTHER
FLAMMABLE VAPORS AND LIQUIDS IN THE
VICINITY OF THIS OR ANY OTHER APPLIANCE.
INSTALLATION:
INSTALLATION AND SERVICE MUST BE PER-
FORMED BY A QUALIFIED INSTALLER, SER-
VICE AGENCY OR LICENSED GAS SUPPLIER.
Jøtul GF 100 DV
WHAT TO DO IF YOU SMELL GAS:
Nordic QT • DO NOT TRY TO L
Inhaltszusammenfassung zur Seite Nr. 2
Welcome to Jøtul... Congratulations on the purchase of your new Jøtul GF100 DV Nordic QT Gas Heater. We at Jøtul are glad you’ve made the decision to warm your hearth with a Jøtul product. Your new stove exemplifies over 150 years experience as the world’s largest manufacturer of solid fuel burning appliances. We’ve been making fine quality cast iron wood and coal stoves and fireplaces continuously since 1853. In the Nordic QT, we’ve combined advanced gas technology with the warm, traditional e
Inhaltszusammenfassung zur Seite Nr. 3
Jøtul GF100 DV Nordic QT Table of Contents Direct Vent Gas Heater Service Tools .............................................. 3 Manufactured and Distributed by: Specifications ........................................... 4 Jøtul A.S.A. Fredrikstad, Norway General Information ............................... 5 Jøtul North America Safety Information .................................. 6 Portland, Maine Installation Requirements Location ................................................. 6 Test S
Inhaltszusammenfassung zur Seite Nr. 4
GF 100 DV Nordic QT Specifications Specifications Input Rates Natural Gas 14,500 BTU/hr. maximum input 22 1/4” 10,600 BTU/hr. minimum input Propane 14,000 BTU/hr. maximum input 10,900 BTU/hr. minimum input Inlet Pressure: MIN MAX Natural Gas: 5.0 WC (1.24 kPa) 7.0 WC (1.74 kPa) 21” Propane: 11.0 WC (2.74 kPa) 13.0 WC (3.23 kPa) Manifold Pressure: MIN MAX Natural Gas: 2.2 WC (.55 kPa) 3.5 WC (.85 kPa) Propane: 6.5 WC (1.59 kPa) 10.0 WC
Inhaltszusammenfassung zur Seite Nr. 5
General Information THIS HEATER MUST BE INSTALLED AND MAINTAINED DO NOT OPERATE THIS STOVE IF ANY PART HAS BEEN UNDER WATER. Call a qualified service BY A QUALIFIED SERVICE AGENCY. technician to inspect the heater and to replace any The installation and repair of this appliance must be part of the control system and any gas control done by a qualified service person. Failure to properly which may have been under water. install and maintain this heater could result in an Ne pas se servir de
Inhaltszusammenfassung zur Seite Nr. 6
Safety Information Location During normal operation, the Nordic QT gas stove will In selecting a location for the stove, consider the follow- reach high surface temperatures. Therefore: ing points: 1) Heat distribution 2) Vent termination requirements Due to the high operating temperatures, this appli- 3) Gas supply line routing ance should be located out of traffic areas and away 4) Traffic areas, furniture, draperies, etc. from furniture and draperies. The GF100 Nordic QT may be located
Inhaltszusammenfassung zur Seite Nr. 7
Stove and Vent Clearance Requirements CLEARANCE TO REAR WALL IS= (0”) ZERO CLEARANCE Minimum Clearances from the Stove to Combustibles: See figs. 2-4. Rear: 0” (0 mm) Ceiling: 25” (635 mm) Corner: 2” (50 mm) Right Side: 3” (76 mm) Left Side: 10” (254 mm) - for access to Lighting Instruction plate Minimum Clearances from the Vent Pipe to Combus- 10” * 3” (250 mm) (80 mm) tibles: Left Side Right Side Horizontal Run: * Allow 10” on left side of the appliance for complete Off the top of the pip
Inhaltszusammenfassung zur Seite Nr. 8
Restrictor Plate Venting Requirements The Jøtul GF100 Nordic QT gas stove may be installed Vent Restriction with a vertical or horizontal termination and must The Nordic QT is shipped with an Exhaust Restrictor Plate conform to the configuration requirements described which prevents overly strong draft that can cause poor below. combustion and weak flame picture. The Exhaust This appliance is approved for use with vent systems Restrictor should be installed on any stove using a from the
Inhaltszusammenfassung zur Seite Nr. 9
Vertical Venting The Jøtul GF100 DV Nordic QT is approved for vertical venting through a ceiling or to a roof termination • ANY VENTING WITH A VERTICAL RISE MUST following these guidelines: TERMINATE (END) WITHIN THE SHADED AREA. The termination should fall within the shaded area of • ALWAYS MAINTAIN THE PROPER CLEARANCES the grid depicted in fig. 6 below. TO COMBUSTIBLES. Maximum Vertical should not exceed 15 ft. (4.57 m) In no case shall any discharge opeing on the termina-
Inhaltszusammenfassung zur Seite Nr. 10
Horizontal Termination Wall Cut-out Opening: A minimum 10" X 10" (250 mm x Options for immediate horizontal venting 250 mm) square hole is required for proper pipe clear- ances through a combustible wall. Use vent directly off the rear of the stove manufacturer’s WALL THIMBLE for the wall penetration. Figure 8. Minimum Horizontal Run - Standard Termination. DO NOT FILL AIR SPACE WITH ANY TYPE OF INSULATION. Standard Horizontal 5” min. Termination Cap 130 mm The minimum horizontal run made
Inhaltszusammenfassung zur Seite Nr. 11
