Inhaltszusammenfassung zur Seite Nr. 1
Installation
Instructions
For Service Only
SS-2/IR/STD
SS-2/IR/JUV
Express® Lavatory
System SS-Series
(Standard* and Juvenile Height)
*Express® Lavatory Systems
are ADA compliant.
Table of Contents
Pre-Installation Information . . . . . . . . . . . . . . . .2
Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . .3-4
Installation Instructions . . . . . . . . . . . . . . . . 5-11
IMPORTANT Cleaning and Maintenance Instructions . . . . . .12
Soap Dispenser Maintenance . . . . . . . . . .
Inhaltszusammenfassung zur Seite Nr. 2
Express® Lavatory System SS-Series SS-2/IR/STD, SS-2/IR/JUV Installation Instructions - For Service Only Pre-Installation Information Barrier-free and ADA compliant - standard height mounting The SS-2/IR/STD Express® Lavatory System must have a rim height of 34" above finished floor to be compliant with Americans with Disabilities Act (ADA). When mounted at 34" rim height, the Express® meets ADA, ANSI and UFAS requirements for barrier-free clearances, reaches and controls. Always check local co
Inhaltszusammenfassung zur Seite Nr. 3
Express® Lavatory System SS-Series Installation Instructions - For Service Only SS-2/IR/STD, SS-2/IR/JUV SS-2/IR/STD Express® Lavatory System Dimensions Standard Height Mounting 38-1/4" (971) 8" (203) 6" (152) 22" (559) 34" (864 50" (1270) 8-1/2" (216) 21" (533) 10" (254) Radius 8" (203) Radius 30" (762) Bradley Corporation 215-1243 Rev. D; EN 03-813 5/11/04 3
Inhaltszusammenfassung zur Seite Nr. 4
Express® Lavatory System SS-Series SS-2/IR/STD, SS-2/IR/JUV Installation Instructions - For Service Only 11" (279) 38" (965) 34" Standard Height (864) 29" (737) SS-2/IR/STD 9" 4" (229) 6" (102) (152) 11" (279) 34" 30" (864) (762) 25" (635) Juvenile Height SS-2/IR/JUV 4" 9" (102) 6" (229) (152) 4 5/11/04 Bradley Corporation 215-1243 Rev. D; EN 03-813
Inhaltszusammenfassung zur Seite Nr. 5
Express® Lavatory System SS-Series Installation Instructions - For Service Only SS-2/IR/STD, SS-2/IR/JUV Installation Instructions Step 1: Rough in Note: See Figure 1a below (for Standard Height) and Figure 1b on page 6 (for Juvenile Height) when roughing in the Express®. IMPORTANT: Flush the supply lines before making connections. Debris in supply lines will cause the valves to malfunction. IMPORTANT: Dimensions shown in Figure 1a are for a Standard Height Express® only. 1. Rough in 1/2" NPT
Inhaltszusammenfassung zur Seite Nr. 6
Express® Lavatory System SS-Series SS-2/IR/STD, SS-2/IR/JUV Installation Instructions - For Service Only SS-2/IR/JUV Express® Lavatory System Dimensions Juvenile Height Mounting 23-1/2" 23-1/2" (597) (597) 9-3/8" 9-3/8" (238) (238) (MM) 13-1/2" 1" (25) (343) 2-3/4" 3" (70) (76) 1-1/2" NPT DRAIN - STUB OUT 2" (50) 1/2" NPT HOT AND 28" FROM WALL COLD SUPPLIES, (711) OR TEMPERED 110 Volt GFCI SUPPLY - STUB 24-5/8" ELECTRICAL OUT 2" (50) FROM (625) OUTLET WALL 21" (533) 15-1/4" 15-5/8" (6) 3/8" WAL
Inhaltszusammenfassung zur Seite Nr. 7
Express® Lavatory System SS-Series Installation Instructions - For Service Only SS-2/IR/STD, SS-2/IR/JUV Installation Instructions continued . . . Step 1: Rough in continued . . . IMPORTANT: Turn OFF electrical power to the outlet when installing the Express®. 3. Install the 110 volt GFCI electrical outlet per local code at the location shown in Figure 2. 4. Install (6) 3/8" wall anchors with a minimum pull-out rating of 1,000 lbs. (supplied by installer) at the locations shown in Figures 1a o
Inhaltszusammenfassung zur Seite Nr. 8
Express® Lavatory System SS-Series SS-2/IR/STD, SS-2/IR/JUV Installation Instructions - For Service Only Installation Instructions continued . . . Step 2: Mounting frame to wall 1. Remove the eight Torx-head screws securing the panel to the frame, and remove the panel (see Figure 3). Note: Scuff panel does not need to be removed. 2. Position the frame against the wall, ensuring that it is level. If necessary, insert shims under the frame until level. Note: When mounted, the Standard and Ju
Inhaltszusammenfassung zur Seite Nr. 9
Express® Lavatory System SS-Series Installation Instructions - For Service Only SS-2/IR/STD, SS-2/IR/JUV Installation Instructions continued . . . Step 3: Installing bowl assembly IMPORTANT: Moving and positioning the bowl will require more than one person. Note: Refer to Figure 5 below when installing the bowl assembly. 1. With someone to assist you, place the bowl assembly squarely onto the frame. 2. Attach the front of the bowl assembly to the frame using the two 1/4"-20 x 3/8" pan-head sc
Inhaltszusammenfassung zur Seite Nr. 10
