Inhaltszusammenfassung zur Seite Nr. 1
Installation
Instructions
®
Advantium 120V
Built-In SpeedCook
Ovens
PSB1200
PSB1201
ZSC1201
ZSC1202
For a Spanish version of this manual, visit our Website at ge.com.
Para consultar una version en español de este manual de instrucciones,
visite nuestro sitiode internet ge.com.
49-40593-1
MFL59060901
12-08 JR
Inhaltszusammenfassung zur Seite Nr. 2
Safety Information CONTENTS BEFORE YOU BEGIN Read these instructions completely and carefully. Design Information Models Available......................................................................2 IMPORTANT — Save these instructions Product Dimensions and Clearances ............................3 for local inspector’s use. Tools and Parts Required ....................................................3 Parts Supplied ..........................................................................3
Inhaltszusammenfassung zur Seite Nr. 3
Design Information PRODUCT DIMENSIONS AND CLEARANCES NOTE: Appearance will vary by model. 21-1/2″ 29-3/4 29 3/4”″ 1-1/8″ 19 1/32” 19″ 13/16″ 5/8″ 13″ TOOLS AND PARTS REQUIRED ADVANCE PLANNING • These ovens may be installed directly into a 30″ wide (NOT SUPPLIED) oven cabinet. • #2 Phillips screwdriver • Cutout dimensions are NOT the same for installation • Hand-held drill with or without an accessory storage drawer. • High speed drill bit, 3/32″ diameter Make sure to use the correct cutout wh
Inhaltszusammenfassung zur Seite Nr. 4
Installation Preparation ELECTRICAL REQUIREMENTS Single Advantium 120 Installation: This product requires a 120-volt, 60 Hz, 15-amp circuit and draws 1.8 kilowatts. This product must be connected to a supply circuit of the proper voltage and frequency. • Wire size must conform to the requirements of the National Electrical Code or the prevailing local code for this kilowatt rating. • The power supply cord and plug should be brought to a separate 15 or 20 ampere branch circuit single grounded re
Inhaltszusammenfassung zur Seite Nr. 5
Installation Preparation Preparation WITHOUT an Accessory Storage Drawer PREPARE THE OPENING PREPARE THE OPENING (cont.) The Advantium 120V can be installed in Installation over a GE/Monogram combination with other GE/Monogram appliances. Warming Drawer: Always follow each product’s Installation 30″ 23-1/2″ Instructions to complete the installation. Construct Single Advantium 120V Installation: Solid Bottom Min. 3/8″ Order a 30″ wide single oven cabinet or cut Plywood the opening in a wall t
Inhaltszusammenfassung zur Seite Nr. 6
Installation Preparation Preparation WITHOUT an Accessory Storage Drawer PREPARE THE OPENING (cont.) PREPARE THE OPENING (cont.) Installation over a GE/Monogram oven: Installation over a GE/Monogram Oven and Warming Drawer: 30″ 23-1/2″ 30″ 23-1/2″ Construct Solid Construct Solid Bottom Min. Bottom Min. 3/8″ Plywood 3/8″ Plywood Supported by 25-1/4″ Supported by 25-1/4″ 2 x 4 or 2 x 2 2 x 4 or 2 x 2 Runners all Runners all Four Sides Four Sides 17-1/2″ 2″ Min. 17-1/2″ 2″ Min. (3″ Recommende
Inhaltszusammenfassung zur Seite Nr. 7
