Inhaltszusammenfassung zur Seite Nr. 1
®
Innovative Technology TVSS Products
Instruction Manual:
IM01005012E
XT-40 & IT-RSS
Rev. 1 – February 2007
Installation
Contents
Page
1 Introduction ............................................................................. 1
1.1 Scope......................................................................... 1
1.2 XT-40 Catalog Numbering System............................ 1
1.3 IT-RSS System Wiring and Maximum Voltages........ 1
1.4 Safety Precautions.................
Inhaltszusammenfassung zur Seite Nr. 2
IM01005012E XT-40 & IT-RSS Installation Register Your Warranty On-Line at http://www.itvss.com/ Notice: Product improvements and enhancements are continuous; therefore the specifications and information contained in this document may change without notice. Eaton Corporation shall not be liable for errors contained herein or for incidental or consequential damages in connection with the furnishing, performance, or use of this material. No part
Inhaltszusammenfassung zur Seite Nr. 3
XT-40 & IT-RSS Installation IM01005012E 1 INTRODUCTION 1.1 Scope This installation manual contains the information necessary to install Eaton Corporation’s XT-40 and IT-RSS Surge Protective Devices (SPDs). System wiring and voltage information for these devices are provided in Sections 1.2 and 1.3. If you require further information regarding a particular installation, contact Power Quality Technical Support at 1-800-809-2772. 1.2 XT-40 Catalog Numbering System XT-40- 3Y101 Config
Inhaltszusammenfassung zur Seite Nr. 4
IM01005012E XT-40 & IT-RSS Installation 1.4 Safety Precautions A licensed/qualified electrician must complete all instructions and measurements described in this instruction in accordance with the U.S. National Electrical Code, state and local codes, or other applicable country codes. The U.S. National Electrical Code and state and local requirements (or other applicable country codes) supersede this instruction. Read and understand all instructions before beginning installation. WARNIN
Inhaltszusammenfassung zur Seite Nr. 5
XT-40 & IT-RSS Installation IM01005012E 2 INSTALLATION 2.1 Before Installation Perform or plan the following before installing the SPD: 1. Locate your electrical system’s applicable wiring diagram in Sections 2.2 & 2.3 2. Verify that your electrical system’s voltage and wiring configuration matches that of the SPD as shown on its label. 3. De-energize the SPD, and follow safe work practices to avoid an electrical shock hazard. 4. Ensure that a Neutral to Ground/Earth bond is present at
Inhaltszusammenfassung zur Seite Nr. 6
IM01005012E XT-40 & IT-RSS Installation 2.2 XT-40 Wiring Diagrams Single Phase (1P101, 1P201) Split Phase (1S101) PHASE A PHASE A Use Interrupt Device if connected to Phase B NEUTRAL NOT Neutral NETURAL CIRCUIT CIRCUIT or PHASE B PHASE B INTERRUPT INTERRUPT DEVICE DEVICE GROUND GROUND Solid bond between Ground/Earth and XT-40 XT-40 Neutral at service entrance or serving isolation transformer 3-Phase Wye (Star) (3Y101, 3Y201, 3Y300) 3-Phase Delta (No Neut.) (NN201, NN400, NN501) PHASE A
Inhaltszusammenfassung zur Seite Nr. 7
XT-40 & IT-RSS Installation IM01005012E 2.3 IT-RSS Wiring Diagram Split Phase – 288 Vac Phase to Phase Max. PHASE A CIRCUIT PHASE B INTERRUPT DEVICE GROUND IT-RSS 2.4 Installing Circuit Interrupt Devices The SPD must be connected to the electrical system through a 30 A circuit interrupt device as listed in Table 2-1. The circuit interrupt device can consist of fuses, individual circuit breakers (single breaker for each phase), or a multi-pole / single throw breaker. A pre-exist
Inhaltszusammenfassung zur Seite Nr. 8
IM01005012E XT-40 & IT-RSS Installation 2.5 Conduit Installation When planning the conduit installation, avoid using 90° elbows and keep the conduit run as short and straight as possible. See Figure 2-1. When applicable, use weatherproof (corrosion resistant) conduit and fittings to maintain the enclosure’s NEMA 4 or 4X rating. If the system utilizes an isolated ground, then the SPD’s housing must be isolated from ground using insulated conduit fittings. Figure 2-1. Conduit Installation
Inhaltszusammenfassung zur Seite Nr. 9
XT-40 & IT-RSS Installation IM01005012E Figure 2-2. XT-40 & IT-RSS Mounting Dimensions 5.58 (141.7) 4.73 (120.1) 0.75 (19.0) Internally 3.23 Threaded Conduit Fitting (82.0) 4.17 (105.9) 4.80 (121.9) 2.40 (61.0) Mounting Holes 1.77 Under Lid (4) (45.0) 1.38 3.15 (35.1) (80.0) Note: Remove cover to 2.87 2.48 gain access to the (73.0) (63.0) mounting hole shafts. 0.79 3.15 (80.0) (20.1) 0.25 Mounting Weight: 3 lb (6.4) Hole Shafts Dimensions: Inches (mm) 2.7 Wiring SPD to Electrical System
Inhaltszusammenfassung zur Seite Nr. 10
IM01005012E XT-40 & IT-RSS Installation 2.8 Power Up and System Checkout Apply system power and observe that the LED(s) on the front of the SPD should glow. One LED should glow for each Phase voltage being monitored. Should there be a significant difference in brightness, check the phase rotation of the panel and ensure that the SPD’s Phase wires are connected to the correct phase. Slight differences in brightness DO NOT indicate a faulty device, rather specification tolerance differences
Inhaltszusammenfassung zur Seite Nr. 11
XT-40 & IT-RSS Installation IM01005012E Notes: Rev. 1 – 2/2007 Page 9
Inhaltszusammenfassung zur Seite Nr. 12
Eaton Corporation 1000 Cherrington Parkway Moon Township, PA 15108-4312 USA http://www.itvss.com © 2007 Eaton Corporation For additional information please call: All Rights Reserved Power Quality Technical Support Center Publication No. IM01005012E 1-800-809-2772 Rev. 1 – February 2007