Express® Lavatory System SS-Series SS-2/IR/STD, SS-2/IR/JUV Installation Instructions - For Service Only Installation Instructions continued . . . Step 4: Connecting supply and drain 1. FOR HOT AND COLD SUPPLY: Connect the flexible hoses installed to the Vernatherm™ Mixing Valve to the hot and cold water supply piping from the wall (see Figure 6a). Note: The red marking on Vernatherm™ Mixing Valve indicates hot water supply inlet. FOR SINGLE TEMPERED SUPPLY: Attach the stop/check/strainer to
Inhaltszusammenfassung zur Seite Nr. 11
Express® Lavatory System SS-Series Installation Instructions - For Service Only SS-2/IR/STD, SS-2/IR/JUV Installation Instructions continued . . . Step 5: Connecting electrical and supply tubing WARNING: The Express® must be connected to the 24 VAC Class II plug-in transformer provided. Connection to 110 VAC can result in damage to the electronics and cause personal injury. CAUTION: Connection of leads other than shown may cause permanent damage to the sensor. 1. Snap the sensor circuit plug
Inhaltszusammenfassung zur Seite Nr. 12
Express® Lavatory System SS-Series SS-2/IR/STD, SS-2/IR/JUV Installation Instructions - For Service Only Cleaning and Maintenance Instructions IMPORTANT: Strong alkaline or acid-based chemicals and cleansers should not be used to clean Terreon®. If these chemicals come in contact with the Terreon® surface, wipe off the surface immediately and flush with soapy water. Terreon® and panel maintenance The bowl and sprayhead cover are constructed of Terreon®, a densified solid surface material compose
Inhaltszusammenfassung zur Seite Nr. 13
Express® Lavatory System SS-Series Installation Instructions - For Service Only SS-2/IR/STD, SS-2/IR/JUV Soap Dispenser Maintenance Step 1: Fill soap dispensers The two soap valves will dispense vegetable/coconut oil liquid soaps, synthetic detergents, viscous lotion soaps, and antiseptic solutions. A 10-15% concentration is recommended for vegetable or coconut oil liquid soaps. Synthetic detergents, lotion soaps, and antiseptic soaps require no dilution. 1. Using two screwdrivers (or similar to
Inhaltszusammenfassung zur Seite Nr. 14
Express® Lavatory System SS-Series SS-2/IR/STD, SS-2/IR/JUV Installation Instructions - For Service Only Soap Dispenser Maintenance continued . . . Step 2: Change soap type 1. Pour out all of the soap from the dispenser. 2. Rinse the soap dispenser with hot water several times until all of the residue is removed, and pump the valve until clean water appears. 3. Rinse the dispenser with ethyl alcohol and allow to air dry. 4. After the dispenser is dry, pour the new soap into the soap dispenser
Inhaltszusammenfassung zur Seite Nr. 15
Express® Lavatory System SS-Series Installation Instructions - For Service Only SS-2/IR/STD, SS-2/IR/JUV Assembly of Components SPRAYHEAD COVER/SHELF Paneling (part number varies with color of unit—contact your local Bradley representative for assistance) FRAME Standard S17-274 Juvenile S17-275 (12) TORX-HEAD PANEL SCREW 160-378 (GRAY) 160-378A (PUTTY) 160-378B (COAL) SCUFF PANEL ACCESS PANEL 185-030 (GRAY) Standard 186-1153 (GRAY) 185-030A (PUTTY) Standard 186-1153A (PUTTY) 185-030B (COAL) S
Inhaltszusammenfassung zur Seite Nr. 16
Express® Lavatory System SS-Series SS-2/IR/STD, SS-2/IR/JUV Installation Instructions - For Service Only Assembly of Components continued . . . Sensor assembly and solenoid valve To access solenoids and sensors: Remove the eight Phillips-head screws located in the bottom of the sprayhead body and lift the cover/shelf off. To re-install sprayhead cover/shelf: Position the cover/shelf on the sprayhead body and secure it to the sprayhead body using the eight screws provided. SCREW 160-120 NUT 1/
Inhaltszusammenfassung zur Seite Nr. 17
Express® Lavatory System SS-Series Installation Instructions - For Service Only SS-2/IR/STD, SS-2/IR/JUV Check Valve Troubleshooting If water just dribbles or does not flow from sprayhead: 1. Close the stops and check the valves that supply water to the lavatory system. 2 Inspect the stop/check valves for proper installation. 3. Remove the flexible hoses from the stop/check valves and clean the strainers, if necessary. If water sprayhead delivers all hot or cold water: 1. Close the stops and ch
Inhaltszusammenfassung zur Seite Nr. 18
Express® Lavatory System SS-Series SS-2/IR/STD, SS-2/IR/JUV Installation Instructions - For Service Only 18 5/11/04 Bradley Corporation 215-1243 Rev. D; EN 03-813
Inhaltszusammenfassung zur Seite Nr. 19
Express® Lavatory System SS-Series Installation Instructions - For Service Only SS-2/IR/STD, SS-2/IR/JUV Vernatherm™ Mixing Valve Maintenance and Service *Repair kit S45-049 is pre-packaged and includes O-Ring, Flip Ring, Power Element and Spring. Maintenance Instructions Body S73-027 1. Disassemble the Vernatherm™ Valve as shown, Body (chrome) being careful not to damage the power element. Power Element* S73-028 S27-019 Replace the element, if necessary. Flip Ring* 2. If necessary, remove the o