Installation Preparation Preparation WITHOUT an Accessory Storage Drawer PREPARE THE OPENING (cont.) PREPARE THE OPENING (cont.) Installation over another GE/Monogram Installation under a GE/Monogram Under-the-Counter (UTC) oven: Microwave Oven and over a Warming Drawer: 30″ 23-1/2″ 30″ 23-1/2″ Construct Solid Construct Solid Bottom Min. Bottom Min. 3/8″ Plywood 3/8″ Plywood Supported by 25-1/4″ Supported by 2 x 4 or 2 x 2 25-1/4″ 2 x 4 or 2 x 2 Runners all Runners all Four Sides Four Sides
Inhaltszusammenfassung zur Seite Nr. 8
Installation Preparation Preparation WITHOUT an Accessory Storage Drawer 23-1/2″ PREPARE THE OPENING (cont.) Installation beside another GE/Monogram Built-in Speedcook Oven: • If you are mounting one Under-the-Counter GE/Monogram oven beside the other, use the 25-1/4″ 25-1/4″ dimensions shown. The middle rail separating the two openings may need to be larger than 17-1/2″ the 4-1/2″ minimum shown. 17-1/2″ 4-1/2″ Min. (5-1/2″ Recommended) PREPARE THE OPENING (cont.) Installation under a GE/Mono
Inhaltszusammenfassung zur Seite Nr. 9
Installation Preparation Preparation WITH an Accessory Storage Drawer NOTE: MODEL ZSC1201 CAN ONLY BE INSTALLED WITH AN ACCESSORY STORAGE DRAWER IF INSTALLED ABOVE 36-3/4″. MODEL ZSC1202 CANNOT BE INSTALLED WITH AN ACCESSORY STORAGE DRAWER. SEE INSTALLATION PREPARATION WITHOUT AN ACCESSORY STORAGE DRAWER FOR THIS MODEL. PREPARE THE OPENING (cont.) PREPARE THE OPENING (cont.) The Advantium 120V can be installed in Installation over a GE/Monogram combination with other GE/Monogram appliances. W
Inhaltszusammenfassung zur Seite Nr. 10
Installation Preparation Preparation WITH an Accessory Storage Drawer NOTE: MODEL ZSC1201 CAN ONLY BE INSTALLED WITH AN ACCESSORY STORAGE DRAWER IF INSTALLED ABOVE 36-3/4″. MODEL ZSC1202 CANNOT BE INSTALLED WITH AN ACCESSORY STORAGE DRAWER. SEE INSTALLATION PREPARATION WITHOUT AN ACCESSORY STORAGE DRAWER FOR THIS MODEL. PREPARE THE OPENING (cont.) PREPARE THE OPENING (cont.) Installation over a GE/Monogram Oven: Installation over a GE/Monogram Oven and Warming Drawer: 30″ 23-1/2″ 30″ 23-1/2″ C
Inhaltszusammenfassung zur Seite Nr. 11
Installation Preparation Preparation WITH an Accessory Storage Drawer NOTE: MODEL ZSC1201 CAN ONLY BE INSTALLED WITH AN ACCESSORY STORAGE DRAWER IF INSTALLED ABOVE 36-3/4″. MODEL ZSC1202 CANNOT BE INSTALLED WITH AN ACCESSORY STORAGE DRAWER. SEE INSTALLATION PREPARATION WITHOUT AN ACCESSORY STORAGE DRAWER FOR THIS MODEL. PREPARE THE OPENING (cont.) PREPARE THE OPENING (cont.) Installation over another GE/Monogram Installation under a GE/Monogram Under-the-Counter (UTC) oven: Microwave Oven and
Inhaltszusammenfassung zur Seite Nr. 12
Installation Preparation Preparation WITH an Accessory Storage Drawer NOTE: MODEL ZSC1201 CAN ONLY BE INSTALLED WITH AN ACCESSORY STORAGE DRAWER IF INSTALLED ABOVE 36-3/4″. MODEL ZSC1202 CANNOT BE INSTALLED WITH AN ACCESSORY STORAGE DRAWER. SEE INSTALLATION PREPARATION WITHOUT AN ACCESSORY STORAGE DRAWER FOR THIS MODEL. 23-1/2″ PREPARE THE OPENING (cont.) Installation beside another GE/Monogram Built-in Speedcook Oven: • If you are mounting one Under-the-Counter GE/Monogram oven beside the oth
Inhaltszusammenfassung zur Seite Nr. 13
Installation Instructions 1 REMOVE THE PACKAGING AND PARTS • Remove all packing material and tape. • Locate parts package containing mounting screws. • Remove the oven from the carton. Do not lift unit by handle or conduit. Two people are required to lift this oven. • Open the door and remove any packaging in oven. Rack CAUTION: If installing the Advantium Owner’s Manual 120V Oven below 36″, you must use the plastic bottom trim due to burn risk to children. The plastic trim acts as insulation