Figure 11. Wall Shield Installation CORNER INSTALLATION The decorative Wall Shield, included with the Nordic QT, is used to cover the vent hole in the wall in installations 45° Elbow vented directly off the rear of the stove. Follow this procedure: Standard 1. Remove the top two 1/4” hex head screws from the HORIZONTAL TERM. CAP rear shroud of the stove. 123 1 2 3 1 2 3 1 2 3 2. Align the holes in the wall shield with the holes in the 1 2 3 1 2 3 1 2 3 123 rear shroud. 3. Secure the wall shi
Inhaltszusammenfassung zur Seite Nr. 12
Horizontal Termination Clearance Figure 15. Vent Terminal Clearances - National Fuel Gas Code. A = Clearance above grade, veranda, porch , deck, or balcony : H = *Not to be installed above a meter/regulator assembly *12 inches (30 cm) minimum. within 3 feet (90 cm) horizontally from the centerline of the regulator. B = Clearance to window or door that may be opened: 9 inches (23 cm) min./U.S. *12 inches (30 cm) min./ CAN I = Clearance to service regulator vent outlet: U.S. - 3 feet We re
Inhaltszusammenfassung zur Seite Nr. 13
Mobile Home Installation Fuel Conversion The Nordic QT can be installed for use in a mobile home The Nordic QT gas stove is shipped from the factory in the U.S. and Canada provided: equipped to burn NATURAL GAS only. If PROPANE gas is to be used as fuel, the appliance must first be converted 1. The stove is secured to the floor of the mobile home. for use with propane. Use Propane Conversion Kit Use Jøtul Floor Bracket Kit #154388. 154379, supplied with the appliance. 2. Provision must be made
Inhaltszusammenfassung zur Seite Nr. 14
Gas Conversion Procedure Refer to fig. 27, Illustrated Parts Breakdown, to identify 16. Reassemble the stove, apply gas to the system and part numbers below. check for leaks using a soapy water solution. NEVER USE AN OPEN FLAME TO CHECK FOR GAS LEAKS. 1. Turn off gas supply to stove. 2. Remove the stove Top Plate (3). Correct gas pressure is essential for efficient and safe operation of this appliance. Correct gas pressure 3. Remove the front plate from the stove. Pull the must be established
Inhaltszusammenfassung zur Seite Nr. 15
Gas Supply Connection The gas supply line connection is made to the valve just inside the left rear leg. The gas supply line should be 3/8" npt with a 1/2" diameter supply, or the appropriate size to provide sufficient gas pressure to the valve regardless of the input setting. The use of Flexible Gas Appliance Connectors is acceptable in many areas in the U.S. However, Canadian methods vary depending on local code. ALL INSTALLATIONS MUST COMPLY WITH LOCAL CODE OR IN THE ABSENCE OF LOCAL CODE, MU
Inhaltszusammenfassung zur Seite Nr. 16
Gas Pressure High Altitude Adjustment Correct gas pressure is essential for efficient and safe Higher altitudes affect the atmospheric pressure and operation of the Nordic QT gas stove. It is important that heat value of gaseous fuels. When installing the Nordic the correct pressure is established at the time of the QT in high altitude (above 2500'), it will be necessary to installation. Proper gas pressure provides a consistent compensate for the thinner air (less volume of oxygen flow of ga
Inhaltszusammenfassung zur Seite Nr. 17
Flame Appearance / Air Shutter Adjustment Derating Procedure: 1. To derate this unit, install the appropriate orifice per The GF100 DV NORDIC QT gas stove is shipped from the the High Altitude chart. factory equipped to burn Natural gas. If the stove has been converted for use with propane, will require adjust- 2. Remove the log support/burner tube to expose the ment. THE AIR SHUTTER SHOULD BE SET: main burner orifice. 3. Using a 1/2” open ended wrench or a deep-well 1/4” open for natural gas
Inhaltszusammenfassung zur Seite Nr. 18
Optional Wall Thermostat or Remote Control Log Set Installation Use only a 750 millivolt DC two-wire circuit thermostat The Nordic QT is equipped with a one piece log set and is with this appliance. The thermostat should be placed in packaged in bubble wrap inside the firebox. The log set the same room as the heater, typically 5 feet off the must be removed from the packaging and arranged in floor. Avoid drafty areas or any area that may affect the the unit prior to start up of the gas stove. Do
Inhaltszusammenfassung zur Seite Nr. 19
System Check ! 1. PURGING THE GAS LINE: When lighting the appli- ! ance for the first time, it will take a few moments to clear the gas line of air. Once this purge is complete, the appliance will operate as described in the lighting instructions. See the inside back cover of this manual or the stove Rating Plate attached the bottom of the stove. Subsequent burner starts will not require purging the gas line unless the supply line is shut off. 2. PILOT FL
Inhaltszusammenfassung zur Seite Nr. 20
Operation Maintenance The Nordic QT Direct Vent gas stove and its venting Familiarize yourself with the controls of the GF100 system should be inspected before use and at least Nordic QT. Make sure that anyone else using the appli- annually by a qualified service technician. ance is also familiar with the controls and operation procedures. Always follow the Lighting Instructions on IMPORTANT: the inside back cover of this manual and also located on ALWAYS TURN OFF THE GAS SUPPLY TO THE STOVE BE