Inhaltszusammenfassung zur Seite Nr. 14
Installation Instructions 2 DOOR TRIM REMOVAL FOR ABOVE 3 SLIDE THE OVEN INTO THE CUTOUT 36″ INSTALLATION ONLY CAUTION: Two people are required to If installing the Advantium 120V Oven above 36″ lift the oven into the opening. Grasp the bottom from the floor, you may remove the plastic trim at front and rear. DO NOT USE THE HANDLE TO LIFT from the bottom of the door for esthetic purposes THE OVEN. DAMAGE WILL OCCUR. if desired. CAUTION: If installing the Advantium 120V Oven below 36″, do not
Inhaltszusammenfassung zur Seite Nr. 15
Installation Instructions 4 INSTALL BOTTOM TRIM 6 INSTALL MOUNTING SCREWS CAUTION: If installing the Advantium 120V Oven below 36″, you must use the plastic bottom trim due to burn risk to children. The plastic trim acts as insulation and will help prevent burns to children from hot surfaces. NOTE: If installing the Advantium 120V Oven with an accessory storage drawer, the bottom trim is not required. Proceed to Step 5. • Installation Below 36″, align trim tabs on the plastic • Slide the oven t
Inhaltszusammenfassung zur Seite Nr. 16
GE Consumer & Industrial Appliances Assembly Instructions ® Advantium Built-In Accessory Storage Drawer JX2200, JX2201, ZX2201 MODELS AVAILABLE BEFORE YOU BEGIN Profile Models: Read these instructions completely and carefully. Read JX2200BB–Black the Installation Instructions for the Advantium 120V or JX2201SS–Stainless Steel 240V oven completely and carefully for cutout dimensions and step-by-step instructions. Monogram Models: IMPORTANT — Save these instructions for ZX2201SS–Stainless Steel (f
Inhaltszusammenfassung zur Seite Nr. 17
ASSEMBLY TO ADVANTIUM BUILT-IN SPEEDCOOK OVEN 1 REMOVE PACKAGING AND PARTS 3 ASSEMBLING THE OVEN TO DRAWER A Place storage drawer on a surface with • Remove the drawer from the carton. the front of drawer hanging over the edge • Remove all packing material and tape. of the surface. Not placing the front edge • Open the drawer and remove any parts inside. of drawer over the edge of the surface may result in damage to the drawer since the front • Locate parts. edge of drawer hangs below the bot
Inhaltszusammenfassung zur Seite Nr. 18
ASSEMBLY TO ADVANTIUM BUILT-IN SPEEDCOOK OVEN ASSEMBLING THE OVEN TO DRAWER (cont.) C Remove the front two bottom screws on each side of the oven and the top center screw on each side of the storage drawer. D Place the side supports into the tabs on the drawer and secure using the screws supplied and the screws removed in Step C. Side Support 120v only E The oven and storage drawer assembly is now ready to be installed. Return to the Advantium 120V or 240V Built-In SpeedCook Oven Installation In
Inhaltszusammenfassung zur Seite Nr. 19
Notes 19
Inhaltszusammenfassung zur Seite Nr. 20
NOTE: While performing installations described in this book, safety glasses or goggles should be worn. GE Consumer & Industrial NOTE: Product improvement is a continuing endeavor at Appliances General Electric. Therefore, materials, appearance and General Electric Company specifications are subject to change without notice. Louisville, KY 40225 ge.com Printed in Korea